TenderDekho Logo
Active GEM

NMDC Steel Limited FRL Unit Tender Bastar Chhattisgarh 6 Weeks Delivery 30 Days Payment 2026

Bid Publish Date

29-Aug-2026, 1:49 pm

Bid End Date

08-Sep-2026, 2:00 pm

Progress

Issue29-Aug-2026, 1:49 pm
AwardPending

Key Highlights

  • FRL unit for Coke oven batteries and Blast furnace procurement at NSL
  • 6-week delivery period from PO; 25% quantity flex with extension rules
  • 100% payment within 30 days of receipt and acceptance; no advance payment
  • Manufacturer test certificates mandatory for inspection

Tender Overview

NMDC Steel Limited invites bids for the supply of FRL units (Filter, Regulator, and Lubricator) intended for Coke oven batteries and blast furnaces at NSL facilities. The procurement is located in BASTAR, CHHATTISGARH (494001), with an estimated value not disclosed. The scope is limited to the supply of Goods only, with the option to increase quantity by up to 25% during contract execution. A 6-week delivery period from PO date is mandated. Bidders should note the 100% payment in 30 days post receipt and acceptance, excluding GST. Unique conditions include required manufacturer test certificates and a structured extension mechanism for quantity variations. This tender emphasizes strict adherence to delivery timelines and post-delivery documentation, while maintaining flexibility for batch size adjustments within contractual limits.

Technical Specifications & Requirements

  • Product: FRL unit (Filter, Regulator, Lubricator) for Coke oven batteries and Blast furnace (NSL).
  • Delivery Period: 6 weeks from PO date.
  • Payment Terms: 100% payment with applicable taxes within 30 days after receipt and acceptance of ordered items, on submission of original or digitally signed invoices.
  • Documentation: Test Certificate from manufacturer required for inspection; scope is supply of goods only.
  • Quantity Flexibility: Option to increase/decrease quantity up to 25% of bid/contract quantity during execution.
  • Location/Context: NSL Coke oven batteries and Blast furnace instrumentation section; delivery to Central instrumentation department.
  • ATC/Clauses: No advance payment; penalties for delay apply per contract terms.

Terms, Conditions & Eligibility

  • Delivery Clause: 6 weeks from PO; option to adjust due to quantity changes as per clause.
  • Payment: 100% payment within 30 days on receipt & acceptance; no advance payment.
  • Penalties: Liquidated damages at 0.5% per week of basic order value (excluding GST) for delays, capped at 5%.
  • Documentation to Submit: PAN, GSTIN, Cancelled cheque, EFT Mandate; vendor code creation requirements apply.
  • Test Certificates: Mandatory manufacturer test certificates for inspection.
  • Scope: Only supply of FRL units; installation/commissioning not specified as part of scope.
  • Delivery Terms: Deliver to NSL central instrumentation department; adherence to PTAs and BIS/IS standards, if specified later.

Key Specifications

    • Product name: FRL unit (Filter, Regulator, Lubricator) for Coke oven batteries and Blast furnace
    • Delivery period: 6 Weeks from Purchase Order date
    • Payment terms: 100% within 30 days of receipt and acceptance
    • Documentation: Test Certificate from manufacturer required for inspection
    • Quantity adjustment: Up to 25% increase/decrease during contract execution

Terms & Conditions

  • Delivery within 6 weeks from PO date with no advance payment

  • 100% payment within 30 days after receipt/acceptance

  • Penalty for delays: 0.5% weekly up to 5% of basic order value

Important Clauses

Payment Terms

100% payment within 30 days on receipt and acceptance; no advance payment.

Delivery Schedule

Delivery to NSL central instrumentation department within 6 weeks of PO.

Penalties/Liquidated Damages

0.5% of basic order value per week of delay, max 5% excluding GST.

Bidder Eligibility

  • Manufacturer or authorized supplier for FRL units

  • Ability to provide manufacturer test certificates

  • Compliance to delivery and payment terms as stated

Tender Data

Bid Details

Quantity

25

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Air Filter regulator

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

43

Delivery Locations

1

Delivery Cities

Raipur

Delivery Pincodes

494001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mahendra Raud494001,NMDC STEEL LIMITED, C/o NMDC Iron & Steel Plant, Nagarnar, postbox no.2, Jagdalpur , Dist .Bastar, CG 494001RaipurChhattisgarh4940012543-

Authority Records

MINISTRY OF STEELNMDC STEEL LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9820920.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Nmdc Steel Limited

Office Name

Nmdc Iron Steel Plant Jagdalpur Bastar Cg 494001

Grievance Contact

[email protected]

Categories 7

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

- PAN Card copy

2

- GSTIN copy

3

- Cancelled cheque copy

4

- EFT Mandate copy certified by bank

5

- Manufacturer test certificates for FRL units

6

- Invoices (original or digitally signed) for payment

7

- Any OEM authorization if not manufacturer

8

- Compliance documents for supply-only scope

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for FRL unit tender in Bastar NMDC 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, plus manufacturer test certificates for FRL units. The tender requires 100% payment within 30 days after receipt and acceptance and delivery within 6 weeks of PO. Ensure 25% quantity flexibility and accurate invoicing per NSL guidelines.

What documents are required for NMDC FRL bid in Chhattisgarh

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and manufacturer test certificates for FRL units. OEM authorization is needed if not the manufacturer. Invoices should be original or digitally signed for payment processing within 30 days.

What are the delivery terms for FRL units at NSL

Delivery must be completed within 6 weeks from the Purchase Order date. No advance payment is allowed; payment is released within 30 days after receipt/acceptance. If delays occur, LD is charged at 0.5% per week up to a maximum of 5% of basic value.

What is the EMD or bid security for this NMDC tender

The tender details do not disclose an explicit EMD amount in the provided data. Bidders should anticipate standard NMDC practice and confirm at bid submission whether a security deposit or EMD is required and its exact value during the final bid document release.

Which products are covered under the FRL tender for NSL

The scope covers Filter, Regulator, and Lubricator (FRL) units intended for use with Coke oven batteries and Blast furnaces under NSL's central instrumentation department; supply-only obligation with mandatory manufacturer test certificates.

What are the payment terms for NMDC FRL procurement 2026

Payment terms specify 100% payment within 30 days against receipt and acceptance of ordered FRL units, with the invoice either original or digitally signed. There is no advance payment under the stated ATC clause.