Bid Publish Date
04-Nov-2024, 6:00 pm
Bid End Date
10-Dec-2024, 2:00 pm
EMD
₹15,000
Progress
Bokaro Power Supply Company Private Limited invites bids for Impeller with Saft Assembly Type: RH, Impeller with Saft Assembly Type: LH. Quantity: 4. Submission Deadline: 10-12-2024 14: 00: 00. Submit your proposal before the deadline.
Quantity
4
Category
Impeller with Saft Assembly Type: RH
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
Min. Avg. Annual Turnover
7
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Impeller with Saft Assembly Type: RH , Impeller with Saft Assembly Type: LH
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
The eligibility requirements include being a registered entity, demonstrating a minimum average annual turnover of 7 Lakh over the past three years, and providing essential documentation like OEM Authorization certificates. Additionally, no exemptions for MSEs or Startups are applicable.
Bidders must submit several certificates, including evidence of experience criteria, bidder turnover, an OEM Authorization Certificate, and any requested documentation in the Additional Terms and Conditions (ATC). Failure to provide these certificates may lead to disqualification.
To initiate the registration process, bidders need to register on the GeM portal. Upon registration, they must ensure that all necessary documents and certifications are uploaded in compliance with the tender's requirements.
Bidders must ensure that all documents are submitted in accepted formats as specified in the tender documentation. Typically, formats like PDF and DOCX are preferred, but it is advisable to refer to the specific tender document for detailed specifications.
The technical specifications are derived from the requirements surrounding the Impeller with Shaft Assembly type. Bidders are advised to review all linked documents for detailed information regarding the specifications.
Bidders must meet the quality standards defined in the tender documents and comply with industry norms pertinent to thermal power applications. Specific standards will be outlined in the referenced documents.
Yes, all bidders must comply with the relevant national and industry-specific standards detailed in the tender and provide necessary certification to substantiate their compliance.
The testing criteria are mentioned in the technical specifications and may require bidders to provide proof of product testing results to demonstrate compliance with quality and safety standards.
Bidders are required to submit an Earnest Money Deposit (EMD) of 15,000 to participate in the bidding process. This amount is essential to ensure intent and commitment towards winning the bid.
While specific performance security requirements are not detailed in the current documentation, it is essential for bidders to review the main tender document for updates regarding security deposit requirements post-award.
Payment terms are typically outlined in the awarded contract, but generally incorporate milestone payments tied to delivery milestones, contingent upon the successful verification of compliance with specifications.
The evaluation of prices will consider the total value-wise approach, which includes the bid price alongside compliance with all terms set out in the tender. The best price that meets operational and technical criteria will be preferred.
Bidders may be required to submit their bid documents electronically through the GeM portal as per the procedures outlined in the main tender document. Offline submissions might not be accepted unless stated otherwise.
While specific deadlines are typically stated, it is pivotal for bidders to review the tender documentation for precise key timelines related to submission, opening, and processing of bids.
The evaluation and selection process involves a total value-wise evaluation and will align with the H1-Highest Priced Bid Elimination rule to ensure that all bids are assessed efficiently and transparently.
Successful bidders will be notified through the official GeM portal or the channels mandated by the Ministry of Power. All bidders will receive communication regarding acceptance or rejection of their bids.
No specific benefits or exemptions are mentioned for Micro, Small, and Medium Enterprises (MSEs) in this tender regarding experience and turnover.
Similar to MSEs, there are no explicit provisions or exemptions for startups concerning years of experience and turnover requirements as listed in the tender.
The tender aligns with the 'Make in India' initiative, encouraging local manufacturing and procurement where applicable, although specific local content requirements are not elaborated.
Potential bidders will need to adhere to local content regulations where applicable, details of which may be found in the related procurement policies or referenced documents.