MS Iron Flat bar,HR Coiel,Iron Angle,Wire,GI Pipe,CR Sheet,Welding Rod,Cutting Wheel,Binding Wire
Indian Army
BIKANER, RAJASTHAN
Bid Publish Date
17-Apr-2025, 2:07 pm
Bid End Date
28-Apr-2025, 2:00 pm
EMD
₹53,676
Value
₹26,83,777
Location
Progress
RAQuantity
1790
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) invites bids for AC Supply, Dismantalling, Wall Covering, ITC, Pipe, Cable, Angle Iron, MS Stand, PVC Pipe, Wiring, MCB Box, MCB in KOLKATA, WEST BENGAL. Quantity: 1790. Submission Deadline: 28-04-2025 14: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BIKANER, RAJASTHAN
Bharat Sanchar Nigam Limited Portal(bsnl)
Indian Army
GANJAM, ODISHA
Employees State Insurance Corporation (esic)
KAMRUP, ASSAM
University Of Kashmir
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | AC Supply | Supply of 1.5 TR Inverter type 5 Star rated split Air Conditioner unit as per BEE star rating , (as per BEE Notification dated 19th April 2022 or latest) with remote control unit, filters, rotary type compressor, copper tubes for both indoor and outdoor unit, Refrigerant gas with topping up of refrigerant if required, transportation of all of the above to the various sites and supplying the following up to the length of 3 mtrs etc as required. (30 nos for Telephone Bhawan and 13 nos for Hare Street building) (1) Hot and cold refrigerant piping (2) suitable connecting electrical cable between indoor and outdoor unit. Note 1) The manufacturers / Suppliers shall give a warranty of the air conditioner for 15 months from date of supply or 12 months from date of installation, which is earlier. Thereafter 9 years (108 months) additional warranty on the compressor. | 43 | nos | sdeesdiii | 60 |
| 2 | Dismantalling | Dismantling of existing Split AC unit - indoor and outdoor units along with interconnecting cu pipe and cable, power connection cable etc. and storing at place shown by Exch. in charge etc. as reqd. | 28 | nos | sdeesdiii | 60 |
| 3 | Wall Covering | Covering the opening in wall by metal plate/cement brick in case of brick wall subsequent to removal of old WAC units to avoid any leakage of cool air etc. complete as required. | 11 | nos | sdeesdiii | 60 |
| 4 | ITC | Installation, Testing & Commissioning of the 1.5 TR Split AC unit at a specified location by mounting/fitting Indoor and Outdoor unit at their respective locations, laying and fixing of both liquid and hot gas lines, inter connecting wiring for both indoor and outdoor units up to 3 mtrs. length and interconnecting the indoor unit and outdoor unit with refrigerant line, insulating the refrigerant pipe with expandable polyethylene Foam tubing unit, Leak testing entire system, charging Refrigerant gas in the unit, making power supply connections from the power point etc. complete as required. | 43 | nos | sdeesdiii | 60 |
| 5 | Pipe | Supplying and fixing extra copper pipe line both 1/4 inch for gas line and 5/8 inch for liquid line OR suitable dia to match with the pipeline of the new unit along with suitable size rubber foam/insulation on surface of the wall i/c necessary flare nuts, suitably brazing with the existing pipe clamping, making holes in walls, same etc., as per site requirement. NOTE - The length of refrigerant pipes supplied with each AC units is 3 Mtr. Extra length shall be paid extra for which firm shall quote their unit rates. | 300 | mtrs | sdeesdiii | 60 |
| 6 | Cable | Supplying and laying 4 core 2.5 sq.mm. PVC insulated and PVC sheathed flexible copper cable along with refrigerant pipe or along with existing conduit / cable tray including binding with plastic tags for extending supply from existing industrial socket to indoor unit etc. as required. (Make any ISI mark). NOTE- The length of Copper Cable supplied with each unit is 3 Mtr. Extra length shall be paid extra for which firm shall quote their unit rates. | 300 | mtrs | sdeesdiii | 60 |
| 7 | Angle Iron | Supplying and fixing of iron stand made out of 40mm x 40mm x 5mm thick angle iron for mounting outdoor unit of the above AC as per manufacturer including providing other necessary hardware, painting etc. complete as required. | 480 | kgs | sdeesdiii | 60 |
| 8 | MS Stand | Supplying & fixing of Powder Coated MS frame stand comprising of Two numbers bracket made of heavy duty MS Sheet to accommodate the Condenser (Outdoor) unit for fixing on the wall with suitable diameter and length of Anchor fast bolts and making good the damages etc. as per site requirement. | 16 | nos | sdeesdiii | 60 |
| 9 | PVC Pipe | Supplying and Fixing of 20 mm dia heavy duty PVC pipe with accessories for drain water connection wherever required etc. complete as required. | 210 | mtrs | sdeesdiii | 60 |
| 10 | Wiring | Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC insulated copper conductor, single core cable in surface/ recessed steel conduit as required. a) 4X 2.5 sq mm + 2 X 2.5 sq mm earth wire | 125 | mtr | sdeesdiii | 60 |
| 11 | Wiring | b) 2X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire | 175 | mtrs | sdeesdiii | 60 |
| 12 | MCB Box | Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32 A 240 V C curve DP MCB complete with connections, testing and commissioning etc. as required. | 37 | nos | sdeesdiii | 60 |
| 13 | MCB | Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, C curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. (a) Single Pole | 22 | nos | sdeesdiii | 60 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
24-May-2025, 12:00 pm
End
26-May-2025, 12:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | COMCAT Under PMA | - | 22-04-2025 13:26:50 | Disqualified |
| 2 | COMPETENT ENGINEERS Under PMA | - | 28-04-2025 12:27:36 | Disqualified |
| 3 | GODREJ AND BOYCE MANUFACTURING COMPANY LIMITED Under PMA | - | 28-04-2025 12:25:20 | Disqualified |
| 4 | S B KAMAL & SONS Under PMA | - | 24-04-2025 17:18:07 | Qualified |
| 5 | SCIENTIFIC REFRIGERATION Under PMA | - | 21-04-2025 15:26:51 | Qualified |
| 6 | U.B. TECH Under PMA | - | 28-04-2025 13:57:50 | Disqualified |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | S B KAMAL & SONS(MSE,MII) Under PMA Winner | ₹21,04,172 | Item Categories : AC Supply,Dismantalling,Wall Covering,ITC,Pipe,Cable,Angle Iron,MS Stand,PVC Pipe,Wiring,Wiring,MCB |
| L2 | SCIENTIFIC REFRIGERATION (MSE) Under PMA | ₹22,70,873 | Item Categories : AC Supply,Dismantalling,Wall Covering,ITC,Pipe,Cable,Angle Iron,MS Stand,PVC Pipe,Wiring,Wiring,MCB |
🎉 L1 Winner
S B KAMAL & SONS(MSE,MII) Under PMA
Final Price: ₹21,04,172
Please sign in or create an account to view contract details and download result documents.
Key insights about WEST BENGAL tender market
The eligibility requirements include being a registered entity with the necessary legal status. Bidders must demonstrate experience in HVAC installations, provide references from comparable projects, and hold considerable technical knowledge in air conditioning systems. Compliance with local regulations and any certifications related to HVAC work will enhance eligibility.
Bidders should possess specific certificates that validate their technical capabilities in HVAC installations. This may include ISO certifications, relevant trade licenses, and any local or state-issued certifications pertaining to air conditioning services. It's advisable to review the tender documentation for detailed requirements.
The submission process mandates that all documentation must be submitted electronically via the provided tender portal. Each submission must adhere to outlined formatting rules, including file types and sizes as specified in the tender guidelines. Ensure that all documents are complete and cohesive to avoid disqualification.
The payment terms for successful bidders will typically follow a milestone payment structure, where partial payments are made upon completion of specified project phases. It is crucial for bidders to clarify these terms in their proposals and seek immediate confirmation during the evaluation process.
Micro, Small, and Medium Enterprises (MSEs) stand to gain advantages such as relaxed eligibility criteria, a possible share in the total tender value, and support for local procurement initiatives. These provisions are designed to promote inclusivity within the bidding process and support local economic growth.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS