Clutch booster assy,Fuel filter,Accelerator cable,System protection valve kit,Hub seal front,Hub se
Indian Army
JORHAT, ASSAM
Bid Publish Date
11-Nov-2025, 9:44 am
Bid End Date
21-Nov-2025, 10:00 am
Location
Progress
Quantity
26
The Indian Army, Department Of Military Affairs, invites bids for a multi-item procurement including Speedometer Cable, Rectifier Plate, De-aeration Tank, Booster Kit, Oil Seal, Armature Assembly, Bearings (Brg Bush), CE Bush, Bush, Union Brake Booster, and Kelly Kit for distribution across military logistics in Surendranagar, Gujarat 363001. The contract scope spans 11 items with potential quantity variations up to 25% of bid quantity, at contracted rates. The buyer reserves rights to modify quantities during contract execution and to extend delivery as per option clause. The estimated value and EMD are not disclosed in the provided data, necessitating preparation for standard government tender submission. This tender emphasizes compliance with delivery periodicity and flexible ordering under Indian Army procurement practices.
Product/service names from title: Speedometer Cable, Rectifire Plate, De-aeruation Tank, Booster Kit, Oil Seal, Armature Assembly, Brg Bush, CE Bush, Bush, Union Brake Booster, Kelly Kit
Quantities: Not specified in data; BoQ lists 11 items but exact quantities are unavailable
EMD/Estimated value: Not disclosed in provided data
Category: Military spare parts for automotive/engine components
Delivery terms: Option clause allows ±25% quantity variation; delivery period based on original/extended terms with minimum 30 days
Quantity adjustment up to 25% during contract at contracted rates
Delivery period calculated from last date of original delivery order with minimum 30 days
11 BoQ items across automotive spare parts with unspecified quantities
Purchaser may increase/decrease quantity by up to 25% at contracted rates during contract.
Delivery period starts from the last date of original delivery order; extended period requires calculation; minimum extension is 30 days.
Not disclosed in provided data; will be as per standard Army tender terms and conditions.
Eligibility for military spare parts supply, with demonstrated experience in automotive components
GST registration and financial stability documentation
OEM authorization (if required for brand-specific items) and compliance with relevant standards
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JORHAT, ASSAM
Indian Army
BUDGAM, JAMMU & KASHMIR
Indian Army
Indian Army
Ajmer, RAJASTHAN
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Speedometer Cable | Speedometer Cable | 1 | pieces | wkspoffr2@ | 15 |
| 2 | Rectifire Plate | Rectifire Plate | 1 | pieces | wkspoffr2@ | 15 |
| 3 | De-aeruation tank | De-aeruation tank | 1 | pieces | wkspoffr2@ | 15 |
| 4 | Booster Kit | Booster Kit | 2 | pieces | wkspoffr2@ | 15 |
| 5 | Oil Seal | Oil Seal | 1 | pieces | wkspoffr2@ | 15 |
| 6 | Armature Assy | Armature Assy | 2 | pieces | wkspoffr2@ | 15 |
| 7 | Brg Bush | Brg Bush | 3 | pieces | wkspoffr2@ | 15 |
| 8 | CE Bush | CE Bush | 3 | pieces | wkspoffr2@ | 15 |
| 9 | Bush | Bush | 3 | pieces | wkspoffr2@ | 15 |
| 10 | Union Brake Booster | Union Brake Booster | 6 | pieces | wkspoffr2@ | 15 |
| 11 | Kelly Kit | Kelly Kit | 3 | pieces | wkspoffr2@ | 15 |
GST registration certificate
PAN card
Experience certificates for similar automotive/spares supply
Financial statements demonstrating turnover and stability
EMD/Security deposit documents as per tender terms
Technical bid documents and supplier qualification forms
OEM authorization letters (if applicable for specific parts)
Any existing certifications or compliance documents relevant to automotive components
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KAVYA TRADERS Under PMA | - | 20-11-2025 16:08:53 | Qualified |
| 2 | SAMRIDDHI ENTERPRISES Under PMA | - | 20-11-2025 16:22:45 | Qualified |
| 3 | VR MARKETING Under PMA | - | 20-11-2025 15:38:03 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | VR MARKETING(MSE)( MSE Social Category:General ) Under PMA | ₹11,620 | Item Categories : Speedometer Cable,Rectifire Plate,De-aeruation tank,Booster Kit,Oil Seal,Armature Assy,Brg Bush,CE |
| L2 | KAVYA TRADERS (MSE)( MSE Social Category:General ) Under PMA | ₹12,190 | Item Categories : Speedometer Cable,Rectifire Plate,De-aeruation tank,Booster Kit,Oil Seal,Armature Assy,Brg Bush,CE |
| L3 | SAMRIDDHI ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | ₹12,275 | Item Categories : Speedometer Cable,Rectifire Plate,De-aeruation tank,Booster Kit,Oil Seal,Armature Assy,Brg Bush,CE |
Key insights about GUJARAT tender market
Bidders should register with the centralized procurement platform, submit GST and PAN, provide experience certificates for similar supply, and furnish OEM authorizations if required. Ensure compliance with the option clause allowing ±25% quantity changes and prepare for delivery timelines starting from the last original delivery date.
Required documents include GST certificate, PAN, financial statements, experience certificates for similar work, EMD submission, OEM authorizations, and technical bid documents. Submit procurement-specific compliance certificates and any product-specific certifications to ensure eligibility for the 11-item BoQ.
Delivery terms allow a 25% quantity variation at contracted rates. The delivery period starts from the last date of the original delivery order; extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
The tender covers Speedometer Cable, Rectifier Plate, De-aeration Tank, Booster Kit, Oil Seal, Armature Assembly, Brg Bush, CE Bush, Bush, Union Brake Booster, and Kelly Kit across 11 BoQ items, with quantities not disclosed in the data.
Specific standards are not listed in the data; bidders should assume standard military automotive component compliance and obtain OEM authorizations where applicable, ensuring traceability and suitability for defense logistics.
Bid submission deadlines are not provided in the data. Bidders should monitor the official procurement portal for notification of dates, ensure timely submission of all documents, and align with delivery-time calculations under the option clause.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS