TenderDekho Logo
Closed GEM

UP Cooperative Sugar Factories Federation Limited Line Matrix Printer Tender Lucknow Uttar Pradesh 2026 ISO 9001 Certified

Bid Publish Date

08-Mar-2026, 7:55 pm

Bid End Date

18-Mar-2026, 8:00 pm

EMD

₹15,000

Progress

Issue08-Mar-2026, 7:55 pm
AwardPending

Tender Overview

The Uttar Pradesh Cooperative Sugar Factories Federation Limited, based in Lucknow, Uttar Pradesh, invites bids for a Line Matrix Printer. The procurement scope centers on a standard line matrix printing solution with on-site OEM warranty. The tender specifies an EMD of ₹15,000 and requires OEM or OEM-certified installation resources. The contract contemplates flexible quantity management up to 25% in both initial and during the contract, with delivery timelines tied to original and extended periods. This opportunity is positioned for suppliers with strong technical capabilities and ISO 9001 accreditation, targeting bidders with compliant turnover and OEM support structures.

Technical Specifications & Requirements

  • Type of Line Matrix Printer: Line Matrix Printer (ungraded category).
  • Print Speed: Standard Line Matrix Printer in High Speed Draft Mode (Upper Case) measured as lines per minute.
  • HD Print Speed: Print speed at 180 x 180 dpi for High Definition LMP (inches per minute).
  • Print Width: Defined as the number of columns (print width).
  • On Site OEM Warranty: Warranty duration to be offered by the OEM.
  • Additional context: No BOQ items listed; emphasis on basic LMP capability and post-sale support.

Terms, Conditions & Eligibility

  • EMD: ₹15,000. Bidders must submit EMD as specified in tender documents.
  • Turnover criteria: Minimum average annual turnover over the last three financial years; exact figure to be as per bid document; CA certificate or audited balance sheets acceptable.
  • OEM Turnover: OEM must meet the minimum average turnover for offered products over the last three years; documentation via audited statements or CA certificate.
  • ISO 9001: Bidder or OEM must hold ISO 9001 certification.
  • Installation & Training: Installation, commissioning, testing, and training to be conducted by OEM or OEM-certified resource.
  • Delivery & Quantity Flexibility: Purchaser may increase/decrease quantity by up to 25%; delivery time recalculated based on extended quantity rules with minimum 30 days.
  • Delivery Terms: Compliant with standard procurement terms; payment terms to be as per contract.
  • BOQ: No items listed in the current BOQ; focus on core printer capability and serviceability.

Key Specifications

  • Line Matrix Printer with on-site OEM warranty

  • Print speed: High Speed Draft Mode (Upper Case) in LMP

  • HD print speed at 180 x 180 dpi

  • Print width defined by column capacity

  • OEM installation/commissioning and training by OEM or authorized resellers

  • ISO 9001 certification for bidder or OEM

Terms & Conditions

  • EMD of ₹15,000 and turnover proof required

  • ISO 9001 certification mandatory for bidder or OEM

  • OEM installation/training by OEM-certified personnel

Important Clauses

Payment Terms

To be defined in contract; aligns with standard government procurement; advancement against delivery not specified in available data.

Delivery Schedule

Delivery period may be extended by the option clause; minimum extension time 30 days; quantity variation up to 25%.

Penalties/Liquidated Damages

Penalties or LD details are not specified in the provided data; expected to be defined in the final tender terms.

Bidder Eligibility

  • Minimum average turnover over last 3 years as per bid document

  • ISO 9001 certification (bidder or OEM)

  • OEM authorization/agency agreement for installation and servicing

Advertisement

Authority & Contact

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

170 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

15

Past Performance

40 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

line matrix printer (Q2)

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9093767.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years or CA certificate indicating turnover

4

EMD submission proof (DD or online payment receipt)

5

Technical bid documents clearly describing Line Matrix Printer specifications

6

OEM authorization letter or OEM-certified reseller agreement

7

ISO 9001 certificate (bidder or OEM)

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Ungrouped Type of Line Matrix Printer Standard
Ungrouped Print Speed of Standard LMP ( High Speed Draft Mode, Upper Case ) (Lines per minute) 500
Ungrouped Print Speed at 180 x 180 dpi ( For High Definition LMP) (Inches per minute) NA
Ungrouped Print Width (Column) (Number) 136
Ungrouped On Site OEM Warranty (Years) 1

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for a line matrix printer tender in Lucknow?

Bidders must submit GST, PAN, three-year turnover proof, EMD ₹15,000, and ISO 9001 certification. Include OEM authorization and technical specs for the LMP model. Ensure installation by OEM-certified personnel and accept 25% quantity variation per contract terms. Prepare turnover certificates from CA or audited statements.

What documents are required for the Lucknow LMP procurement?

Required documents include GST registration, PAN, audited financials or CA turnover certificate for last 3 years, EMD proof of ₹15,000, technical bid detailing LMP specifications, OEM authorization, and ISO 9001 certificate for bidder or OEM. Ensure these are uploaded with the bid submission.

What are the technical specifications for the line matrix printer?

Look for an LMP with standard and high-definition modes: High Speed Draft print mode (uppercase) and HD speed at 180 x 180 dpi; print width defined by column capacity; on-site OEM warranty; installation and training by OEM-certified resources.

When is the delivery period for the line matrix printer?

Delivery terms permit extension under the option clause; additional time equals (increased quantity ÷ original quantity) × original delivery period with a minimum of 30 days. The purchaser may extend up to the original delivery period during exercises of the option.

What is the EMD amount for the LMP tender in Lucknow?

The EMD amount is ₹15,000. Bid submissions must include evidence of payment (DD or online) per tender requirements, alongside GST, PAN, and turnover documentation.

What eligibility criteria relate to ISO 9001 for this procurement?

Bidder or OEM must hold ISO 9001 certification. If the bidder does not own it, the OEM must provide ISO 9001 documentation. Turnover proof from last three years is required, and agency authorization for OEM installation may be necessary.

What installation and training requirements apply to this LMP tender?

Installation, commissioning, testing, and training must be performed by the OEM or an OEM-certified resource or authorized reseller. Documentation should confirm access to trained technicians and on-site support as part of the delivery package.

What is the scope of quantity variation allowed under this contract?

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during currency at contracted rates, with delivery time recalculated accordingly and a minimum extension of 30 days.