Progress
RAThe Indian Army, Department Of Military Affairs, seeks procurement of sanitary fittings including copper alloy taps/stop valves conforming to IS 8931 (Q3), health faucet (Q3), vitreous china WC per IS 2556 (Q3), wash basins per IS 2556 Part 4 (Q3), and plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to IS 9763 (Q3), for delivery in West Delhi, Delhi. The tender includes an option clause allowing up to 25% quantity variation at contracted rates and a variable delivery timeline linked to the last delivery order date, with minimum additional time of 30 days. Bidders must comply with certificate uploads and supplier documentation; samples may be required post-award for approval, with potential modifications before bulk supply. Related terms emphasize adherence to IS standards and post-sample approval timelines. No BOQ quantity is listed in the available data. The opportunity requires bidders to prepare vendor-code related documentation and submit standard corporate credentials to participate in the procurement process.
IS 8931 (Copper alloy taps/stop valves) Q3
IS 2556 (Washbasins, vitreous china) Q3; Part 4 for wash basins
IS 9763 (Plastic bib taps, pillar taps, angle/stop valves for hot & cold water) Q3
Health faucet conforming to Q3
Advance sample submission and approval requirements
Quantity up to 25% increase/decrease at contracted rates
Advance sample submission within 5 days; approval within 7 days
Bidder must submit PAN, GSTIN, cancelled cheque, EFT mandate
GST reimbursement will follow actuals or applicable lower rate; payment terms not explicitly stated beyond standard government procurement practices
Delivery period starts from last date of original delivery order; option clause may extend delivery time with minimum 30 days
Not explicitly detailed in provided text; contract may include LD for delay per standard terms
Must meet IS standard conformity for sanitary fittings
Submit PAN, GSTIN, and EFT mandate documents
Upload required certificates and ensure sample approval process
Start
16-Oct-2026, 4:00 pm
End
19-Oct-2026, 2:00 pm
Duration: 70 hours
Reverse Auction Document
🔴 RA is live! Log in to the portal to participate.
Quantity
1235
Category
PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
8
OEM Avg. Turnover
65
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) , Health Faucet (Q3) , (Vitreous China) - Washdown Water Closets as per IS 2556 (Q3) , Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3) , PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3)
Advisory Bank
State Bank of India
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
South West delhi
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South West delhi | South West delhi | - | - | 90 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate document certified by bank
Any certificates uploaded as per ATC/Corrigendum
Technical bid documents and OEM authorizations (if applicable)
Key insights about DELHI tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate alongside technical bids; ensure IS 8931 (Q3), IS 2556 (Q3), and IS 9763 (Q3) compliance. Samples may be required within 5 days of award; approval within 7 days before bulk supply. Follow option clause for quantity adjustments up to 25%.