Bid Publish Date
09-Jul-2026, 9:27 am
Bid End Date
21-Jul-2026, 10:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is issued by the Rourkela Steel Plant under the Steel Authority of India Limited for the Sinter Machine Feed End Curve Track Frame Assembly category. The bid scope covers supply of goods only, with no BOQ quantity details disclosed. The buyer reserves quantity variation up to 25% at contract award and again during the contract currency, at contracted rates. Delivery timelines hinge on the last date of the original delivery order, with added time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. An ATC document is referenced for bidder compliance. This tender emphasizes flexibility in order quantity and delivery timing, suitable for suppliers with scalable manufacturing capabilities. The procurement appears to be part of a broader SI/SAIL supply chain requirement and is categorized under specialized track frame assemblies.
Product: Sinter Machine Feed End Curve Track Frame Assembly
Category: Specialized track frame component for sinter machines
Quantity/Value: Not disclosed; 25% variation allowed
Delivery: Minimum 30 days extension; formula = (Increased quantity ÷ Original quantity) × Original delivery period
Standards/Testing: Not specified in tender data; verify via ATC
Warranty/Support: Not specified; confirm in ATC/contract
OEM/Brand: Not specified; refer to ATC for any branding requirements
Quantity variation up to 25% during contract; must be at contracted rates
Supply-only scope; no installation or commissioning included
ATC document governs technical/commercial conditions and compliance
Not specified in data; payment terms to be detailed in ATC and contract
Delivery period tied to last delivery order date; extended time calculated with minimum 30 days
Not disclosed; confirm LD terms in ATC/contract
Ability to supply track frame assemblies for sinter machines
Compliance with ATC terms and conditions
Financial capacity to handle 25% quantity variation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Sinter Machine Feed End Curve Track Frame Assembly- 76035
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Sundargarh
Delivery Pincodes
769011
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| AJIT KUMAR SAHOO | 769011,PS-II STORE, SAIL - ROURKELA STEEL PLANT | Sundargarh | Odisha | 769011 | 1 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply
Financial statements (annual reports / turnover as applicable)
EMD/Security deposit documentation (as per ATC)
Technical bid documents and compliance certificates
OEM authorizations (if applicable)
Key insights about ODISHA tender market
Bidders should review the ATC document linked to the tender, submit GST and PAN, provide experience certificates for similar supply, and prepare a supply-only bid. The contract allows up to 25% quantity variation and requires adherence to the delivery-time formula with a minimum 30 days extension.
Required documents typically include GST certificate, PAN card, experience certificates, financial statements, EMD documentation, technical bid, and OEM authorizations if applicable. Ensure ATC-specific documents are uploaded as per the buyer terms to participate.
Delivery may be increased up to 25% at contract award and during currency at contracted rates. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; further extension possible within original delivery period.
Scope is strictly the supply of goods; no installation, commissioning, or service components are specified in the current data. Ensure your proposal reflects goods-only delivery per ATC terms.
No explicit standards are listed in the public data. Bidders should consult the ATC document for any required certifications or engineering standards before submission.
The start and end dates are not published in the available data. Bidders should rely on the ATC notification and portal updates to confirm bid deadlines and submission process.
Exact payment terms are not disclosed in the available data. Expect ATC to specify payment milestones, and confirm if payment aligns with delivery milestones and acceptance testing.
Eligibility includes capacity to supply track frame assemblies, compliance with ATC terms, and ability to meet quantity variation requirements. Vendors should provide prior related experience and financial documents as part of the technical bid.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS