Progress
RAIndian Air Force announces a tender for Multi Adjustable Bench (V2) (Q3), Shoulders Press Machine (Q4), Chest Press (Version 2) (Q3), Smith Machine (Version 2) (Q3), Leg Curl Machine (Version 2) (Q3), Lat Pull Down (Version 2) (Q3), Pectoral Fly / Rear Deltoid (Version 2) (Q3), Elliptical Cross Trainer (Q3), 45 degree Leg Press or Hack Squat Machine (Q3) in CACHAR, ASSAM. Quantity: 12. Submission Deadline: 23-07-2026 09: 00: 00. Last date to apply is approaching fast!
Start
08-Sep-2026, 1:00 pm
End
09-Sep-2026, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
12
Category
Smith Machine (Version 2)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
7
OEM Avg. Turnover
25
Past Performance
80 %
Warranty Period
3 years
Experience Required
3 Year (s)
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Multi Adjustable Bench (V2) (Q3) , Shoulders Press Machine (Q4) , Chest Press (Version 2) (Q3) , Smith Machine (Version 2) (Q3) , Leg Curl Machine (Version 2) (Q3) , Lat Pull Down (Version 2) (Q3) , Pectoral Fly / Rear Deltoid (Version 2) (Q3) , Elliptical Cross Trainer (Q3) , 45 degree Leg Press or Hack Squat Machine (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
38
Max Delivery Days
58
Delivery Locations
1
Delivery Cities
CACHAR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | CACHAR | CACHAR | - | - | 2 | 58 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Frame Description | Material of Frame | Colled Rolled Mild Steel |
| Frame Description | Thickness | 15 gauge |
| Performance Parameters | Provision of Dual rear transport wheels | Yes |
| Performance Parameters | Provision of ABS rubber feet for floor protection | Yes |
| Warranty | Warranty on Frame (in years) | 1, 2, 3, 4, 5 Or higher |