Progress
N/a announces a tender for Main Site Office Cabin, Office Furniture Package, Septic tank, Plumbing work and water tank, Electrical work in DIU, DAMAN & DIU. Quantity: 5. Submission Deadline: 27-08-2026 14: 00: 00. Last date to apply is approaching fast!
Quantity
5
Category
Main Site Office Cabin
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
10
OEM Avg. Turnover
10
Past Performance
40 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Main Site Office Cabin , Office Furniture Package , Septic tank , Plumbing work and water tank , Electrical work
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
20
Delivery Locations
1
Delivery Cities
Diu
Delivery Pincodes
362520
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pravinchandra Vira | 362520,OLD COURT BUILDING, FIRANGIWADA Diu | Diu | The Dadra And Nagar Haveli And Daman And Diu | 362520 | 1 | 20 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Site Office Cabin
CR CORRUGATED DOOR FITTIING 3X6.5 FT WINDOW 3X3 WITH MS GRILL
Office Furniture Package
Office Furniture Package
Septic tank
PORTABLE TOILET BATH CONTAINER and fitting
Plumbing work and water tank
Plumbing work and water tank installation
Electrical work
LED LIGHT FITTING STANDERED BALKET LIGHT AC PROVISION,CONCEALED ELECTRICAL WIRING STANDERD IS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Main Site Office Cabin | CR CORRUGATED DOOR FITTIING 3X6.5 FT WINDOW 3X3 WITH MS GRILL | 1 | pieces | pravinchandra.vira | 20 | |
| 2 | Office Furniture Package | Office Furniture Package | 1 | pieces | pravinchandra.vira | 20 | |
| 3 | Septic tank | PORTABLE TOILET BATH CONTAINER and fitting | 1 | pieces | pravinchandra.vira | 20 | |
| 4 | Plumbing work and water tank | Plumbing work and water tank installation | 1 | pieces | pravinchandra.vira | 20 | |
| 5 | Electrical work | LED LIGHT FITTING STANDERED BALKET LIGHT AC PROVISION,CONCEALED ELECTRICAL WIRING STANDERD IS | 1 | pieces | pravinchandra.vira | 20 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer