NMDC Steel Limited invites bids for the supply of FRL units (Filter, Regulator, and Lubricator) intended for Coke oven batteries and blast furnaces at NSL facilities. The procurement is located in BASTAR, CHHATTISGARH (494001), with an estimated value not disclosed. The scope is limited to the supply of Goods only, with the option to increase quantity by up to 25% during contract execution. A 6-week delivery period from PO date is mandated. Bidders should note the 100% payment in 30 days post receipt and acceptance, excluding GST. Unique conditions include required manufacturer test certificates and a structured extension mechanism for quantity variations. This tender emphasizes strict adherence to delivery timelines and post-delivery documentation, while maintaining flexibility for batch size adjustments within contractual limits.
Delivery within 6 weeks from PO date with no advance payment
100% payment within 30 days after receipt/acceptance
Penalty for delays: 0.5% weekly up to 5% of basic order value
100% payment within 30 days on receipt and acceptance; no advance payment.
Delivery to NSL central instrumentation department within 6 weeks of PO.
0.5% of basic order value per week of delay, max 5% excluding GST.
Manufacturer or authorized supplier for FRL units
Ability to provide manufacturer test certificates
Compliance to delivery and payment terms as stated
Quantity
25
Bid Type
Single Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Air Filter regulator
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
43
Delivery Locations
1
Delivery Cities
Raipur
Delivery Pincodes
494001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mahendra Raud | 494001,NMDC STEEL LIMITED, C/o NMDC Iron & Steel Plant, Nagarnar, postbox no.2, Jagdalpur , Dist .Bastar, CG 494001 | Raipur | Chhattisgarh | 494001 | 25 | 43 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
- PAN Card copy
- GSTIN copy
- Cancelled cheque copy
- EFT Mandate copy certified by bank
- Manufacturer test certificates for FRL units
- Invoices (original or digitally signed) for payment
- Any OEM authorization if not manufacturer
- Compliance documents for supply-only scope
Key insights about CHHATTISGARH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, plus manufacturer test certificates for FRL units. The tender requires 100% payment within 30 days after receipt and acceptance and delivery within 6 weeks of PO. Ensure 25% quantity flexibility and accurate invoicing per NSL guidelines.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and manufacturer test certificates for FRL units. OEM authorization is needed if not the manufacturer. Invoices should be original or digitally signed for payment processing within 30 days.
Delivery must be completed within 6 weeks from the Purchase Order date. No advance payment is allowed; payment is released within 30 days after receipt/acceptance. If delays occur, LD is charged at 0.5% per week up to a maximum of 5% of basic value.
The tender details do not disclose an explicit EMD amount in the provided data. Bidders should anticipate standard NMDC practice and confirm at bid submission whether a security deposit or EMD is required and its exact value during the final bid document release.
The scope covers Filter, Regulator, and Lubricator (FRL) units intended for use with Coke oven batteries and Blast furnaces under NSL's central instrumentation department; supply-only obligation with mandatory manufacturer test certificates.
Payment terms specify 100% payment within 30 days against receipt and acceptance of ordered FRL units, with the invoice either original or digitally signed. There is no advance payment under the stated ATC clause.