Progress
The Indian Army, Department Of Military Affairs, seeks procurement of multiple electrical and ironing equipment including an Automatic Steam Generator 9 KW, Vacuum Ironing Table, Steam Iron Box with Plate, Silicon Plate Rest Pad, Four Pole 63 A Miniature Circuit Breaker, and Five Core Copper Power Cable 6 SQ MM. The package covers supply, installation, testing, commissioning and operator training, with statutory clearances if required. The BOQ lists 6 items in total, highlighting a multi-item equipment bundle for military facilities. The scope emphasizes on-site installation and post-installation support. This tender stresses OEM turnover and service-center capabilities within consignee states. Such configuration indicates a standardized, modular setup suitable for centralized maintenance workshops or field depots.
Automatic Steam Generator 9 KW
Vacuum Ironing Table
Steam Iron Box with Plate
Silicon Plate Rest Pad
Four Pole 63 A Miniature Circuit Breaker
Five Core Copper Power Cable 6 SQ MM
Option to vary quantity up to 25% at contract placement and during currency
Supply, installation, testing, commissioning and operator training included
Bidder and OEM turnover criteria over the last 3 years with audited evidence
Not explicitly stated; bidders must refer to bid documents for payment schedule and milestones
Delivery period may be adjusted via option clause; additional time calculation via ( Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in available data; penalties to be detailed in the bid document
Minimum average annual turnover for last 3 years as specified in bid document
OEM turnover criteria met by primary product category
Functional service center in the State of each consignee location
Quantity
24
Category
AUTOMATIC STEAM GENERATOR 9 KW
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
10 %
Warranty Period
3 days
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AUTOMATIC STEAM GENERATOR 9 KW , VACUUM IRONING TABLE , STEAM IRON BOX WITH PLATE , SILICON PLATE REST PAD , FOUR POLE 63 A MINIATURE CIRCUIT BREAKER , FIVE CORE COPPER POSER CABLE 6 SQ MM
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bangalore
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bangalore | Bangalore | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
AUTOMATIC STEAM GENERATOR 9 KW
AUTOMATIC STEAM GENERATOR 9 KW
VACUUM IRONING TABLE
VACUUM IRONING TABLE
STEAM IRON BOX WITH PLATE
STEAM IRON BOX WITH PLATE
SILICON PLATE REST PAD
SILICON PLATE REST PAD
FOUR POLE 63 A MINIATURE CIRCUIT BREAKER
FOUR POLE 63 A MINIATURE CIRCUIT BREAKER
FIVE CORE COPPER POSER CABLE 6 SQ MM
FIVE CORE COPPER POSER CABLE 6 SQ MM
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | AUTOMATIC STEAM GENERATOR 9 KW | AUTOMATIC STEAM GENERATOR 9 KW | 1 | nos | aopctc1 | 15 | |
| 2 | VACUUM IRONING TABLE | VACUUM IRONING TABLE | 1 | nos | aopctc1 | 15 | |
| 3 | STEAM IRON BOX WITH PLATE | STEAM IRON BOX WITH PLATE | 3 | nos | aopctc1 | 15 | |
| 4 | SILICON PLATE REST PAD | SILICON PLATE REST PAD | 8 | nos | aopctc1 | 15 | |
| 5 | FOUR POLE 63 A MINIATURE CIRCUIT BREAKER | FOUR POLE 63 A MINIATURE CIRCUIT BREAKER | 1 | nos | aopctc1 | 15 | |
| 6 | FIVE CORE COPPER POSER CABLE 6 SQ MM | FIVE CORE COPPER POSER CABLE 6 SQ MM | 10 | mtrs | aopctc1 | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited balance sheets or CA certificate indicating turnover for last 3 years
OEM authorization (if applicable)
Technical bid documents showing compliance with equipment specifications
Proof of service centers in relevant states
Any statutory clearance certificates required by the tender terms
Key insights about KARNATAKA tender market
To bid, bidders must submit audited turnover reports for the last 3 years, GST and PAN, OEM authorizations if applicable, and technical bid documents showing compliance for the listed equipment: automatic steam generator 9 KW, vacuum ironing table, and related electrical items. Include service-center details and any statutory clearances requested in the Terms.
Required documents include GST certificate, PAN card, audited financial statements or CA turnover certificate for 3 years, OEM authorization, service-center proof in consignee states, and technical bid detailing conformity to the listed equipment specifications and installation scope.
Delivery terms permit quantity adjustments up to 25% and extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Final delivery schedule will follow the contract delivery order and option clause implications.
The package includes an Automatic Steam Generator 9 KW, Vacuum Ironing Table, Steam Iron Box with Plate, Silicon Plate Rest Pad, Four Pole 63 A MCB, and Five Core Copper Power Cable 6 SQ MM. All items come under supply, installation, testing, commissioning, and operator training.
Both bidders and OEMs must meet the minimum average annual turnover for the last three years, supported by audited balance sheets or CA certificates. If the entity is under 3 years old, turnover is calculated on completed years post-incorporation.
Bidders must have functional service centers in the state of each consignee location, ensuring support for carry-in war scenarios. This requirement ensures prompt maintenance and availability of spare parts for the listed electrical equipment.
Yes. The scope includes installation, testing, commissioning, and operator training. Vendors should provide training programs for end-users and ensure compliance with local installation standards while coordinating with Army facilities for commissioning.