Bid Publish Date
17-Aug-2026, 10:20 am
Bid End Date
01-Sep-2026, 10:00 am
EMD
₹19,007
Location
Progress
The Indian Army, under the Department Of Military Affairs, invites bids for a Tea CTC (Defence) procurement in 2026. The estimated value is not disclosed; the EMD is ₹19,007. The tender applies to the defence sector and includes at least one option clause permitting quantity fluctuations up to 50% of bid quantity during contract execution. Demurrage penalties apply at 0.5% of total contract value per day if rejected items are not lifted within 48 hours. Shelf life must equal the warranty period and items should be latest manufacture with full life at delivery. Bidder must upload a PAN, GSTIN, cancelled cheque, and EFT mandate. The ATC references a vendor code process and a one-time ATC document upload. The tender may require substantial compliance and supply chain readiness for ration items under logistics constraints.
Product/service: Tea CTC (Defence) procurement
EMD: ₹19,007
Demurrage: 0.5% of total contract value per day
Shelf life: equal to warranty period; 100% life at delivery
Vendor code: PAN, GSTIN, cancelled cheque, EFT mandate
Option clause: quantity ±50%; delivery time recalculation formula
BOQ: No items listed; scope not quantified
EMD amount and payment terms as specified: ₹19,007
Delivery window: 48 hours for lifting; possible extended period via option clause
Documentation: PAN, GSTIN, EFT mandate; vendor code related requirements
EMD ₹19,007; other payment terms not detailed in data
Delivery/lift window of 48 hours; option clause allows up to 50% quantity change with extended delivery period
Demurrage charges at 0.5% of total contract value per day; destruction of rejected items after one month
Not under liquidation or bankruptcy
Must provide PAN, GSTIN, EFT mandate
Must adhere to demurrage and shelf-life requirements
Quantity
4050
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Tea CTC (V2) (Defence) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
6
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
ALLAHABAD
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | ALLAHABAD | ALLAHABAD | - | - | 4050 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
- PAN Card copy
- GSTIN copy
- Cancelled cheque copy
- EFT Mandate (bank certified)
- Undertaking of non-liquidation/non-bankruptcy
- Any ATC/document uploaded by Buyer
| Category | Specification | Requirement |
|---|---|---|
| Packaging and Marking | Net Content of each Packet/ Type of Packaging | 100 gram / Standup Zip Pouch, 150 gram /Standup Zip Pouch, 200 gram / Standup Zip Pouch, 500 gram / Standup Zip Pouch, 500 gram / Refill Pack (Bag in Box), 1000 gram / Refill Pack (Bag in Box) |
Key insights about UTTAR PRADESH tender market
Bidders should submit PAN, GSTIN, cancelled cheque, and EFT mandate, along with EMD of ₹19,007. Ensure non-liquidation status and provide an undertaking. The tender includes a 50% quantity option and 48-hour lift window; shelf life must match warranty period.
Submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank. Include an undertaking that the bidder is not under liquidation or bankruptcy, per Buyer Added Terms.
Delivery must be completed with a 48-hour lift window for rejected items; demurrage at 0.5% of total contract value per day applies; for non-lift after one month, items are destroyed with no claim admitted.
The purchaser may increase or decrease the order by up to 50% of the bid quantity at contract placement and during currency, with delivery time adjustments using the defined formula.
Shelf life must equal the warranty period and be the latest manufacture with 100% defined life at delivery. Items should comply with current production standards.
EMD is ₹19,007. Payment terms beyond this are not detailed in the data; ensure EMD submission with bid, per mandatory procurement terms.