Ai Airport Services Limited Bearings & Gear Components Tender South Goa Goa - 1-Year Warranty, 25% Quantity Flex 2026

Bid Publish Date

03-Aug-2026, 5:40 pm

Bid End Date

27-Aug-2026, 6:00 pm

Generate Docs

Progress

Issue03-Aug-2026, 5:40 pm
Corrigendum14-Aug-2026
AwardPending

Key Highlights

  • Critical brand/OEM expectations: OEM warranty certificates required at delivery; established Indian service network for after-sales support.
  • Technical standards/certifications: Explicit standards not listed; bidders must comply with IS/ISO-related ATC as per tender documentation.
  • Special clauses: 25% quantity variation right for order and extended periods; delivery time adjusts proportionally with minimum 30 days.
  • Eligibility criteria: No liquidation or bankruptcy; mandatory undertaking; valid GST/PAN and financial statements typically required.

Tender Overview

Ai Airport Services Limited invites bids for the supply of bearings, gears, seals and related hardware items (13 line items in BOQ scope) to service airport operations in South Goa, Goa. The procurement includes drive components such as PLANETAIRE gear items, bearings, rings, seals, star gears and related assemblies. Estimated value not disclosed; however, the contract permits a 25% quantity variation at the time of order and during the contract currency. The delivery schedule references an extended delivery window aligned with the option clause, with minimum 30 days added when quantities increase. The emphasis is on reliable OEM/service support and post-sale maintenance capability in India.

Technical Specifications & Requirements

  • Scope: Supply of Goods only (no services) as per purchaser’s bid document.
  • Warranty: 1 year from final acceptance or after installation/commissioning; OEM warranty certificates required at delivery.
  • After-sales: Must have established Installation, Commissioning, Training, Troubleshooting and Maintenance service network in India; service centre locations to be uploaded with bid.
  • Documentation: Upload certificates and documents sought in bid ATC/Corrigendum; non-submission may lead to rejection.
  • Option clause: Purchaser may increase quantity up to 25% of contracted quantity; delivery period recalculated with minimum 30 days.
  • Scope of supply price: All costs included in bid price; only goods supplied under the contract.
  • Term compliance: Adherence to any additional ATC terms linked to the tender.

Terms & Eligibility

  • Financial standing: Bidder must not be under liquidation or bankruptcy; must upload an undertaking.
  • Warranty/after-sales: 1-year warranty; OEM certificates submitted at delivery; service network details uploaded.
  • Delivery/payment: Delivery terms aligned with option clause; payment terms as per ATC—details to be confirmed in the bid document.
  • Certificates: All required certificates and documents listed in the Bid document, ATC, and Corrigendum must be uploaded; otherwise bid may be rejected.

Key Specifications

  • Product category: bearings, gears (PLANETAIRE, GROMMET, BUSH, SHIM), sealing rings, rings, springs, lugs and related components

  • Quantities/line items: 13 items in BOQ; specific quantities not disclosed

  • Financials: No estimated value disclosed; EMD amount not provided

  • Experience: Prior supply of aerospace/airport-grade bearing and gear components preferred

  • Quality: OEM warranties; installation and commissioning support; service-centre network in India

Terms & Conditions

  • Option to increase order quantity by up to 25% during contract and execution period

  • Warranty period fixed at 1 year from final acceptance or post-installation

  • Service network in India required; OEM certificates due at delivery

  • Bid documents must include all ATC/corrigendum certificates; non-compliance risks rejection

Important Clauses

Payment Terms

Payment terms to be as per ATC; bid must include all costs; no additional charges outside bid price

Delivery Schedule

Delivery period extends from last date of original delivery order; extension if quantity increases with minimum 30 days

Penalties/Liquidated Damages

Penalties, if any, to be specified in ATC; ensure compliance with delivery and warranty terms

Bidder Eligibility

  • No liquidation or bankruptcy; provide undertaking

  • Demonstrated capability to supply OEM bearing/gear components in India

  • Valid GST registration, PAN, and financial solvency documentation

Authority & Contact

Office Name

Aiatsl Hq Terminal 2 Igi Airport N Delhi

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

27

Category

ROULEMENT,32011 X 55 X 90 X 23

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

ROULEMENT,32011 X 55 X 90 X 23 , PIVOT,PORTE,B , PLANETAIRE, Z-20 , BAGUE,PLANETAIRE , GROMMENT , BAGUE,CENTRAGE, ESSIEU , BEARING , ELASTIC RING 95 X 2 , SEALING RING , CROISILLON , ASSY FIXED , STAR GEAR BUSH Or SHIM , RESSORT ,LAMES

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

South Goa

Delivery Pincodes

403801

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pramod Vitthal Pandit403801,AI Airport services Limited, AAI GSD Workshop Building, Behind AAI Cargo Complex, Goa International Airport, Dabolim, Vasco - 403801South GoaGoa403801230-

Authority Records

MINISTRY OF CIVIL AVIATIONAI AIRPORT SERVICES LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9702557.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

ROULEMENT,32011 X 55 X 90 X 23

PN- 5300032-041, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#2

PIVOT,PORTE,B

PN- 5300032-036, Make-TLD, Model-ETT - JET 16

1 each Delivery: 30 days
#3

PLANETAIRE, Z-20

PN- 5300032-034, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#4

BAGUE,PLANETAIRE

PN- 5300032-033, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#5

GROMMENT

PN- 1047570-009, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#6

BAGUE,CENTRAGE, ESSIEU

PN- 5300032-006, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#7

BEARING

PN- 5333403-106, Make-TLD, Model-ETT - JET 16

4 each Delivery: 30 days
#8

ELASTIC RING 95 X 2

PN- 5333403-107, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#9

SEALING RING

PN- 5333403-108, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days
#10

CROISILLON

PN- 5300032-035, Make-TLD, Model-ETT - JET 16

1 each Delivery: 30 days
#11

ASSY FIXED

PN- 1047570-077, Make-TLD, Model-ETT - JET 16

1 each Delivery: 30 days
#12

STAR GEAR BUSH Or SHIM

NOT AVAILABLE, Make-TLD, Model-ETT - JET 16

4 each Delivery: 30 days
#13

RESSORT ,LAMES

PN- 5400060-001, Make-TLD, Model-ETT - JET 16

2 each Delivery: 30 days

Categories 10

Corrigendum Updates

1 Update
#1

Update

14-Aug-2026

Extended Deadline

20-Aug-2026, 12:30 pm

Opening Date

20-Aug-2026, 1:00 pm

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for prior supply of bearings, gears or related components

4

Financial statements or solvency documentation

5

EMD/Security deposit documents (as per ATC)

6

OEM authorization/certificates confirming ability to supply OEM parts

7

Technical bid documents and certificates requested in ATC/Corrigendum

8

Installation/maintenance service network details and center locations

Frequently Asked Questions

Key insights about GOA tender market

How to bid for Ai Airport Services Limited bearings tender in South Goa Goa 2026

Bidders must submit GST, PAN, experience certificates, financial statements, EMD, OEM authorizations, and all ATC/corrigendum certificates. The scope covers supply of bearings, gears, rings, seals, and related assemblies with a 1-year warranty and a 25% quantity variation option. Ensure installation/service-network details are uploaded.

What documents are required for airport equipment supply tender in Goa

Required documents include GST registration, PAN, company financials, experience certificates for similar supply, OEM authorization, post-sale service details, and OEM warranty certificates. All certificates must align with ATC and Corrigendum; failure to provide may lead to rejection.

What are the technical specs for bearings and gears tender in South Goa

The tender lists bearings, PLANETAIRE gears, seals, rings, and related components; no explicit performance metrics provided. Bidders should rely on OEM specifications, ensure warranty of 1 year, and confirm compatibility with airport-use assemblies through OEM documentation.

When is the delivery window for 25% quantity variation in Goa tender

Delivery terms permit a 25% quantity increase at contract time and during the currency. The extended delivery period is recalculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days added. Final dates per ATC.

What are the warranty requirements for airport equipment supply contract Goa

Warranty is 1 year from final acceptance or after installation/completion. OEM warranty certificates must be provided at delivery; supplier must guarantee rectification of defects during the warranty period and have a local service network in India for support.

How to verify eligibility criteria for bearings and gears bid in Goa

Confirm non-liquidation status with an undertaking, provide financial solvency proof, and demonstrate prior experience in supplying bearings/gears. Ensure GST/PAN, OEM authorizations, and installation/maintenance capabilities are documented as per ATC.

What is the scope of supply for Ai Airport Services tender in Goa

Scope covers supply of goods only (no services) for bearings, gears, rings, seals, and related components; price must include all cost components. Delivery to consignee location with associated installation/training handled under separate terms if included.

What happens if documentation is incomplete for the Goa tender

Incomplete submissions risk rejection. Ensure submission of all required certificates, OEM documentation, service network details, and ATC/Corrigendum certificates. Double-check for any missing documents against the official bid document before submission.