Progress
The Bhakra Beas Management Board (BBMB) invites bids for multiple sanitary and hardware items to be supplied and installed at Panipat, Haryana. Procured categories include Hydraulically Regulated Door Closers conforming to IS 3564, Copper alloy Taps/Stop Valves conforming to IS 8931, and Bathroom or Toilet Mirrors (V3) with Q4 specification. While the BOQ shows zero items, the tender text establishes an option clause allowing quantity variations up to 25% during contract execution, with delivery timelines tied to the last original order. The procurement is location-specific to Panipat, Haryana (132101), and emphasizes compliance with identified IS standards and quality characteristics. A site-material verification step is required prior to technical bid opening, ensuring on-site conformity with stated specifications.
Hydraulically Regulated Door Closers conforming to IS 3564 with Q3 designation
Copper alloy Taps/Stop Valves conforming to IS 8931 with Q3 designation
Bathroom/Toilet Mirrors categorized as V3 (Q4) with specified frame and mounting details
Mirror dimensions: width/diameter, height, thickness to be supplied as per site requirements
Materials: body components, inlet tubes, flanges, diverter and related components specified
Warranty: duration to be confirmed; post-delivery support and service terms to be provided
Quantity may be increased or decreased by up to 25% during contract
Delivery period calculations commence from last date of original delivery order
Site sample verification required before technical bid opening
BBMB terms allow quantity variation up to 25% and extended delivery within calculated timelines; exact payment milestones to be clarified in bid documents.
Delivery period starts from the last date of the original delivery order; additional time computed as (increase in quantity/original quantity) × original delivery period, minimum 30 days.
Penalties/LD terms to be specified in the contract; ensure compliance with on-site testing and sample verification requirement.
Proven experience in supplying IS-compliant hardware and mirrors
Financial capacity to handle up to 25% quantity variation
Ability to provide IS 3564 and IS 8931 compliant products with necessary certifications
Quantity
170
Category
Hydraulically Regulated Door Closers conforming to IS 3564
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
61
Past Performance
60 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Hydraulically Regulated Door Closers conforming to IS 3564 (Q3) , Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) , Bathroom or Toilet Mirror (V3) (Q4)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Panipat
Delivery Pincodes
132108
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anshu Mishra | 132108,Bhakra Beas Management Board, SEWAH, GT ROAD , PANIPAT | Panipat | Haryana | 132108 | 40 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating similar supply
Financial statements for last 2-3 years
EMD/Security deposit submission proof
Technical bid document and product data sheets
OEM authorization letters (if applicable)
IS standard compliance certificates (IS 3564, IS 8931) and mirror category details
| Category | Specification | Requirement |
|---|---|---|
| Specification | Governing Specification | Conforming to IS 8931 |
| Type | Item | Angle stop valve |
| Type | Dimension | As per table 5 of the governing specification |
| Type | Nominal Size of bore of pipe to which taps and valves are fitted(in mm) | 15 |
| Material | Material of body, body components, nozzle , bonnet and back nuts | Brass rods |
| Material | Material of inlet tubes | Brass tubes |
| Material | Material of flanges | Brass rods |
| Material | Material of diverter and diverter components | NA |
| Material | Material of spindle, glands, washer plate, nuts, screw and pin | Rolled brass rods |
| Material | Material of circlip, wire locks | Phosphor bronze sheet, Phosphor bronze wire, Stainless steel |
| Material | Material of 'O' ring , gasket, and seat washer | Synthetic rubber, Neoprene rubber, Acrylonitrille butadiene rubber (ABR), Synthetic butadiene rubber (SBR) |
| Material | Material of Knob and knob components | Brass rods |
| Generic | Aerating device fitted with tap | Yes, No |
| Generic | Flow straightening device fitted with tap | Yes |
| Warranty | Warranty (in months) | 12 |
Key insights about HARYANA tender market
Bidders should submit GST, PAN, financials, and experience certificates, along with IS 3564 compliant door closers data sheets. The Q3 category requires IS 3564 conformity; sample verification occurs at site before technical bid opening, and quantity variation up to 25% may be exercised.
Submit GST certificate, PAN, 3 years of relevant experience, last 3 years financial statements, EMD proof, OEM authorizations if applicable, IS 8931 conformity certificates, product datasheets, and installation manuals; include supplier warranty terms and service commitments.
Mirrors must meet specified V3 (Q4) classification with appropriate coating, frame and mounting system details; provide mirror dimensions (width/diameter, height, thickness) and frame materials; on-site checks are required prior to technical bid opening.
Delivery period starts after the original delivery order date; additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days; the contractor may have up to 7/9 in extended delivery under option clause.
EMD details are to be specified in the tender documents; bidders must submit the EMD amount or online payment proof as part of bid submission, ensuring compliance with BBMB norms and proof of tender eligibility.
Obtain IS 3564 and IS 8931 certificates from accredited bodies, attach test reports and manufacturer data; ensure all door closers and taps meet the exact Q3 standard and copper alloy specifications; include third-party test results if required by BBMB.
A site visit must occur to verify material samples prior to technical bid opening; bidders should bring product spec sheets, compliance certificates and a demonstration sample if requested; ensure alignment with Panipat installation conditions.