Aluminium Composite Panel Sheet
N/a
BALLIA, UTTAR PRADESH
Bid Publish Date
28-Nov-2025, 9:01 am
Bid End Date
08-Dec-2025, 10:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Hindustan Petroleum Corporation Ltd. The tender seeks procurement of aluminium partition walls with ACP panels. No explicit quantity or estimated value is provided. Tender appears to incorporate a highly flexible quantity clause and post-award option adjustments, with GST considerations noted. The procurement focus is internal fit-out or modular partitioning, requiring compatible ACP panel assemblies and aluminium framing. The absence of BOQ items suggests a design-build or specification-driven order, distinct from standard commodity tenders. A prominent differentiator is the option to increase or decrease order quantity by up to 25%, and to extend delivery within the same contracted rates. This tender emphasizes adherence to the option clause and GST alignment at bidder cost.
Product/service names: aluminium partition walls with ACP panels
Quantity details: not specified (BOQ shows Total Items: 0)
Estimated value: not provided
Experience/eligibility: not specified
Standards/certifications: not specified
Delivery/installation: not specified
GST considerations: bidders must determine GST; reimbursement as per actuals or applicable rates
Option clause permits ±25% quantity adjustment at contract formation and during currency
GST is not automatically reimbursed; bidders must quote GST and it will be reimbursed per actuals or applicable rates
ATC/GTC terms to be followed as per uploaded tender documents; refer to Buyer Uploaded ATC
Not specified in provided data; GST handling described separately in terms
Delivery period adjustments triggered by option clause; minimum 30 days for additional time
Not specified in available data
Not specified in tender data; refer to uploaded ATC and GTC documents
GST registration to be confirmed by bidder per terms
Ability to meet option-clause delivery adjustments up to 25%
N/a
BALLIA, UTTAR PRADESH
Western Railway
VADODARA, GUJARAT
Deputy Conservator Of Forest Sf Division Valsad
VALSAD, GUJARAT
Gujarat State Road Transport Corporation
AHMEDABAD, GUJARAT
Directorate Of Economics And Statistics
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about KARNATAKA tender market
Bidders should submit the technical and financial bids along with GST details, GST registration, PAN, and experience certificates. The tender allows a ±25% quantity adjustment at contract and during currency. Ensure compliance with uploaded ATC and GTC; review delivery timing calculations (minimum 30 days) for any varied quantity.
Required documents include GST registration, PAN, company GST details, experience certificates for similar ACP projects, financial statements, EMD documentation if applicable, OEM authorizations, and Technical bid documents per uploaded ATC. Verify bid submission format per tender portal guidelines.
Delivery terms rely on the option clause: quantity may increase or decrease by up to 25% at contract. If extended, delivery time is calculated as (increased quantity ÷ original quantity) × original period, with a minimum of 30 days. Contracts maintain original rates during extensions.
GST must be verified by bidders; reimbursement will be as per actuals or the applicable GST rates, whichever is lower, and capped by the quoted GST percentage. This requires accurate GST invoicing and alignment with tender terms.
Refer to the Buyer Uploaded ATC and the uploaded tender document for specifications beyond this data. Compliance with IS/industry standards and any OEM requirements will be specified there; ensure alignment before submission.
The provided data does not include an estimated value or BOQ quantities. Bidders should await the official tender documents or view the BOQ attachments to determine scale and pricing strategy.
Review ATC, GTC, and tender terms for eligibility; ensure bidder has necessary ACP panel installation experience, GST compliance, and financial capability. Prepare OEM authorizations if required and demonstrate past similar project execution.
The specific submission deadline is not provided in the data. Bidders must consult the official tender portal or the uploaded ATC document to confirm the precise deadline and submission instructions.
Access all tender documents at no cost
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS