TenderDekho Logo
Closed GEM

Invitation to Bid - Operation and Maintenance of 1.5 TR, 2 TR, 3 TR, capacity Split Air Conditioner,,Supply and chargin in Aurangabad, MAHARASHTRA

Bid Publish Date

27-May-2025, 11:29 am

Bid End Date

17-Jun-2025, 12:00 pm

EMD

₹80,256

Value

₹26,75,199

Progress

Issue27-May-2025, 11:29 am
Technical17-06-2025 10:41:57
Financial
Award08-Aug-2025, 2:11 am
Explore all 5 tabs to view complete tender details

Quantity

651

Bid Type

Two Packet Bid

Categories 27

Ans, finance, hr, engineering, tech, ops, commercial, general Store, it announces a tender for Operation and Maintenance of 1. 5 TR, 2 TR, 3 TR, capacity Split Air Conditioner, , Supply and charging of R 22 refrigerant, Supply and charging of R 410 A refrigerant, Supply and charging of R 32 refrigerant, Supply of rotary compressor for 1. 5 TR- R22 Split AC unit, Supply of rotary compressor for 1. 5 TR- R32 Split AC unit, Supply of copper condensor coil suitable for 1. 5 TR split AC, Supply of copper condensor coil suitable for 2. 0 TR split AC, Repairing of Indoor Outdoor PCB Card suitable for 1. 5 TR 2. 0 TR, Supply of 100 GPD RO membrane for RO water system, Supply of 5 micron, 20 inch, pre filter for RO water system, Supply of 5 micron, 10 inch, pre filter for RO water system, Supply of booster RO pump, Supply of auto shutoff water level sensor for RO water system, Supply of CTO filter size 10 inch for RO water purifier system, Supply of CTO filter size 20 inch for RO water purifier, Supply of 24 V DC SMPS power supply adapter, Supply of compressor suitable for 40 80 litres, Supply of compressor suitable for 60 120 litres in Aurangabad, MAHARASHTRA. Quantity: 651. Submission Deadline: 17-06-2025 12: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Operation and Maintenance of 1.5 TR, 2 TR, 3 TR, capacity Split Air Conditioner, , Supply and charging of R 22 refrigerant , Supply and charging of R 410 A refrigerant , Supply and charging of R 32 refrigerant , Supply of rotary compressor for 1.5 TR- R22 Split AC unit , Supply of rotary compressor for 1.5 TR- R32 Split AC unit , Supply of copper condensor coil suitable for 1.5 TR split AC , Supply of copper condensor coil suitable for 2.0 TR split AC , Repairing of Indoor Outdoor PCB Card suitable for 1.5 TR 2.0 TR , Supply of 100 GPD RO membrane for RO water system , Supply of 5 micron , 20 inch , pre filter for RO water system , Supply of 5 micron , 10 inch , pre filter for RO water system , Supply of booster RO pump , Supply of auto shutoff water level sensor for RO water system , Supply of CTO filter size 10 inch for RO water purifier system , Supply of CTO filter size 20 inch for RO water purifier , Supply of 24 V DC SMPS power supply adapter , Supply of compressor suitable for 40 80 litres , Supply of compressor suitable for 60 120 litres

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7892217.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

Operation and Maintenance of 1.5 TR, 2 TR, 3 TR, capacity Split Air Conditioner,

Operation and Maintenance of 1.5 TR, 2 TR, 3 TR, capacity Split Air Conditioner, High wall AC, Cassett type AC, Tower AC units operating on 1 or 3 phase, water coolers, water purifiers installed at various locations by deployment of manpower mentioned in special condition.

24 month Delivery: 730 days
#2

Supply and charging of R 22 refrigerant

Supply and charging of R 22 refrigerant for various capacity AC units installed at various locations.

25 kg Delivery: 730 days
#3

Supply and charging of R 410 A refrigerant

Supply and charging of R 410 A refrigerant for various capacity AC units installed at various locations.

50 kg Delivery: 730 days
#4

Supply and charging of R 32 refrigerant

Supply and charging of R 32 refrigerant for various capacity AC units installed at various locations.

150 kg Delivery: 730 days
#5

Supply of rotary compressor for 1.5 TR- R22 Split AC unit

Supply of rotary compressor for 1.5 TR- R22 Split AC unit , 1 Phase, 230 V, AC supply as per site requirement.

2 each Delivery: 730 days
#6

Supply of rotary compressor for 1.5 TR- R32 Split AC unit

Supply of rotary compressor for 1.5 TR- R32 Split AC unit , 1 Phase, 230 V, AC supply as per site requirement.

15 each Delivery: 730 days
#7

Supply of copper condensor coil suitable for 1.5 TR split AC

Supply of copper condensor coil suitable for 1.5 TR split AC of various makes Blue Star Hitachi Carrier Voltas as per site requirement

15 each Delivery: 730 days
#8

Supply of copper condensor coil suitable for 2.0 TR split AC

Supply of copper condensor coil suitable for 2.0 TR split AC of makes Blue Star Hitachi Carrier Voltas as per site requirement

2 each Delivery: 730 days
#9

Repairing of Indoor Outdoor PCB Card suitable for 1.5 TR 2.0 TR

Repairing of Indoor Outdoor PCB Card suitable for 1.5 TR 2.0 TR Split AC of various makes Blue star Hitachi Carrier Voltas as per site requirement.

15 job Delivery: 730 days
#10

Supply of 100 GPD RO membrane for RO water system

Supply of 100 GPD RO membrane for RO water system of water cooler as required.

50 each Delivery: 730 days
#11

Supply of 5 micron , 20 inch , pre filter for RO water system

Supply of 5 micron , 20 inch , pre filter for RO water system of water cooler as required.

100 each Delivery: 730 days
#12

Supply of 5 micron , 10 inch , pre filter for RO water system

Supply of 5 micron , 10 inch , pre filter for RO water system of water cooler as required.

100 each Delivery: 730 days
#13

Supply of booster RO pump

Supply of booster RO pump- 100 GPD , operating on 24 V DC as required.

25 each Delivery: 730 days
#14

Supply of auto shutoff water level sensor for RO water system

Supply of auto shutoff water level sensor for RO water system of water cooler installed at Aurangabad Airport as required.

15 each Delivery: 730 days
#15

Supply of CTO filter size 10 inch for RO water purifier system

Supply of CTO filter size 10 inch for RO water purifier system as per site requirement.

15 each Delivery: 730 days
#16

Supply of CTO filter size 20 inch for RO water purifier

Supply of CTO filter size 20 inch for RO water purifier system as per site requirement.

15 each Delivery: 730 days
#17

Supply of 24 V DC SMPS power supply adapter

Supply of 24 V DC SMPS power supply adapter with all accessories including connecting terminals for RO water purifier system as per site requirement.

20 each Delivery: 730 days
#18

Supply of compressor suitable for 40 80 litres

Supply of compressor suitable for 40 80 litres voltas make water cooler as per site requirement.

8 each Delivery: 730 days
#19

Supply of compressor suitable for 60 120 litres

Supply of compressor suitable for 60 120 litres voltas make water cooler as per site requirement.

5 each Delivery: 730 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
M K ENTERPRISES   Under PMA
-17-06-2025 10:41:57
2
M/S I.B.ENTERPRISES   Under PMA
-16-06-2025 12:15:06
3
OPAL HVAC SERVICES   Under PMA
-16-06-2025 17:26:25
4
R K Engineering   Under PMA
-12-06-2025 17:38:38

Financial Results

Rank Seller Price Item
L1
OPAL HVAC SERVICES(MSE,MII)( MSE Social Category:SC )    Under PMA
Item Categories : Operation and Maintenance of 1.5 TR, 2 TR, 3 TR, capacity Split Air Conditioner,,Supply and chargin
L2
M K ENTERPRISES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Operation and Maintenance of 1.5 TR, 2 TR, 3 TR, capacity Split Air Conditioner,,Supply and chargin

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

What are the eligibility requirements for this tender?

The eligibility requirements include being a registered entity with a valid GST registration, demonstrating past experience in maintaining air conditioning systems, and having the capacity to supply the required technical components listed in the tender. Vendors must also ensure the availability of skilled personnel and tools needed for installation and maintenance.

What certifications are required to participate in this tender?

To qualify for this tender, bidders must possess relevant certifications such as GST registration and any applicable local business licenses. Additionally, certifications demonstrating expertise in HVAC systems may strengthen proposals and improve the chances of selection.

What is the registration process for submitting a bid?

Interested bidders must register on the designated procurement platform used by Airports Authority of India to submit their bids. This process typically involves creating a vendor profile, providing necessary documentation, and ensuring compliance with all technical and financial prerequisites outlined in the tender.

What formats are accepted for document submission?

Bidders must submit their documentation in specified formats as outlined in the tender documents. Commonly accepted formats include PDF, DOC, and images for technical schematics, ensuring that all documents are clear and properly formatted to meet submission standards.

What are the performance security requirements associated with this tender?

Bidders are generally required to provide a performance security deposit as a part of the bid submission. The details on the amount and format of the security will be specified in the tender instructions, ensuring the successful bidder meets the contractual obligations throughout the term of the contract.

How will the evaluation and selection process be conducted?

The evaluation process will involve a comprehensive review of submitted bids against established criteria focusing on technical ability, relevant experience, and financial stability. AAI will ensure a transparent selection process, with all parties informed of the outcomes and the rationale behind selection decisions.