TenderDekho Logo
Active GEM

Contract Bidding Open For Networking Access Switch with 24 port,Networking Access Switch with 48,Networking Distribution Swit in CHITTORGARH, RAJASTHAN

Bid Publish Date

24-Sep-2026, 2:46 pm

Bid End Date

30-Oct-2026, 11:00 am

Generate Docs

Progress

Issue24-Sep-2026, 2:46 pm
Corrigendum15-Oct-2026
AwardPending

Nuclear Power Corporation Of India Limited announces a tender for Networking Access Switch with 24 port, Networking Access Switch with 48, Networking Distribution Switch with 48, Networking Core Switch with 32 No, 24 Core Single Mode Armored Outdoor Optical fiber Cable. , Fully loaded 24 Core Rack Mountable LIU, LC-LC Duplex Fiber Patch Cord. , CAT 6A UTP Cable 305 mtr. Roll in a Box packing. , Cat 6A 24 Port UTP Black Colour Patch Panel Loaded, Cat 6A Information Outlet including CAT 6A Face Plate And Surface Mount Box for Face Plate. , Cat 6A Patch Chord 1 meter, Cat 6A Patch Chord 3 meter, PVC Rigid cable channel with slots And with cover. , 15 U Wall Mount rack along with all accessories with Top and Bottom panels. , 1 Inch PVC Casing Caping including screw, wall plug. , 3 Inch PVC Casing including screw, wall plug. , 2-inch Metal Flexible Pipe. , HDPE pipe size of 50 mm. , 5 Inch GI Pipe. , Installation and Configuration of Network Switches core, distribution and access switches and integrated with existing network, Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe, Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe in existing cable trench, Splicing of optical Fiber cable and dressing in patch panel as per core. , UTP termination And marking on patch panel And information outlets. , Laying of casing caping from rack to Information Outlet Positions. , Laying of CAT 6 UTP Cable in casing caping from rack to Information Outlet Positions. , Installation of racks including rack Switch configuration mounting of Switches, UTP Patch Panel, termination etc. , Testing and Documentation of UTP nodes using Pentascan Fluke or other equivalent network testing tools. , Testing of 24 Core Optical Fibre Cable segment by OTDR And Documentation. in CHITTORGARH, RAJASTHAN. Quantity: 161764. Submission Deadline: 30-10-2026 11: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

161764

Category

Networking Access Switch with 24 port

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Networking Access Switch with 24 port , Networking Access Switch with 48 , Networking Distribution Switch with 48 , Networking Core Switch with 32 No , 24 Core Single Mode Armored Outdoor Optical fiber Cable. , Fully loaded 24 Core Rack Mountable LIU , LC-LC Duplex Fiber Patch Cord. , CAT 6A UTP Cable 305 mtr. Roll in a Box packing. , Cat 6A 24 Port UTP Black Colour Patch Panel Loaded , Cat 6A Information Outlet including CAT 6A Face Plate And Surface Mount Box for Face Plate. , Cat 6A Patch Chord 1 meter , Cat 6A Patch Chord 3 meter , PVC Rigid cable channel with slots And with cover. , 15 U Wall Mount rack along with all accessories with Top and Bottom panels. , 1 Inch PVC Casing Caping including screw, wall plug. , 3 Inch PVC Casing including screw, wall plug. , 2-inch Metal Flexible Pipe. , HDPE pipe size of 50 mm. , 5 Inch GI Pipe. , Installation and Configuration of Network Switches core, distribution and access switches and integrated with existing network , Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe , Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe in existing cable trench , Splicing of optical Fiber cable and dressing in patch panel as per core. , UTP termination And marking on patch panel And information outlets. , Laying of casing caping from rack to Information Outlet Positions. , Laying of CAT 6 UTP Cable in casing caping from rack to Information Outlet Positions. , Installation of racks including rack Switch configuration mounting of Switches, UTP Patch Panel, termination etc. , Testing and Documentation of UTP nodes using Pentascan Fluke or other equivalent network testing tools. , Testing of 24 Core Optical Fibre Cable segment by OTDR And Documentation.

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

35

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

270

Delivery Locations

1

Delivery Cities

Chittorgarh

Delivery Pincodes

323303

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Gyan Mal Khatik323303,Contracts & Material Management, NPCIL, Rawatbhata Rajasthan Site, Anushakti Via-Kota (Rajasthan) Phone No. 01475-242002, 242048 Which is about 60 Kms. away from Kota.ChittorgarhRajasthan32330345270-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9864554.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Nuclear Power Corporation Of India Limited

Office Name

Rajasthan

Ministry

PMO

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

15-Oct-2026

Extended Deadline

30-Oct-2026, 5:30 am

Opening Date

31-Oct-2026, 5:30 am

Advertisement

Bill of Quantities (BOQ) 29 Items Sign in for GEM prices

#1

Networking Access Switch with 24 port

Networking Access Switch with 24 port Ethernet 10/100/1000 Base-Tx ports. (Detail specification as per attached Annexure-III)

45 nos Delivery: 270 days
#2

Networking Access Switch with 48

Networking Access Switch with 48 port Ethernet 10/100/1000 Base-Tx ports. (Detail specification as per attached Annexure-III)

65 nos Delivery: 270 days
#3

Networking Distribution Switch with 48

Networking Distribution Switch with 48 port Ethernet 10/100/1000 Base-Tx ports. (Detail specification as per attached Annexure-III)

8 nos Delivery: 270 days
#4

Networking Core Switch with 32 No

Networking Core Switch with 32 No of 40G/100G QSFP+ Ports. (Detail specification as per attached Annexure-III)

2 nos Delivery: 270 days
#5

24 Core Single Mode Armored Outdoor Optical fiber Cable.

24 Core Single Mode (OS2) Armored Outdoor Optical fiber Cable. (Detail specification as per attached Annexure-III)

17,500 meters Delivery: 270 days
#6

Fully loaded 24 Core Rack Mountable LIU

Fully loaded 24 Core Rack Mountable LIU (Line Interface Unit) with Duplex LC adaptors & LC pigtails. (Detail specification as per attached Annexure-III)

70 nos Delivery: 270 days
#7

LC-LC Duplex Fiber Patch Cord.

LC-LC Duplex Fiber Patch Cord. (Detail specification as per attached Annexure-III)

96 nos Delivery: 270 days
#8

CAT 6A UTP Cable 305 mtr. Roll in a Box packing.

CAT 6A UTP Cable (305 mtr. Roll in a Box packing). (Detail specification as per attached Annexure-III)

175 box Delivery: 270 days
#9

Cat 6A 24 Port UTP Black Colour Patch Panel Loaded

Cat 6A 24 Port UTP Black Colour Patch Panel Loaded with I/O Jack. (Detail specification as per attached Annexure-III)

50 nos Delivery: 270 days
#10

Cat 6A Information Outlet including CAT 6A Face Plate And Surface Mount Box for Face Plate.

Cat 6A Information Outlet including CAT 6A Face Plate & Surface Mount Box for Face Plate. (Detail specification as per attached Annexure-III)

974 nos Delivery: 270 days
#11

Cat 6A Patch Chord 1 meter

Cat 6A Patch Chord (1 meter). (Detail specification as per attached Annexure-III)

974 nos Delivery: 270 days
#12

Cat 6A Patch Chord 3 meter

Cat 6A Patch Chord (3 meter). (Detail specification as per attached Annexure-III)

400 nos Delivery: 270 days
#13

PVC Rigid cable channel with slots And with cover.

PVC Rigid cable channel with slots & with cover. (Detail specification as per attached Annexure-III)

300 meters Delivery: 270 days
#14

15 U Wall Mount rack along with all accessories with Top and Bottom panels.

15 U Wall Mount rack along with all accessories with Top and Bottom panels. (Detail specification as per attached Annexure-III)

40 no Delivery: 270 days
#15

1 Inch PVC Casing Caping including screw, wall plug.

1 Inch PVC Casing Caping including screw, wall plug. (Detail specification as per attached Annexure-III)

8,000 meters Delivery: 270 days
#16

3 Inch PVC Casing including screw, wall plug.

3 Inch PVC Casing including screw, wall plug. (Detail specification as per attached Annexure-III)

17,000 meters Delivery: 270 days
#17

2-inch Metal Flexible Pipe.

2-inch Metal Flexible Pipe. (Detail specification as per attached Annexure-III)

1,000 meters Delivery: 270 days
#18

HDPE pipe size of 50 mm.

HDPE pipe size of 50 mm. (Detail specification as per attached Annexure-III)

14,000 meters Delivery: 270 days
#19

5 Inch GI Pipe.

5 Inch GI Pipe. (Detail specification as per attached Annexure-III)

10 nos Delivery: 270 days
#20

Installation and Configuration of Network Switches core, distribution and access switches and integrated with existing network

Installation and Configuration of Network Switches (core, distribution and access switches) and integrated with existing network (with VLAN, ACL). (Detail specification as per attached Annexure-III)

120 nos Delivery: 270 days
#21

Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe

Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe. (Detail specification as per attached Annexure-III)

14,000 meters Delivery: 270 days
#22

Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe in existing cable trench

Turnkey job of laying of PLB Pipe with Laying of Optical Fibre cable in the PLB Pipe in existing cable trench / cable tray / Clamping on wall. (Detail specification as per attached Annexure-III)

3,500 meters Delivery: 270 days
#23

Splicing of optical Fiber cable and dressing in patch panel as per core.

Splicing of optical Fiber cable and dressing in patch panel as per core. (Detail specification as per attached Annexure-III)

1,536 core Delivery: 270 days
#24

UTP termination And marking on patch panel And information outlets.

UTP termination & marking on patch panel & information outlets. (Detail specification as per attached Annexure-III)

974 nos Delivery: 270 days
#25

Laying of casing caping from rack to Information Outlet Positions.

Laying of casing caping from rack to Information Outlet Positions. (Detail specification as per attached Annexure-III)

25,000 meters Delivery: 270 days
#26

Laying of CAT 6 UTP Cable in casing caping from rack to Information Outlet Positions.

Laying of CAT 6 UTP Cable in casing caping from rack to Information Outlet Positions. (Detail specification as per attached Annexure-III)

53,375 meters Delivery: 270 days
#27

Installation of racks including rack Switch configuration mounting of Switches, UTP Patch Panel, termination etc.

Installation of racks including rack Switch configuration mounting of Switches, UTP Patch Panel, termination etc. with marking/ tagging of each port corresponding to I/O port and proper cable dressing. (Detail specification as per attached Annexure-III)

40 nos Delivery: 270 days
#28

Testing and Documentation of UTP nodes using Pentascan Fluke or other equivalent network testing tools.

Testing and Documentation of UTP nodes using Pentascan /Fluke or other equivalent network testing tools. (Detail specification as per attached Annexure-III)

974 nos Delivery: 270 days
#29

Testing of 24 Core Optical Fibre Cable segment by OTDR And Documentation.

Testing of 24 Core Optical Fibre Cable segment by OTDR & Documentation. (Detail specification as per attached Annexure-III)

1,536 core Delivery: 270 days

Categories 38

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Additional Doc 1 (Requested in ATC)

2

Additional Doc 2 (Requested in ATC)

3

Additional Doc 3 (Requested in ATC)

4

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement