Bid Publish Date
13-Mar-2026, 10:09 am
Bid End Date
04-Apr-2026, 2:00 pm
Location
Progress
RAQuantity
122
Bid Type
Two Packet Bid
Organization: Armoured Vehicles Nigam Limited (AVNL), a unit under the Department of Defence Production, invites bids for the Spring Hanger Bracket (Rear Suspension). The procurement scope is Only supply of Goods with delivery to the Chief General Manager, Vehicle Factory Jabalpur, MADHYA PRADESH 482009. The tender includes a quantity option clause allowing up to 50% fluctuation of bid quantity during contract and extended periods. Bidders must upload a Non-Disclosure Declaration and adhere to GST invoicing via GeM with GST portal confirmations. A Material Test Certificate must accompany the supply, and post-receipt inspection will be conducted by a CGM/VFJ representative. The tender emphasizes supplier responsibility for compliance with terms and delivery timelines anchored to the last delivery order date.
Product: Spring Hanger Bracket (Rear Suspension) - Drg. No: 620-02-1210-1/D
Scope: Only supply of Goods; installation/commissioning if covered in scope of supply
Delivery: To Chief General Manager, Vehicle Factory Jabalpur, Madhya Pradesh 482009
Inspection: Post Receipt Inspection at consignee site (CGM/VFJ); pre-dispatch inspection not applicable unless ATC specifies
Certificates: Material Test Certificate to be sent with supply; mandatory for acceptance
GST: Invoicing and GST payment to follow GeM portal requirements; GST amount to be reimbursed as actuals or lower applicable rate
Option Clause: Up to 50% quantity variation during contract; delivery period adjusts with formula; minimum 30 days
Documentation: Upload NDA; non-disclosure risks contract enforcement
Delivery and inspection: post-receipt inspection by CGM/VFJ; pre-dispatch inspection only if ATC specifies
GST and invoicing: GST payable per actuals; upload GST invoice and payment screenshots on GeM
Option clause: purchaser may increase/decrease quantity up to 50% with related delivery extension
GST invoicing via GeM; payment reimbursements linked to actual GST or applicable lower rate; GeM portal GST confirmation required
Delivery to AVNL Jabalpur; delivery period linked to last delivery order date; extended time for option quantity subject to minimum 30 days
Not specified in provided terms; ensure to review ATC for LD or penalties if applicable
Experience in supplying mechanical brackets or similar rear suspension components
Demonstrated ability to meet post-receipt inspection requirements
Compliance with GeM GST invoicing and NDA submission
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Spring Hanger Bracket (Rear Suspension) , Drg. No: 620-02- 1210-1/D
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates (relevant to supply of goods like brackets or similar metal components)
Financial statements (as required by AVNL Terms)
EMD documents (if applicable per GeM ATC)
Technical bid documents
OEM authorizations (if applicable)
Material Test Certificate to accompany the supply
Non-Disclosure Declaration on Bidder letterhead
Extended Deadline
04-Apr-2026, 2:00 pm
Opening Date
04-Apr-2026, 2:30 pm
Start
14-May-2026, 1:00 pm
End
15-May-2026, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M K INDUSTRIES Under PMA | Make : OEM Model : 620-02-1210-1/D Title : Spring Hanger Bracket (Rear Suspension) , Drg. No: 620-02-1210-1/D | 25-03-2026 15:59:34 | |
| 2 | M P METAL & STEEL INDUSTRIES Under PMA | Make : OEM Model : spring hanger bracket Title : Spring Hanger Bracket (Rear Suspension) , Drg. No: 620-02-1210-1/D | 28-03-2026 12:14:25 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | M K INDUSTRIES(MSE,MII) Under PMA Winner | ₹4,63,093 | Item Categories : Spring Hanger Bracket (Rear Suspension) , Drg. No: 620-02-1210-1/D |
| L2 | M P METAL & STEEL INDUSTRIES (MSE,MII) Under PMA | ₹4,63,600 | Item Categories : Spring Hanger Bracket (Rear Suspension) , Drg. No: 620-02-1210-1/D |
🎉 L1 Winner
M K INDUSTRIES(MSE,MII) Under PMA
Final Price: ₹4,63,093
Key insights about MADHYA PRADESH tender market
Bidders must submit GST registration, PAN, experience certificates, financials, NDA, and Material Test Certificate with the bid. Ensure GeM GST invoice upload and portal payment confirmation. The scope is supply of goods with post-receipt inspection by CGM/VFJ; NDA is mandatory for bid submission.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, NDA on bidder letterhead, Material Test Certificate, technical bid documents, and OEM authorizations if applicable. Ensure all certificates are uploaded with the bid.
Delivery is to the Chief General Manager, Vehicle Factory Jabalpur, Madhya Pradesh. The delivery period ties to the last date of the original delivery order with a minimum 30 days, and quantity may increase up to 50% during contract.
Post Receipt Inspection at the consignee site by CGM/VFJ is mandatory. Pre-dispatch inspection is Not Applicable unless ATC specifies otherwise. Material Test Certificate must accompany the supply.
GST is payable as actuals or applicable rates, whichever is lower. Bidders must upload scanned GST invoice and GST portal payment confirmation on GeM during invoicing.
Purchaser may increase/decrease quantity up to 50% of bid quantity; extended delivery period applies, calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
Inspection is conducted by a representative of CGM/VFJ at the consignee site after receipt, per terms; pre-dispatch inspection only if ATC indicates otherwise.
Failure to upload required certificates (including Material Test Certificate) can lead to bid rejection; ensure all mandatory documents and NDA are uploaded with the bid and ATC compliance.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS