Bid Publish Date
09-Oct-2026, 12:37 pm
Bid End Date
19-Oct-2026, 8:00 pm
Location
Progress
Public procurement opportunity for Indian Army PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft, Insulated Floor 100 mm Insulation Food Grade Finish, Cold Room Door 3 5 Ft 7 Ft Insulated Sliding, Electrical Control Panel MCB Contactor Wiring Protection, Led Lighting Cold Room Suitable, Racks Arrangement Basic Storage Racks, Installation Commissioning Complete Installation in Aurangabad, MAHARASHTRA. Quantity: 7 issued by. Submission Deadline: 19-10-2026 20: 00: 00. View full details and respond.
Quantity
7
Category
PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
OEM Avg. Turnover
12
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft , Insulated Floor 100 mm Insulation Food Grade Finish , Cold Room Door 3 5 Ft 7 Ft Insulated Sliding , Electrical Control Panel MCB Contactor Wiring Protection , Led Lighting Cold Room Suitable , Racks Arrangement Basic Storage Racks , Installation Commissioning Complete Installation
Pre-Bid Date
13-10-2026 12:00:00
Pre-Bid Venue
Military Camp, Ch. Sambhajinagar
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Aurangabad
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Aurangabad | Aurangabad | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft
PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft
Insulated Floor 100 mm Insulation Food Grade Finish
Insulated Floor 100 mm Insulation Food Grade Finish
Cold Room Door 3 5 Ft 7 Ft Insulated Sliding
Cold Room Door 3 5 Ft 7 Ft Insulated Sliding
Electrical Control Panel MCB Contactor Wiring Protection
Electrical Control Panel MCB Contactor Wiring Protection
Led Lighting Cold Room Suitable
Led Lighting Cold Room Suitable
Racks Arrangement Basic Storage Racks
Racks Arrangement Basic Storage Racks
Installation Commissioning Complete Installation
Installation Commissioning Complete Installation
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft | PUF Insulated Panels 80 MM Walls Ceiling of Room size 12 12 10 Ft | 1 | pieces | buyer.eco2 | 15 | |
| 2 | Insulated Floor 100 mm Insulation Food Grade Finish | Insulated Floor 100 mm Insulation Food Grade Finish | 1 | pieces | buyer.eco2 | 15 | |
| 3 | Cold Room Door 3 5 Ft 7 Ft Insulated Sliding | Cold Room Door 3 5 Ft 7 Ft Insulated Sliding | 1 | pieces | buyer.eco2 | 15 | |
| 4 | Electrical Control Panel MCB Contactor Wiring Protection | Electrical Control Panel MCB Contactor Wiring Protection | 1 | pieces | buyer.eco2 | 15 | |
| 5 | Led Lighting Cold Room Suitable | Led Lighting Cold Room Suitable | 1 | pieces | buyer.eco2 | 15 | |
| 6 | Racks Arrangement Basic Storage Racks | Racks Arrangement Basic Storage Racks | 1 | pieces | buyer.eco2 | 15 | |
| 7 | Installation Commissioning Complete Installation | Installation Commissioning Complete Installation | 1 | pieces | buyer.eco2 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer