TenderDekho Logo
GEM

Indian Army Department Of Military Affairs Goods Supply Tender 2026 Iron PVC Coolers 3% PBG 50% Option

Bid Publish Date

07-Jun-2026, 10:27 am

Bid End Date

17-Jun-2026, 11:00 am

Value

₹1,00,000

Progress

Issue07-Jun-2026, 10:27 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

65

Category

IRON COOLER

Bid Type

Two Packet Bid

Key Highlights

  • Exact items include IRON COOLER, PVC COOLER LARGE, COOLER PADDING, COOLER PUMP, CAPACITOR, REGULATOR
  • Option clause allows up to 50% additional quantity within contract currency at same terms
  • Performance Guarantee: 3% of contract value; PBG valid beyond warranty by 60 days
  • Delivery extension formula: (increased quantity / original quantity) × original delivery period with minimum 30 days
  • GST/PAN/EMD documentation not explicitly specified in data; ATC requires acceptance of Special Conditions
  • Six BOQ items listed, quantities and units not disclosed; scope is limited to supply of goods
  • No explicit IS/ISO/IS code standards specified in the data; emphasis on bank guarantees and extension terms

Tender Overview

The Indian Army, Department Of Military Affairs, seeks the supply of various cooling equipment and components including IRON COOLER, PVC COOLER LARGE, COOLER PADDING, COOLER PUMP, CAPACITOR, and REGULATOR. Estimated contract value is ₹100,000.00, with the scope limited to the supply of Goods. The BOQ lists six items, though item-specific quantities are not disclosed. The buyer reserves quantity variation up to 25% at contract placement and during the currency, at contracted rates. A performance guarantee is required, and an option clause permits additional procurement up to 50% of the original quantity within the contract period. Delivery timing references will be aligned with the original delivery period. This tender emphasizes fixed-price supply with optional expansion and a formal PBG requirement.

Technical Specifications & Requirements

  • Scope of supply: Only supply of Goods as per ATC – no service component.
  • Performance Guarantee: 3% of contract value, via bank guarantee within 30 days of order receipt.
  • PBG validity: extends to 60 days beyond warranty; downtime duration adds to guarantee validity.
  • Option Clause: Buyer may procure up to 50% additional quantity under identical terms within contract currency.
  • Delivery terms: Delivery period tied to last date of original order; additional time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
  • ATC acceptance: Bidder must confirm acceptance of Special Conditions to avoid bid rejection at technical evaluation.
  • EMD/Collateral: EMD amount not disclosed in available data; PBG mechanism specified in ATC forms.
  • Scope clarity: Six items listed in BOQ; item quantities and units not disclosed in data.

Terms, Conditions & Eligibility

  • EMD: Amount not specified in the available tender data.
  • Performance Security: 3% of contract value via scheduled bank; validity until 60 days beyond warranty.
  • Delivery: As per original delivery period with option-based extension rules; minimum extension target 30 days.
  • Payment terms: Not explicitly stated in the provided terms; ATC emphasizes PBG and option-based supply.
  • Warranty/penalties: Downtime is added to PBG validity; penalties/LD not detailed in current data.
  • Documentation: Bid acceptance of ATC required; six-item BOQ present but specific quantities not provided.
  • Eligibility: Manufacturer/Supplier capable of supplying cooling equipment; OEM authorizations may be required per ATC.

Key Specifications

  • Product/service names: IRON COOLER, PVC COOLER LARGE, COOLER PADDING, COOLER PUMP, CAPACITOR, REGULATOR

  • Quantities: Not disclosed in BOQ; six items total

  • EMD/Contract value: Estimated ₹100,000.00; EMD amount not specified

  • Experience: Supplier capability for supply of cooling equipment (implied).

  • Quality/standards: Not explicitly provided; ATC requires acceptance of Special Conditions

Terms & Conditions

  • Delivery terms include extension mechanics with a minimum 30 days

  • Option to increase up to 50% of original quantity within contract currency

  • Performance Guarantee of 3% of contract value via bank guarantee

Important Clauses

Payment Terms

No explicit payment schedule stated in data; emphasis on PBG and contract compliance

Delivery Schedule

Delivery period begins from last date of original delivery order; extended time follows a calculated formula with minimum 30 days

Penalties/Liquidated Damages

Downtime contributes to PBG validity; LD specifics not detailed in available terms

Bidder Eligibility

  • Supplier with capability to supply cooling equipment in bulk

  • Compliance with ATC acceptance of Special Conditions

  • Possession of requisite banking facility for Performance Guarantee

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

IRON COOLER , PVC COOLER LARGW , COOLER PADDING , COOLER PUMP , CAPACITOR , REGULATOR

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9433486.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Cooler Pump,Capacitor,Honey Combo pad,Cooler Net,Blade 18 inch Anti Clock,Castor Wheel,Motor Nuts,M

Indian Army

KOTA, RAJASTHAN

Posted: 28 June 2025
Closed: 14 July 2025
GEM

Heavy Duty Cooler,Duct for Cooler,Iron Stand for Cooler,Tulu Pump,Heavy Duty Iron Press

Indian Army

JODHPUR, RAJASTHAN

Posted: 7 March 2026
Closed: 18 March 2026
GEM

Honey Pad For Side Wall,Water Pump,Galvanized iron sheet 8X4 24 Gauge,Duct Air cooler,Motor cooler

Indo Tibetan Border Police (itbp)

AMRITSAR, PUNJAB

Posted: 2 July 2025
Closed: 23 July 2025
GEM

Cooler Motor,Grass Pad,Water Pump,Switch Speed,Cooler Fan Blade,Cooler Wiring Set,Labor Charges

Indian Army

Pathankot, PUNJAB

Posted: 15 September 2025
Closed: 25 September 2025
GEM

Air cooler body,Cooler Fan,Cooler Water Pump,Cooler Water Tank,Installation and fitting Charges

Indian Army

HYDERABAD, TELANGANA

Posted: 25 August 2025
Closed: 6 September 2025
GEM

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

IRON COOLER

IRON COOLER

5 nos Delivery: 15 days
#2

PVC COOLER LARGW

PVC COOLER LARGW

1 nos Delivery: 15 days
#3

COOLER PADDING

COOLER PADDING

40 nos Delivery: 15 days
#4

COOLER PUMP

COOLER PUMP

8 nos Delivery: 15 days
#5

CAPACITOR

CAPACITOR

6 nos Delivery: 15 days
#6

REGULATOR

REGULATOR

5 nos Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card details

3

Experience certificates of similar supply

4

Financial statements for last 2-3 years

5

EMD/Security deposit documentation (if required under ATC)

6

Technical bid/submission documents

7

OEM authorization certificates (where applicable)

8

Any existing performance certificates related to cooling equipment

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for Indian Army cooling equipment tender in 2026

Bidders must confirm acceptance of ATC Special Conditions, submit GST, PAN, experience certificates, and financial statements, along with the required OEM authorizations. The contract value is around ₹100,000 with a 3% Performance Guarantee; ensure delivery aligns with the original delivery period and anticipate potential 25% quantity variation.

What documents are required for Army cooling equipment bid 2026

Submit GST certificate, PAN card, prior experience certificates for similar supply, financial statements, EMD documentation (if applicable), technical bid, OEM authorizations, and any manufacturer warranties. ATC requires acceptance of Special Conditions; ensure all documents are uploaded with the bid.

What are the delivery terms for the Indian Army equipment tender

Delivery starts from the last date of the original delivery order. If quantity increases, extension time is calculated by (increased quantity/original quantity) × original delivery period, with a minimum of 30 days. Delivery must comply with the contract terms and be executable within the extended window.

What is the purpose of the 3% performance guarantee in this tender

A bank guarantee equal to 3% of the contract value must be submitted within 30 days of confirmed order. The PBG remains valid for 60 days beyond the warranty period. This protects the buyer against non-performance or delays in supply obligations.

How does the 50% option clause affect procurement in this tender

The buyer can procure up to 50% additional quantity under the same terms during the contract currency. Bidders must confirm acceptance of this option clause to be eligible; it ensures scalability of supply without renegotiating terms.

What items are included in the BOQ for this Army tender

BOQ lists six items: IRON COOLER, PVC COOLER LARGE, COOLER PADDING, COOLER PUMP, CAPACITOR, REGULATOR. Quantities and units are not disclosed in the provided data, so bidders should await the official schedule or request clarifications during bid submission.

What standards or certifications are required for cooling equipment tender

Specific standards are not explicitly provided in the data. Bidders should confirm acceptance of ATC Special Conditions, provide OEM authorizations, and supply any relevant certifications per internal procurement norms. Prepare to demonstrate quality and compatibility with cooling components.

When is the payment expected after delivery for this Indian Army bid

The tender data does not specify exact payment terms. bidders should look for the payment schedule in the final contract; typical government tenders process payment after satisfactory delivery and acceptance, subject to bank guarantee compliance and contract terms.

Similar Tenders

5 found

Cooler Motor winding,Motor Ring,Motor Blade,Water Pipe,Water Pump,Wire with three Pin Plug,Button S

Indian Army

📍 JALANDHAR, PUNJAB

Est: ₹2.2 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Indian Army DESERT COOLER & MOTOR Supply Tender 2026 Rajasthan - ISI/AIS Standards 2026

Indian Army

📍 JAMMU, JAMMU & KASHMIR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Northern Coalfields Limited Hose Cooler, Hose, Motor and Evaporator Tender 2026 - IS/Insurance Free Supply of Goods

Northern Coalfields Limited

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

ICE BOX,PADESTAL FAN,WALL FAN,FARATTA FAN,WATER COOLER

Indian Army

📍 VARANASI, UTTAR PRADESH

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM

OIL COOLER COVER,OIL COOLER ELEMENT,TIMING CHAIN SET,CHAIN SPROCKET SET,REAR BRAKE SHOE,WATER PUMP

Indian Army

📍 MATHURA, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us