Procurement Opportunity: Base preparation and contruction and asphalt base,Asphalt Levelling,8 layer synthetic all weather s in JAIPUR, RAJASTHAN

Bid Publish Date

06-Oct-2025, 1:26 pm

Bid End Date

16-Oct-2025, 2:00 pm

EMD

₹79,902

Progress

RA
Issue06-Oct-2025, 1:26 pm
Corrigendum06-Oct-2025
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

2264

Category

Base preparation and contruction and asphalt base

Bid Type

Two Packet Bid

Categories 57

Public procurement opportunity for Dg Armed Forces Medical Service Base preparation and contruction and asphalt base, Asphalt Levelling, 8 layer synthetic all weather surface for basket ball, Accessories international basketball polecomma side paddingcomma anti rust acrylic board with dunking ring and net, Fenching Work in JAIPUR, RAJASTHAN. Quantity: 2264 issued by. Submission Deadline: 16-10-2025 14: 00: 00. View full details and respond.

Documents 5

GeM-Bidding-8365978.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Laying of Asphalt Base,Acrylic Synthetic Surface on Asphalt Base 8 Layer ITF certified,Fiber Glass

Controller General Of Defence Accounts

SRINAGAR, JAMMU & KASHMIR

Posted: 17 June 2025
Closed: 8 July 2025
GEM

Base Preparation and Laying of Asphalt base with scope of work,Acrylic Synthetic Surface and Synthe

Indian Army

PUNE, MAHARASHTRA

Posted: 17 July 2025
Closed: 4 August 2025
GEM

Preparation of Sub Base Laying of Asphalt Base for Synthetic Basketball Court,Multilayer Cushioned

Indian Army

Posted: 7 December 2024
Closed: 28 December 2024
GEM

Base Preparation and Laying of Asphalt Base,Asphalting,Drainage System,Edge Wall,Synthetic Surface,

Indian Army

PUNE, MAHARASHTRA

Posted: 26 June 2025
Closed: 17 July 2025
GEM

Asphalt Base,All Weather Acrylic Synthetic Surface 8 Layer Ultra Cushion,Basketball Court accessori

Indian Army

PATIALA, PUNJAB

Posted: 19 August 2025
Closed: 9 September 2025
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Base preparation and contruction and asphalt base BASE PREPARATION CONTRUCTION ASPHALT BASE 1 Preparation of ground. 2 Excavation of ground upto depth of 6 inches from ground. 3 Watering compaction and dressing excavation given a gradient of 1 ratio 120 towards one side depending where the maint drainage is located. 4 Application of weed killer anti termite and soil stabilizer. 5 Supplying spreading and leveling 1st layer of stone blast size 45 to 65 mm for wbm thickness 3 inches 6 Suppling spreading good earth mixing with soil for water bound consolidated and compacting by watering and rolling. 7 Supplying spreading and leveling 2d layer of stone blast size 45 to 65mm for wbm thickness 3inches after compacting. 8 Supplying spreading good earth mixing with soil for water bound consolidated and compacting by watering and rolling. 646 sqm procurement@officer 60
2 Asphalt Levelling ASPHALTING LEVELLING 1 Cleaning of surface wire brushing before starting asphalat laying and spread a layer or primer bitumen coat 80 or 100grade. 2 Providing and laying of levelling course bituminous layer of 30 to 50mm after compacting using 10 to 20mm stones with 80 to 100 grade bitumen. 3 Providing and laying of bitumen tack coat spraying the bitumen emulsion 80 or 100 grade. 4 Providing and laying of final bituminous layer of 20 to 30mm after compacing using of 6 to 10mm stones with 80 to 100 grade bitumen. 5 Providing and laying seal coat with stone dust including min bitumen mix 80 or 100grade 6 Providing and laying water drains surrounding the groung. 646 sqm procurement@officer 60
3 8 layer synthetic all weather surface for basket ball 8 LAYER SYNTHETIC ALL WEATHER SURFACE FOR BASKET BALL 1 Cushion system ratio preparation repair small subfloor repairs if any using acrypatch. 2 Layer 1 acrylic primer 100percentage acrylic latex based primer which promotes better adhesion of repair products and coating application. 3 Layer 2 acrylic resurfacer 100percentage acrylic latex based resurfacer for filling and smoothing asphalt or concrete surface fills the surface chips voids and conceals repairs while providing a smooth surface for colour coating. 4 Layer 3 acrylic cushion 100percentage acrlic latex based. cushion coating desinged to provide resilience to sports surfaces. 5 Layer 4 acrylic cushion 100percentage acrlic latex based cushion coating desinged to provide resilience to sports surfaces. 6 Layer 5 acrylic cushion 100percentage acrlic latex based cushion coating designed to provide resilience to sports surfaces. 7 Layer 6 recoat color layer quartz filled 100percentage acrlic latex based textured colour coat having high pigment concentratin colour coating. 8 Layer 7 precoat colour layer quartz filled 100percentage acrlic latex based textured colour coat having high pigment concentratin colour coating. 9 Layer 8 top coat colour layer 100percentage acrylic latex polymer clear vanish having protective top coat against UV. 10 Line marking line marking acrylic based line marking to identify type of sports its rules 11 Court line marking. 646 sqm procurement@officer 60
4 Accessories international basketball polecomma side paddingcomma anti rust acrylic board with dunking ring and net ACCESSORIES Supply and installation of fix type internation standards basketball pole in 6 inches round pipe with 2.2 mtr projection with front side padding and with 20 mm one more transparebt power coated anti rust acrylic board with dunking ring and net. 1 set procurement@officer 60
5 Fenching Work FENCING WORK 1 Fixing of chain linked fence around the court of 10ft total height 2 Using apollo ms pipe vertical 2inches mm od keeping at a distance of 10ft each vertical pipe. 3 1.5 inches od horizontal pipe fixing at a gap of 4 10ft height. 4 Mesh using 3mm dia gi coated wire with 55mm spacing. 5 Providing two entry gate size 7ft x 3.5ft using same material. 6 Entire work complete red oxide primer and painted 325 sqm procurement@officer 60

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

06-Oct-2025

Reverse Auction Schedule

Completed

Start

25-Oct-2025, 11:00 am

End

27-Oct-2025, 11:00 am

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1sheetal enterprises   Under PMA Winner ₹15,95,000Item Categories : Base preparation and contruction and asphalt base,Asphalt Levelling,8 layer synthetic all weather s
L2ambika enterprises   Under PMA₹16,26,128Item Categories : Base preparation and contruction and asphalt base,Asphalt Levelling,8 layer synthetic all weather s
L3Ramsetu traders   Under PMA₹16,35,213Item Categories : Base preparation and contruction and asphalt base,Asphalt Levelling,8 layer synthetic all weather s
L4YUVRAJ TRADERS   Under PMA₹16,49,934Item Categories : Base preparation and contruction and asphalt base,Asphalt Levelling,8 layer synthetic all weather s

🎉 L1 Winner

sheetal enterprises   Under PMA

Final Price: ₹15,95,000