Bid Publish Date
18-Dec-2024, 7:26 pm
Bid End Date
08-Jan-2025, 5:00 pm
Location
Progress
Public procurement opportunity for Office Of The District Magistrate Municipal solid waste Twin shaft shredder (Q3) in DINAJPUR UTTAR, WEST BENGAL. Quantity: 1 issued by. Submission Deadline: 08-01-2025 17: 00: 00. View full details and respond.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CLEAN WASTE PLANNING INDIA PRIVATE LIMITED Under PMA | Make : NA Model : WHEM-MTSS-3TCAP. | 14-01-2025 10:50:40 | |
| 2 | CNG AGROCARE PRIVATE LIMITED Under PMA | Make : Greenera Engineering Model : GE TSS 20 | 08-01-2025 12:27:10 | |
| 3 | PIYUSH ENGINEERING ENTERPRISE Under PMA | Make : Greenera Engineering Model : GE TSS 20 | 08-01-2025 12:47:13 | |
| 4 | PUNJAB ENGINEERING WORKS Under PMA | Make : Greenera Engineering Model : GE TSS 20 | 08-01-2025 16:34:13 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | CNG AGROCARE PRIVATE LIMITED Under PMA | Item Categories : Municipal solid waste Twin shaft shredder | |
| L2 | PIYUSH ENGINEERING ENTERPRISE Under PMA | Item Categories : Municipal solid waste Twin shaft shredder | |
| L3 | PUNJAB ENGINEERING WORKS Under PMA | Item Categories : Municipal solid waste Twin shaft shredder |
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
2
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Municipal solid waste Twin shaft shredder (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
14-Jan-2025, 9:30 am
Opening Date
14-Jan-2025, 10:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about WEST BENGAL tender market
Details are provided in the tender document.
A1: To be eligible for this tender, bidders must have a minimum average annual turnover of ₹2 Lakh for the last three years and three years of past experience in supplying similar products to government organizations or PSUs.
A2: Bidders must submit experience criteria, past performance records, turnover details, and specific certificates as requested in the Additional Terms and Conditions (ATC).
A3: No, the tender does not provide exemptions for Micro, Small, and Medium Enterprises (MSEs) or startups concerning experience and turnover criteria.
A4: The shredder must have twin shaft design capable of handling various waste types, operating under light to medium duty, with specified motor powers ranging from 5 HP to 20 HP, and a warranty of at least one year.
A5: The evaluation process is determined by total value-wise assessment, focusing on the bidders’ past performance and compliance with technical requirements.
A6: Payment terms will be outlined in the final contract; bidders should refer to the relevant sections in the bidding document for detailed information.
A7: The bid submission deadline is 08 January 2025 by 17:00, and the bid opening will occur on the same day at 17:30.
A8: The shredders are to be delivered to the Office of the District Magistrate & Collector in Uttar Dinajpur, West Bengal.
A9: No, an Earnest Money Deposit (EMD) is not required for participating in this tender.
A10: The warranty for the shredders is for a minimum of one year, which includes free service and spare parts.
A11: The shredder must operate on a three-phase input supply at 440 V, 50 Hz.
A12: Yes, bidders from countries sharing a land border with India must be registered with the competent authority and comply with the regulations regarding international bidding.
A13: The bid offer must remain valid for 30 days from the bid end date.
A14: Yes, bidders are allowed 2 days to request any technical clarifications during the evaluation process.
A15: Additional terms include stipulations for ISO certification, local delivery requirements, and installation criteria within 30 days post-order confirmation.
Details are provided in the tender document.