SUPPLY- CLAMPS AND CONNECTORS - 765KV, 3150A, TEE CONNECTOR SUITABLE FOR AL TUBE 4.5 INCH IPS TO QU
Bharat Heavy Electricals Limited (bhel)
Bid Publish Date
09-Oct-2025, 10:56 am
Bid End Date
27-Oct-2025, 11:00 am
EMD
₹12,000
Location
Progress
Quantity
552
Category
Shifting of all new material from store to site
Bid Type
Two Packet Bid
A tender has been published for Uttar Pradesh Power Corporation Limited (uppcl) Opening cutting existing main bus bar, Dismantling of existing jumpers from main bus bar, Dismantling of existing jumpers, Dismantling of old or damaged main busbar, Fixing of twin moose suspension, Stringing and proper sagging of conductor, Re connecting of U shape R Y and B phase, Reconnecting all new jumpers twin panther conductor, Reconnecting of jumpers, Shifting of all new material from store to site, Bolted type Tension fitting for Twin Moose conductor, Bolted type Tension fitting, Suspension fitting for Twin Moose conductor, Bus or Line Isolator Bimetallic clamp, Bimetallic CT clamp suitable for Twin Panther conductor, Breaker clamp suitable for Twin Panther conductor, bolted type PG clamp made of aluminum alloy, bolted type PG clamp made of aluminum alloy LM6, Bolt spacing, Spacer for Twin Moose, PT clamp, Bolts spacing, Spacer, Bolts spacing, Spacer for Twin Panther in AZAMGARH, UTTAR PRADESH. Quantity: 552 by. Submission Deadline: 27-10-2025 11: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
Konkan Railway Corporation Limited
SOUTH GOA, GOA
Konkan Railway Corporation Limited
SOUTH GOA, GOA
Konkan Railway Corporation Limited
SOUTH GOA, GOA
Dedicated Freight Corridor Corporation Of India Limited
BULANDSHAHR, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Opening cutting existing main bus bar | Opening cutting of U shape R Y B phases of 132 KV existing Main bus bar made of moose conductor between bus section below gantries step by step during bus-bar replacement work including dismantling of all types of associated clamp & fittings. | 15 | job | se@azamgarh123 | 180 |
| 2 | Dismantling of existing jumpers from main bus bar | Dismantling of following existing jumpers from main bus bar of 3 Nos Transformer and 04 Nos bays from old 132 KV mainbus to BSI by opening of all associated clamp step by step during bus bar replacement work. | 21 | job | se@azamgarh123 | 180 |
| 3 | Dismantling of existing jumpers | Dismantling of following existing jumpers by opening of all associated clamp step by step during bus bar replacement work. From BSI to CB - 12 Nos From CB to CT - 21 Nos From LI to CT - 21 Nos | 54 | job | se@azamgarh123 | 180 |
| 4 | Dismantling of old or damaged main busbar | Dismantling of 132 KV old damaged main busbar sections R Y&B of moose conductor and lowering down of conductor from sub station gantry complete dismantling work including dismantling of all associated tension clamp fittings & Disc Insulators. | 9 | job | se@azamgarh123 | 180 |
| 5 | Fixing of twin moose suspension | Fixing of twin moose suspension fitting under bus bar section of main bus bar below the gantries with suitable hardware such as hoisting of disc insulators etc. to complete the work in all respect satisfactorily. | 3 | job | se@azamgarh123 | 180 |
| 6 | Stringing and proper sagging of conductor | Stringing and proper sagging of new 132 KV Main bus section R Y & B by twin moose conductor the work including fittings of tension clamps hoisting of 120 KN disc tension fitting spacers PG- clamps etc and cutting of conductor as required. | 9 | job | se@azamgarh123 | 180 |
| 7 | Re connecting of U shape R Y and B phase | Re connecting of U shape R Y & B phase of 132 KV Main bus of twin moose conductor between bus section below gantries step by step during bus bar replacement work including jointing of moose conductor below the gantries | 15 | job | se@azamgarh123 | 180 |
| 8 | Reconnecting all new jumpers twin panther conductor | Reconnecting all new jumpers twin panther conductor from main bus bar of 3 Nos Transformer and 04 Nos bays from old 132 KV Main bus to BSI by connectiong all associated clamp step by step during bus-bar replacement. | 21 | job | se@azamgarh123 | 180 |
| 9 | Reconnecting of jumpers | Reconnecting of following jumpers by connectiong all associated clamp step by step during bus bar replacment work. From BSI to CB by ACSR Twin panther conductor - 12 Nos. From CB to CT by ACSR Twin panther conductor- 21 Nos. From LSI to CT by ACSR Twin panther conductor - 21 Nos. | 54 | job | se@azamgarh123 | 180 |
| 10 | Shifting of all new material from store to site | Shifting of all new material from store to site and shifting all the dismantled old material from site to store or available place | 1 | job | se@azamgarh123 | 180 |
| 11 | Bolted type Tension fitting for Twin Moose conductor | Bolted type Tension fitting for Twin Moose conductor without turn buckle for 132 KV Main Bus suitable for each disc stringing 10 Nos 120 KN disc insulators with hardware fitting D shackle D socket Ball hook. York plate D clip tension clamp etc. as per technical specification. | 12 | no | se@azamgarh123 | 180 |
| 12 | Bolted type Tension fitting | Bolted type Tension fitting for Twin Moose conductor with turn buckle for 132 KV Main BUS suitable for each disc stringing 10 Nos 120 KN disc insulators with hardware fitting D shackle D socket Ball hook. York plate D clip tension clamp etc. as per technical specification. | 12 | no | se@azamgarh123 | 180 |
| 13 | Suspension fitting for Twin Moose conductor | Suspension fitting for Twin Moose conductor with yoke plate complete assembly as per technical specification. | 3 | no | se@azamgarh123 | 180 |
| 14 | Bus or Line Isolator Bimetallic clamp | 132 KV Bus Line Isolator Bimetallic clamp for one side connecting of the Twin panther conductor and another side a plate with 04 Nos. 12mm dia hole as per technical specification. | 70 | no | se@azamgarh123 | 180 |
| 15 | Bimetallic CT clamp suitable for Twin Panther conductor | Bimetallic 132 KV CT clamp suitable for Twin Panther conductor with necessary nuts bolts & washer as per technical specification. | 30 | no | se@azamgarh123 | 180 |
| 16 | Breaker clamp suitable for Twin Panther conductor | 132 KV Breaker clamp suitable for Twin Panther conductor with nuts bolts and washers as per technical specification. | 30 | no | se@azamgarh123 | 180 |
| 17 | bolted type PG clamp made of aluminum alloy | 4 bolted type PG clamp made of aluminum alloy LM-6 with spring washer along with GI bolt & nuts suitable for Moose to panther as per technical specification. | 30 | no | se@azamgarh123 | 180 |
| 18 | bolted type PG clamp made of aluminum alloy LM6 | 4 bolted type PG clamp made of aluminum alloy LM-6 with spring washer along with GI bolt & nuts suitable for Moose to Moose as per technical specification. | 30 | no | se@azamgarh123 | 180 |
| 19 | bolted type PG clamp made of aluminum alloy | 3 bolted type PG clamp made of aluminum alloy LM-6 with spring washer along with GI bolt & nuts suitable for panther to Panther as per technical specification. | 20 | no | se@azamgarh123 | 180 |
| 20 | Bolt spacing, Spacer for Twin Moose | 02 Bolt 250 mm spacing Spacer for Twin Moose conductor as per technical specification. | 30 | no | se@azamgarh123 | 180 |
| 21 | PT clamp | 132 KV PT clamp suitable for single Moose conductor as per technical specification. | 3 | no | se@azamgarh123 | 180 |
| 22 | Bolts spacing, Spacer | 02 Bolts 100 mm spacing Spacer for Twin Panther conductor as per technical specification. | 30 | no | se@azamgarh123 | 180 |
| 23 | Bolts spacing, Spacer for Twin Panther | 01 Bolts 60 mm spacing Spacer for Twin Panther conductor as per technical specification. | 50 | no | se@azamgarh123 | 180 |
Discover companies most likely to bid on this tender
Please sign in or create an account to view contract details and download result documents.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS