TenderDekho Logo
Closed GEM

Government Tender Published for Bathroom Tap Steel,Bathroom Tap Plastic,Wash Basin Tap Steel,PVC Elbow 1,PVC Tee,PVC Union,PVC Coup in GANDHI NAGAR, GUJARAT

Bid Publish Date

18-Sep-2026, 4:13 pm

Bid End Date

08-Oct-2026, 6:00 pm

EMD

₹33,058

Value

₹11,01,933

Generate Docs

Progress

Issue18-Sep-2026, 4:13 pm
Corrigendum30-Sep-2026
AwardPending

Deputy Conservator Of Forest Training Division invites bids for Bathroom Tap Steel, Bathroom Tap Plastic, Wash Basin Tap Steel, PVC Elbow 1, PVC Tee, PVC Union, PVC Coupler, PVC Pipe, PVC Nipple, PVC Tap, PVC MT, PVC FT, PVC End Cap, PVC Valve, PVC Tee 1, PVC Union 1, PVC Coupler 1, PVC Pipe 1 per Running Foot, PVC Nipple 1, PVC Tap 1, PVC MT 1, PVC FT 1, PVC End Cap 1, PVC Valve 1, PVC Elbow 2, PVC Tee 2, PVC Union 2, PVC Coupler 2, PVC Pipe 2 per Running Foot, PVC Nipple 2, PVC Tap 2, PVC MT 2, PVC FT 2, PVC End Cap 2, PVC Valve 2, PVC Elbow, PVC End Cap 2. 5, PVC Valve 2. 5, PVC Elbow 4, PVC Tee 4, PVC Union 4, PVC Coupler 4, PVC Pipe 4 per Running Foot, PVC Nipple 4, PVC Tap 4, PVC MT 4, PVC FT 4, PVC End Cap 4, PVC Valve 4, Joint Coupler 4, CPVC Elbow, CPVC Tee, CPVC Union, CPVC Coupler, CPVC Pipe per Running Foot, CPVC Nipple, CPVC Tap, CPVC MT, CPVC FT, CPVC End Cap, CPVC Valve, CPVC Elbow 1, CPVC Tee 1, CPVC Union 1, CPVC Coupler 1, CPVC Pipe 1 per Running Foot, CPVC Nipple 1, CPVC Tap 1, CPVC MT 1, CPVC FT 1, CPVC End Cap 2, cpcv valve, CPVC Elbow 2, CPVC Tee 2, CPVC Union 2, CPVC Coupler 2, CPVC Pipe 2per Running Foot, CPVC Nipple 2, CPVC Tap 2, CPVC MT 2, CPVC FT 2, CPVC Valve 2, CPVC Elbow 4, CPVC Tee 4, CPVC Union 4, CPVC Coupler 4, CPVC Pipe 4 per Running Foot, CPVC Nipple 4, CPVC Tap 4, CPVC MT 4, CPVC FT 4, CPVC End Cap 4, CPVC Valve 4, CPVC Solvent Cement Solution, Teflon Tape, PVC Toilet Seat Cover Set, PVC Tank for Vertical Tub Flush, Wash Basin Medium, Vertical Tub Commode, Squatting Tub Commode Pan, Flush Cock, Steel Tap, Steel Tap 1, Wash Basin Tap, Shower, Mirror, Bathroom Steel Set, Grey Pipe per Running Foot, Grey Elbow 4, Grey Tee 4, Grey Union 4, Grey Coupler 4, Grey Pipe 4 per Running Foot, Grey Nipple 4, Grey MT 4, Grey FT 4, Grey End Cap 4, Grey Valve 4, UPVC Solvent Cement Solution, White Cement 1 kg, Measuring Tape, Ceramic Clay Pipe, Ceramic Clay Elbow, Drain Sewer Cleaning Work, Sewer Line Cleaning Work using Machine, Well Emptying Pumping Work using Machine, Sewer Drainage Lids, Visit Service Charge in GANDHI NAGAR, GUJARAT. Quantity: 4426. Submission Deadline: 08-10-2026 18: 00: 00. Submit your proposal before the deadline.

Advertisement

Authority & Contact

Organization

Deputy Conservator Of Forest Training Division

Office Name

Tro Bhavan Nr Akshardham Mandir Gandhinagar

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

4426

Category

Bathroom Tap Steel

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+20%

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

22

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Bathroom Tap Steel , Bathroom Tap Plastic , Wash Basin Tap Steel , PVC Elbow 1 , PVC Tee , PVC Union , PVC Coupler , PVC Pipe , PVC Nipple , PVC Tap , PVC MT , PVC FT , PVC End Cap , PVC Valve , PVC Tee 1 , PVC Union 1 , PVC Coupler 1 , PVC Pipe 1 per Running Foot , PVC Nipple 1 , PVC Tap 1 , PVC MT 1 , PVC FT 1 , PVC End Cap 1 , PVC Valve 1 , PVC Elbow 2 , PVC Tee 2 , PVC Union 2 , PVC Coupler 2 , PVC Pipe 2 per Running Foot , PVC Nipple 2 , PVC Tap 2 , PVC MT 2 , PVC FT 2 , PVC End Cap 2 , PVC Valve 2 , PVC Elbow , PVC End Cap 2.5 , PVC Valve 2.5 , PVC Elbow 4 , PVC Tee 4 , PVC Union 4 , PVC Coupler 4 , PVC Pipe 4 per Running Foot , PVC Nipple 4 , PVC Tap 4 , PVC MT 4 , PVC FT 4 , PVC End Cap 4 , PVC Valve 4 , Joint Coupler 4 , CPVC Elbow , CPVC Tee , CPVC Union , CPVC Coupler , CPVC Pipe per Running Foot , CPVC Nipple , CPVC Tap , CPVC MT , CPVC FT , CPVC End Cap , CPVC Valve , CPVC Elbow 1 , CPVC Tee 1 , CPVC Union 1 , CPVC Coupler 1 , CPVC Pipe 1 per Running Foot , CPVC Nipple 1 , CPVC Tap 1 , CPVC MT 1 , CPVC FT 1 , CPVC End Cap 2 , cpcv valve , CPVC Elbow 2 , CPVC Tee 2 , CPVC Union 2 , CPVC Coupler 2 , CPVC Pipe 2per Running Foot , CPVC Nipple 2 , CPVC Tap 2 , CPVC MT 2 , CPVC FT 2 , CPVC Valve 2 , CPVC Elbow 4 , CPVC Tee 4 , CPVC Union 4 , CPVC Coupler 4 , CPVC Pipe 4 per Running Foot , CPVC Nipple 4 , CPVC Tap 4 , CPVC MT 4 , CPVC FT 4 , CPVC End Cap 4 , CPVC Valve 4 , CPVC Solvent Cement Solution , Teflon Tape , PVC Toilet Seat Cover Set , PVC Tank for Vertical Tub Flush , Wash Basin Medium , Vertical Tub Commode , Squatting Tub Commode Pan , Flush Cock , Steel Tap , Steel Tap 1 , Wash Basin Tap , Shower , Mirror , Bathroom Steel Set , Grey Pipe per Running Foot , Grey Elbow 4 , Grey Tee 4 , Grey Union 4 , Grey Coupler 4 , Grey Pipe 4 per Running Foot , Grey Nipple 4 , Grey MT 4 , Grey FT 4 , Grey End Cap 4 , Grey Valve 4 , UPVC Solvent Cement Solution , White Cement 1 kg , Measuring Tape , Ceramic Clay Pipe , Ceramic Clay Elbow , Drain Sewer Cleaning Work , Sewer Line Cleaning Work using Machine , Well Emptying Pumping Work using Machine , Sewer Drainage Lids , Visit Service Charge

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Pre-Bid & Qualification

Pre-Bid Date

21-09-2026 12:00:00

Pre-Bid Venue

Range Forest Officer, Training Range, Forest Hostel, Sector-30, Gandhinagar

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Gandhinagar

Delivery Pincodes

382028

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mahavir Singh Dabhi382028,Gujarat Forestry Research & Training Institute (GFRF) Nr. akshardham Mandir, J Road, Sector 30, Gandhinagar, GujaratGandhinagarGujarat38202810015-

Authority Records

ENVIRONMENT AND FOREST DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9901324.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 149 Items Sign in for GEM prices

#1

Bathroom Tap Steel

Bathroom Tap Steel

100 pieces Delivery: 15 days
#2

Bathroom Tap Plastic

Bathroom Tap Plastic

50 pieces Delivery: 15 days
#3

Wash Basin Tap Steel

Wash Basin Tap Steel

50 pieces Delivery: 15 days
#4

PVC Elbow 1

PVC Elbow 1

50 pieces Delivery: 15 days
#5

PVC Tee

PVC Tee

50 pieces Delivery: 15 days
#6

PVC Union

PVC Union

25 pieces Delivery: 15 days
#7

PVC Coupler

PVC Coupler

25 pieces Delivery: 15 days
#8

PVC Pipe

PVC Pipe

100 pieces Delivery: 15 days
#9

PVC Nipple

PVC Nipple

25 pieces Delivery: 15 days
#10

PVC Tap

PVC Tap

25 pieces Delivery: 15 days
#11

PVC MT

PVC MT

25 pieces Delivery: 15 days
#12

PVC FT

PVC FT

25 pieces Delivery: 15 days
#13

PVC End Cap

PVC End Cap

25 pieces Delivery: 15 days
#14

PVC Valve

PVC Valve

25 pieces Delivery: 15 days
#15

PVC Elbow 1

PVC Elbow 1

25 pieces Delivery: 15 days
#16

PVC Tee 1

PVC Tee 1

25 pieces Delivery: 15 days
#17

PVC Union 1

PVC Union 1

25 pieces Delivery: 15 days
#18

PVC Coupler 1

PVC Coupler 1

25 pieces Delivery: 15 days
#19

PVC Pipe 1 per Running Foot

PVC Pipe 1 per Running Foot

100 pieces Delivery: 15 days
#20

PVC Nipple 1

PVC Nipple 1

25 pieces Delivery: 15 days
#21

PVC Tap 1

PVC Tap 1

25 pieces Delivery: 15 days
#22

PVC MT 1

PVC MT 1

25 pieces Delivery: 15 days
#23

PVC FT 1

PVC FT 1

25 pieces Delivery: 15 days
#24

PVC End Cap 1

PVC End Cap 1

25 pieces Delivery: 15 days
#25

PVC Valve 1

PVC Valve 1

25 pieces Delivery: 15 days
#26

PVC Elbow 2

PVC Elbow 2

25 pieces Delivery: 15 days
#27

PVC Tee 2

PVC Tee 2

25 pieces Delivery: 15 days
#28

PVC Union 2

PVC Union 2

25 pieces Delivery: 15 days
#29

PVC Coupler 2

PVC Coupler 2

25 pieces Delivery: 15 days
#30

PVC Pipe 2 per Running Foot

PVC Pipe 2 per Running Foot

100 pieces Delivery: 15 days
#31

PVC Nipple 2

PVC Nipple 2

25 pieces Delivery: 15 days
#32

PVC Tap 2

PVC Tap 2

25 pieces Delivery: 15 days
#33

PVC MT 2

PVC MT 2

25 pieces Delivery: 15 days
#34

PVC FT 2

PVC FT 2

25 pieces Delivery: 15 days
#35

PVC End Cap 2

PVC End Cap 2

25 pieces Delivery: 15 days
#36

PVC Valve 2

PVC Valve 2

25 pieces Delivery: 15 days
#37

PVC Elbow

PVC Elbow

25 pieces Delivery: 15 days
#38

PVC Tee 2

PVC Tee 2

25 pieces Delivery: 15 days
#39

PVC Union

PVC Union

25 pieces Delivery: 15 days
#40

PVC Coupler

PVC Coupler

25 pieces Delivery: 15 days
#41

PVC Pipe

PVC Pipe

100 pieces Delivery: 15 days
#42

PVC Nipple

PVC Nipple

25 pieces Delivery: 15 days
#43

PVC Tap

PVC Tap

25 pieces Delivery: 15 days
#44

PVC MT

PVC MT

25 pieces Delivery: 15 days
#45

PVC FT

PVC FT

25 pieces Delivery: 15 days
#46

PVC End Cap 2.5

PVC End Cap 2.5

20 pieces Delivery: 15 days
#47

PVC Valve 2.5

PVC Valve 2.5

20 pieces Delivery: 15 days
#48

PVC Elbow 4

PVC Elbow 4

20 pieces Delivery: 15 days
#49

PVC Tee 4

PVC Tee 4

20 pieces Delivery: 15 days
#50

PVC Union 4

PVC Union 4

20 pieces Delivery: 15 days
#51

PVC Coupler 4

PVC Coupler 4

10 pieces Delivery: 15 days
#52

PVC Pipe 4 per Running Foot

PVC Pipe 4 per Running Foot

100 pieces Delivery: 15 days
#53

PVC Nipple 4

PVC Nipple 4

10 pieces Delivery: 15 days
#54

PVC Tap 4

PVC Tap 4

10 pieces Delivery: 15 days
#55

PVC MT 4

PVC MT 4

10 pieces Delivery: 15 days
#56

PVC FT 4

PVC FT 4

10 pieces Delivery: 15 days
#57

PVC End Cap 4

PVC End Cap 4

10 pieces Delivery: 15 days
#58

PVC Valve 4

PVC Valve 4

10 pieces Delivery: 15 days
#59

Joint Coupler 4

Joint Coupler 4

10 pieces Delivery: 15 days
#60

CPVC Elbow

CPVC Elbow

10 pieces Delivery: 15 days
#61

CPVC Tee

CPVC Tee

10 pieces Delivery: 15 days
#62

CPVC Union

CPVC Union

10 pieces Delivery: 15 days
#63

CPVC Coupler

CPVC Coupler

10 pieces Delivery: 15 days
#64

CPVC Pipe per Running Foot

CPVC Pipe per Running Foot

10 pieces Delivery: 15 days
#65

CPVC Nipple

CPVC Nipple

10 pieces Delivery: 15 days
#66

CPVC Tap

CPVC Tap

10 pieces Delivery: 15 days
#67

CPVC MT

CPVC MT

10 pieces Delivery: 15 days
#68

CPVC FT

CPVC FT

10 pieces Delivery: 15 days
#69

CPVC End Cap

CPVC End Cap

10 pieces Delivery: 15 days
#70

CPVC Valve

CPVC Valve

15 pieces Delivery: 15 days
#71

CPVC Elbow 1

CPVC Elbow 1

15 pieces Delivery: 15 days
#72

CPVC Tee 1

CPVC Tee 1

15 pieces Delivery: 15 days
#73

CPVC Union 1

CPVC Union 1

20 pieces Delivery: 15 days
#74

CPVC Coupler 1

CPVC Coupler 1

25 pieces Delivery: 15 days
#75

CPVC Pipe 1 per Running Foot

CPVC Pipe 1 per Running Foot

200 pieces Delivery: 15 days
#76

CPVC Nipple 1

CPVC Nipple 1

25 pieces Delivery: 15 days
#77

CPVC Tap 1

CPVC Tap 1

25 pieces Delivery: 15 days
#78

CPVC MT 1

CPVC MT 1

25 pieces Delivery: 15 days
#79

CPVC FT 1

CPVC FT 1

25 pieces Delivery: 15 days
#80

CPVC End Cap 2

CPVC End Cap 2

20 pieces Delivery: 15 days
#81

cpcv valve

cpcv valve

20 pieces Delivery: 15 days
#82

CPVC Elbow 2

CPVC Elbow 2

20 pieces Delivery: 15 days
#83

CPVC Tee 2

CPVC Tee 2

10 pieces Delivery: 15 days
#84

CPVC Union 2

CPVC Union 2

10 pieces Delivery: 15 days
#85

CPVC Coupler 2

CPVC Coupler 2

10 pieces Delivery: 15 days
#86

CPVC Pipe 2per Running Foot

CPVC Pipe 2per Running Foot

100 pieces Delivery: 15 days
#87

CPVC Nipple 2

CPVC Nipple 2

10 pieces Delivery: 15 days
#88

CPVC Tap 2

CPVC Tap 2

10 pieces Delivery: 15 days
#89

CPVC MT 2

CPVC MT 2

10 pieces Delivery: 15 days
#90

CPVC FT 2

CPVC FT 2

10 pieces Delivery: 15 days
#91

CPVC End Cap

CPVC End Cap

10 pieces Delivery: 15 days
#92

CPVC Valve 2

CPVC Valve 2

10 pieces Delivery: 15 days
#93

CPVC Elbow

CPVC Elbow

10 pieces Delivery: 15 days
#94

CPVC Tee

CPVC Tee

10 pieces Delivery: 15 days
#95

CPVC Union

CPVC Union

15 pieces Delivery: 15 days
#96

CPVC Coupler

CPVC Coupler

15 pieces Delivery: 15 days
#97

CPVC Pipe per Running Foot

CPVC Pipe per Running Foot

150 pieces Delivery: 15 days
#98

CPVC Nipple

CPVC Nipple

15 pieces Delivery: 15 days
#99

CPVC Tap

CPVC Tap

15 pieces Delivery: 15 days
#100

CPVC MT

CPVC MT

15 pieces Delivery: 15 days
#101

CPVC FT

CPVC FT

15 pieces Delivery: 15 days
#102

CPVC End Cap

CPVC End Cap

15 pieces Delivery: 15 days
#103

CPVC Valve

CPVC Valve

20 pieces Delivery: 15 days
#104

CPVC Elbow 4

CPVC Elbow 4

20 pieces Delivery: 15 days
#105

CPVC Tee 4

CPVC Tee 4

20 pieces Delivery: 15 days
#106

CPVC Union 4

CPVC Union 4

20 pieces Delivery: 15 days
#107

CPVC Coupler 4

CPVC Coupler 4

20 pieces Delivery: 15 days
#108

CPVC Pipe 4 per Running Foot

CPVC Pipe 4 per Running Foot

100 pieces Delivery: 15 days
#109

CPVC Nipple 4

CPVC Nipple 4

10 pieces Delivery: 15 days
#110

CPVC Tap 4

CPVC Tap 4

10 pieces Delivery: 15 days
#111

CPVC MT 4

CPVC MT 4

10 pieces Delivery: 15 days
#112

CPVC FT 4

CPVC FT 4

10 pieces Delivery: 15 days
#113

CPVC End Cap 4

CPVC End Cap 4

10 pieces Delivery: 15 days
#114

CPVC Valve 4

CPVC Valve 4

5 pieces Delivery: 15 days
#115

CPVC Solvent Cement Solution

CPVC Solvent Cement Solution

5 pieces Delivery: 15 days
#116

Teflon Tape

Teflon Tape

50 pieces Delivery: 15 days
#117

PVC Toilet Seat Cover Set

PVC Toilet Seat Cover Set

20 pieces Delivery: 15 days
#118

PVC Tank for Vertical Tub Flush

PVC Tank for Vertical Tub Flush

10 pieces Delivery: 15 days
#119

Wash Basin Medium

Wash Basin Medium

10 pieces Delivery: 15 days
#120

Vertical Tub Commode

Vertical Tub Commode

20 pieces Delivery: 15 days
#121

Squatting Tub Commode Pan

Squatting Tub Commode Pan

20 pieces Delivery: 15 days
#122

Flush Cock

Flush Cock

30 pieces Delivery: 15 days
#123

Steel Tap

Steel Tap

20 pieces Delivery: 15 days
#124

Steel Tap 1

Steel Tap 1

20 pieces Delivery: 15 days
#125

Wash Basin Tap

Wash Basin Tap

25 pieces Delivery: 15 days
#126

Shower

Shower

35 pieces Delivery: 15 days
#127

Mirror

Mirror

35 pieces Delivery: 15 days
#128

Bathroom Steel Set

Bathroom Steel Set

50 pieces Delivery: 15 days
#129

Grey Pipe per Running Foot

Grey Pipe per Running Foot

150 pieces Delivery: 15 days
#130

Grey Elbow 4

Grey Elbow 4

5 pieces Delivery: 15 days
#131

Grey Tee 4

Grey Tee 4

5 pieces Delivery: 15 days
#132

Grey Union 4

Grey Union 4

5 pieces Delivery: 15 days
#133

Grey Coupler 4

Grey Coupler 4

5 pieces Delivery: 15 days
#134

Grey Pipe 4 per Running Foot

Grey Pipe 4 per Running Foot

100 pieces Delivery: 15 days
#135

Grey Nipple 4

Grey Nipple 4

5 pieces Delivery: 15 days
#136

Grey MT 4

Grey MT 4

5 pieces Delivery: 15 days
#137

Grey FT 4

Grey FT 4

5 pieces Delivery: 15 days
#138

Grey End Cap 4

Grey End Cap 4

5 pieces Delivery: 15 days
#139

Grey Valve 4

Grey Valve 4

5 pieces Delivery: 15 days
#140

UPVC Solvent Cement Solution

UPVC Solvent Cement Solution

15 pieces Delivery: 15 days
#141

White Cement 1 kg

White Cement 1 kg

50 pieces Delivery: 15 days
#142

Measuring Tape

Measuring Tape

2 pieces Delivery: 15 days
#143

Ceramic Clay Pipe

Ceramic Clay Pipe

10 pieces Delivery: 15 days
#144

Ceramic Clay Elbow

Ceramic Clay Elbow

10 pieces Delivery: 15 days
#145

Drain Sewer Cleaning Work

Drain Sewer Cleaning Work

12 pieces Delivery: 15 days
#146

Sewer Line Cleaning Work using Machine

Sewer Line Cleaning Work using Machine

12 pieces Delivery: 15 days
#147

Well Emptying Pumping Work using Machine

Well Emptying Pumping Work using Machine

5 pieces Delivery: 15 days
#148

Sewer Drainage Lids

Sewer Drainage Lids

15 pieces Delivery: 15 days
#149

Visit Service Charge

Visit Service Charge

500 pieces Delivery: 15 days
Advertisement

Categories 24

Corrigendum Updates

2 Updates
#1

Update

30-Sep-2026
#2

Update

30-Sep-2026

Extended Deadline

08-Oct-2026, 12:30 pm

Opening Date

09-Oct-2026, 12:30 pm

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement