Progress
Hindustan Aeronautics Limited (HAL), operating under the Department Of Defence Production, invites bids for a CNC VERTICAL MILLING MACHINE. The tender lacks BOQ items and does not disclose start/end dates or estimated value. The procurement is governed by a Buyer uploaded ATC document, indicating there are organization-specific terms. The lack of a defined location in the data requires bidders to verify site details with HAL. The unique factor here is the explicit inclusion of a vendor-specific ATC, which may alter standard submission formats and compliance checks. Bidders should prepare to align with HAL’s internal buying clauses and potential OEM/brand considerations within the ATC.
Product: CNC VERTICAL MILLING MACHINE
BOQ: 0 items listed; rely on ATC for detailed specs
EMD/Estimated value: Not disclosed in data; verify in ATC
Delivery/Installation: Not disclosed; confirm scope in ATC
Experience: Not specified; check ATC for vendor eligibility
Standards/Certification: Not specified; obtain from ATC
ATC governs bid terms and submission requirements
No listed BOQ; exact specifications must be sourced from ATC
EMD, payment terms, delivery timeline require HAL-ATC confirmation
Details to be extracted from the ATC; bidders must verify applicable payment schedule and documentation
Delivery timelines to be defined in ATC; bidders should prepare installation and commissioning details as per HAL requirements
LD/penalties to be confirmed in ATC; bidders should review for potential performance bonds
Experience in supplying CNC milling machines or similar vertical milling equipment
Compliance with HAL and Defence Production procurement processes
Ability to furnish OEM authorizations and after-sales support as per ATC
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CNC VERTICAL MILLING MACHINE
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
610
Delivery Locations
1
Delivery Cities
Tumkur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tumkur | Tumkur | - | - | 1 | 610 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates relevant to CNC milling machines
Financial statements (last 2-3 years)
EMD/Security deposit documents (as specified in ATC)
Technical bid documents as per ATC
OEM authorization letters (if required by HAL ATC)
Any other documents specified in the Buyer uploaded ATC
Key insights about KARNATAKA tender market
Bidders must obtain the exact scope from the Buyer uploaded ATC, ensure GST and PAN are valid, and submit Technical and Financial bids per HAL procurement rules. Include OEM authorizations if required and ensure compliance with any IS/ISO standards stated in ATC.
Prepare GST certificate, PAN card, experience certificates for milling machines, recent financial statements, EMD documents, technical compliance, and OEM authorizations if mandated by the ATC. All documents must align with HAL's ATC specifications and submission format.
Specific CNC milling machine specs are not published in the data; bidders must refer to the ATC. Expect details on spindle speed, travel, axes, control system, and mounting standards as per HAL requirements and any defence production guidelines.
Delivery timeline is not disclosed in the provided data. Verify the exact delivery schedule in the ATC and tender communications, including installation and commissioning milestones as required by HAL under Defence Production.
EMD amount is not specified in the available data. Check the ATC for the exact EMD figure, acceptable payment method, and submission deadline to ensure compliance with HAL procurement norms.
Access the Buyer uploaded ATC document through the tender portal. Review compliance criteria, brand/OEM restrictions, delivery/installation obligations, warranty terms, and any special clauses unique to HAL's Defence Production procurement.
ATC will specify warranty and AMC expectations. Prepare for on-site service, spares availability, calibration, and training commitments as per HAL’s Defence Production terms; confirm response times and service windows within ATC.
Standards will be listed in the ATC; bidders should anticipate compliance with manufacturing and safety norms relevant to defence procurement, including potential IS/ISO requirements and OEM certifications as mandated by HAL.