TenderDekho Logo
GEM

Open Tender for Modular N plus 1 UPS,Battery bank for 10 KVA modular N Plus 1 UPS,Metalic rack,Wiring work for modu in JALGAON, MAHARASHTRA

Bid Publish Date

15-Oct-2025, 5:12 pm

Bid End Date

03-Nov-2025, 4:00 pm

EMD

₹33,238

Value

₹24,15,896

Progress

Issue15-Oct-2025, 5:12 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

208

Category

Modular N plus 1 UPS

Bid Type

Two Packet Bid

Categories 26

A tender has been published for Airports Authority Of India Modular N plus 1 UPS, Battery bank for 10 KVA modular N Plus 1 UPS, Metalic rack, Wiring work for modular UPS, Power Cable for one 10 KVA N Plus 1 modular UPS, Data cable for one 10 KVA N plus 1 modular UPS, ITC work for one 10 KVA N Plus 1 modular UPS along with SPD, I year Onsite CAMC, II year Onsite CAMC, III year Onsite CAMC, IV year Onsite CAMC, V year Onsite CAMC, Conventional UPS in hot standby configuration one plus one, Battery bank for all three set of 03 KVA conventional UPS, Internal or External Automatic Transfer Switch for 03 KVA UPS, Wiring work for all 03 KVA UPS, Power cable for three set 03 KVA UPS one plus one, Data cable for three set 03 KVA UPS one plus one, ITC work for three set 03 KVA UPS one plus one along with SPD and Automatic transfer switch in JALGAON, MAHARASHTRA. Quantity: 208 by. Submission Deadline: 03-11-2025 16: 00: 00. Check eligibility and apply.

Documents 5

GeM-Bidding-8462309.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

10 KVA N Plus 1 Modular UPS 3 phase input and single phase output as per Technical Specification wi

Airports Authority Of India

SURAT, GUJARAT

Posted: 27 February 2025
Closed: 14 March 2025
GEM

20 KVA Modular UPS with 03 years onsite warranty,Battery bank for 20 KVA modular UPS,Integrated Bat

Airports Authority Of India

GULBARGA, KARNATAKA

Posted: 4 May 2025
Closed: 26 May 2025
GEM

SUPPLY AND INSTALLATION OF 30KVA UPS RAT FOR BARAUNI IRD,42 AH 12V SMF VRLA BATTERIES FOR BARAUNI I

Hindustan Petroleum Corporation Ltd

Posted: 28 January 2025
Closed: 14 February 2025
GEM

Procurement of 2 x 20 KVA UPS and battery bank for Uran plant SES along with CAMC

Oil And Natural Gas Corporation Limited

RAIGAD, MAHARASHTRA

Posted: 26 August 2025
Closed: 23 September 2025
GEM

Customized AMC/CMC for Pre-owned Products - CAMC for Power one make 20 KVA UPS unit including batte

Aeronautical Development Agency

BANGALORE, KARNATAKA

Posted: 16 December 2024
Closed: 6 January 2025
GEM

Bill of Quantities (BOQ) 24 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Modular N plus 1 UPS 10 KVA (N+ 1) Modular UPS 3 phase input & single phase output as per Technical Specification with warranty of three year 1 pieces shubham.pk 30
2 Battery bank for 10 KVA modular N Plus 1 UPS Battery Bank for 10 KVA UPS as per Technical Specification with warranty of 02 year 2 pieces shubham.pk 30
3 Metalic rack Standard battery rack having covered metalic top for one 10 KVA (N+1) modular UPS battery set 2 pieces shubham.pk 30
4 Wiring work for modular UPS Wiring (Full wiring of all UPS i.e from I/P DB to UPS, UPS to O/P DB ) 1 job shubham.pk 30
5 Power Cable for one 10 KVA N Plus 1 modular UPS 10 Sq mm 3C Power cables (ISI Standard) 10 meter shubham.pk 30
6 Power Cable for one 10 KVA N Plus 1 modular UPS 16 Sq mm 5C Power cables (ISI Standard) 10 meter shubham.pk 30
7 Data cable for one 10 KVA N plus 1 modular UPS Cat6 UTP Cable 20 meter shubham.pk 30
8 ITC work for one 10 KVA N Plus 1 modular UPS along with SPD INSTALLATION,TESTING COMMISSIONING, Provide TRAINING AND DOCUMENTATION AS PER SCOPE 1 job shubham.pk 30
9 I year Onsite CAMC I year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period. 1 job shubham.pk 30
10 II year Onsite CAMC II year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period. 1 job shubham.pk 30
11 III year Onsite CAMC III year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period 1 job shubham.pk 30
12 IV year Onsite CAMC IV year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period 1 job shubham.pk 30
13 V year Onsite CAMC V year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period. 1 job shubham.pk 30
14 Conventional UPS in hot standby configuration one plus one 03 KVA online UPS Single phase input and Single Phase output as per Technical Specification with warranty of 03 year (Two sets of UPS with hotstand by configuration) 6 pieces shubham.pk 30
15 Battery bank for all three set of 03 KVA conventional UPS Battery Bank for 03 KVA UPS as per Technical Specification 6 pieces shubham.pk 30
16 Metalic rack Standard battery rack having covered metalic top for all three 03 KVA UPS (two set of UPS) 6 pieces shubham.pk 30
17 Internal or External Automatic Transfer Switch for 03 KVA UPS Automatic Transfer Switch (internal or external ) for 03 KVA UPS 3 pieces shubham.pk 30
18 Wiring work for all 03 KVA UPS Wiring (Full wiring of all UPS i.e from I/P DB to UPS, UPS to O/P DB ) 1 job shubham.pk 30
19 Power cable for three set 03 KVA UPS one plus one 10 Sq mm 3C Power cables (ISI Standard) 40 meter shubham.pk 30
20 Data cable for three set 03 KVA UPS one plus one Cat6 UTP Cable 90 meter shubham.pk 30
21 ITC work for three set 03 KVA UPS one plus one along with SPD and Automatic transfer switch INSTALLATION,TESTING COMMISSIONING ,DOCUMENTATION AND TRAINING AS PER SCOPE 1 job shubham.pk 30
22 I year Onsite CAMC I year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period. 1 job shubham.pk 30
23 II year Onsite CAMC II year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period. 1 job shubham.pk 30
24 III year Onsite CAMC III year Onsite CAMC Charges of Complete UPS system and associated System (without Battery) after completion of Warranty period 1 job shubham.pk 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer