Organization: Gujarat State Electricity Corporation Limited (GSECL), Vadodara for the procurement of a TECHO-GENERATOR for EDDY CURRENT CLUTCH DRIVE suitable. Delivery location is Surat, Gujarat. The tender references Schedule-B and a Buyer added ATC. The terms allow a 25% quantity increase/decrease at contract award and during currency, at contracted rates, with delivery period adjustments. No BOQ items are listed. The document emphasizes final ATC for technical and supply compliance. This procurement centers on specialized generator equipment compatible with eddy current clutch mechanisms, targeting electrical generation or ancillary drive systems. Unique aspect: ATC documents and option-clause delivery scheduling influence price and lead times.
Scope & Context: Limited specification visibility; emphasis on adherence to Buyer ATC and Schedule-B while maintaining delivery discipline. The option clause creates flexible order sizing during contract execution, impacting production planning and financial exposure. The lack of a defined BOQ suggests reliance on supplier-provided technical documentation and post-award alignment to ATC.
Key Differentiator: Final acceptance rests on Buyer ATC, with extension logic for delivery time based on quantity variances. The 25% option window requires bidders to model scenarios for capacity planning, risk management, and guaranteed lead times. This tender invites specialized vendors with eddy-current clutch drive experience.
Product/service names: TECHO-GENERATOR suitable for EDDY CURRENT CLUTCH DRIVE
Quantity/scale: Not specified in BOQ; subject to 25% quantity variation
Estimated value: Not disclosed
Standards/Certifications: Schedule-B and Buyer-added ATC imply compliance with organization-specific technical standards
Delivery: Delivery period adjustable per option clause; minimum 30 days extension rule
Warranty/AMC: Not specified in data; expect ATC to define warranty terms
Delivery quantity can swing by 25% at award and during contract at contracted rates
Final technical terms will be governed by Schedule-B and Buyer-added ATC
Extending delivery time follows a defined formula with a 30-day minimum
Not specified in data; bidders should await ATC for payment milestones and schedule
Delivery period adjusted based on quantity variations; minimum extension 30 days
Not specified in data; ATC will define penalties for delays or non-compliance
Experience in supplying TECHO-GENERATOR or eddy current clutch drive systems
Ability to meet Schedule-B and Buyer-added ATC requirements
Financial stability evidenced by recent statements and GST/PAN validity
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LP(P) -2681 TECHO-GENERATOR FOR EEDDY CURRENT CLUTCH DRIVE SUITABLE
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
6
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Tapi
Delivery Pincodes
394680
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pallavkumar Maganbhai Solanki | 394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI | Tapi | Gujarat | 394680 | 4 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar TECHO-GENERATOR or eddy current clutch projects
Financial statements (past 3 years or as applicable)
EMD payment proof or refundable deposit as per tender
Technical bid documents demonstrating ATC compliance
OEM authorization letters (where applicable)
Schedule-B alignment evidence and ATC acknowledgement
Any prior project completion certificates relevant to eddy-current drive systems
Key insights about GUJARAT tender market
Bidders should submit the required bidder documents per terms, check Schedule-B and the Buyer-added ATC, provide technical compliance details for the TECHO-GENERATOR with EDDY CURRENT CLUTCH DRIVE, and plan for a potential 25% quantity variation. Ensure GST, PAN, and EMD are ready prior to submission.
Required documents include GST registration, PAN card, 3-year financial statements, experience certificates for similar projects, EMD proof, OEM authorizations if applicable, technical bid demonstrating ATC compliance, and Schedule-B alignment with ATC terms.
The tender terms rely on Schedule-B and a Buyer-added ATC; final technical and compliance requirements will be defined in the ATC and must be strictly followed for bid eligibility and post-award execution.
Delivery quantity may vary up to 25% at contract placement and during currency at contracted rates. The extension computes as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
Provide model numbers, torque and speed ratings, mounting interfaces, electrical ratings, and compatibility data with eddy-current clutch systems, plus installation and maintenance plans aligned with Schedule-B and ATC standards.
ATC will govern all tender terms; submission should reflect compliance with the final ATC, Schedule-B, and performance expectations to be considered responsive and eligible for award.
Payment terms are defined in the final ATC; bidders should prepare pricing aligned to contract rates, and anticipate milestone payments upon delivery, inspection, and acceptance per the ATC schedule.
Study Schedule-B requirements to align material specifications, traceability, testing, and delivery terms; ensure all technical and commercial submissions reference Schedule-B clauses to avoid disqualification.