TenderDekho Logo
Active GEM

Bokaro Steel Plant Transformer Oil W/O Oxidation Inhibitor Tender Jharkhand 2026

Bid Publish Date

05-Oct-2026, 10:38 am

Bid End Date

26-Oct-2026, 11:00 am

Progress

Issue05-Oct-2026, 10:38 am
AwardPending

Tender Overview

Organization: Bokaro Steel Plant (Steel Authority of India Limited). Product: Transformer Oil W/O Oxidation Inhibitor required for downstream electrical insulation needs. Delivery window: within 180 days from PO date. Location: Bokaro, Jharkhand (BSL Stores). Scope: supply-only contract with delivery terms to BSL Stores; data sheet must accompany bid to verify parameters; manufacturer authorization required for distributors. Tender includes 12-month warranty from date of use or 18 months from delivery, whichever comes first. Payment terms specify 100% against GRN. Key differentiator: strict post-receipt inspection by BSL, with FOR delivery. This tender emphasizes compliance with the TS data sheet and OEM authorization.

Technical Specifications & Requirements

  • Delivery period: 180 days from PO date.
  • Warranty: 12 months from date of use or 18 months from delivery (whichever earlier).
  • Scope of supply: Supply of Goods to BSL Stores; unloading at destination handled by BSL.
  • Inspection: Post Receipt Inspection at consignee site by BSL Inspection department.
  • Data Sheet: Mandatory Data Sheet upload; ensure consistency with product offered.
  • Manufacturer Authorization: Required for authorised distributors; include OEM details.
  • ATC terms: Quantity may be adjusted up to 25% during or after contract; delivery extension rules apply.
  • GST: Bidder to determine GST; reimbursement as per actuals or applicable rate, max quoted GST.

Terms, Conditions & Eligibility

  • Delivery: 180 days from PO date; FOR BSL Stores.
  • Payment: 100% against GRN.
  • Inspection: Post Receipt Inspection at consignee site; pre-dispatch waived.
  • Data Sheet: Upload data sheet; ensure alignment with bid parameters.
  • MA/Authorization: Manufacturer Authorization required for distributors with OEM details.
  • Item scope: Supply of Goods only; unloading by BSL at stores.
  • GST: Determine applicable GST; reimbursement as per actuals or lower rate per quoted GST.
  • Delivery terms flexibility: Option clause allows up to 25% quantity variation; extension rules defined.

Key Specifications

  • Product/service: Transformer Oil W/O Oxidation Inhibitor

  • Delivery: 180 days from PO date

  • Warranty: 12 months from date of use or 18 months from delivery

  • Payment: 100% against GRN

  • Inspection: Post Receipt Inspection at BSL site

  • Delivery term: FOR BSL Stores

  • Data Sheet: Mandatory upload with bid

  • Manufacturer Authorization: Required for distributors

Terms & Conditions

  • Delivery within 180 days from PO date with FOR BSL Stores

  • 100% payment against GRN; GST paid as actual or quoted rate

  • Post-receipt inspection by BSL; data sheet alignment mandatory

Important Clauses

Delivery Schedule

Supply must reach BSL Stores within 180 days from PO date; option to extend under 25% quantity variation rules.

Payment Terms

100% payment against GRN; GST treatment as actuals or as per applicable rate, whichever is lower, within quoted GST.

Warranty & Guarantee

Warranty valid for 12 months from date of use or 18 months from delivery, whichever is earlier.

Bidder Eligibility

  • Experience in supplying transformer oil or similar insulating oils

  • Turnover and financial capability to support supply of bulk lubricant oils

  • Authorized OEM/Manufacturer Authorization for distributors must be provided

Advertisement

Tender Data

Bid Details

Quantity

80000

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

TRANSFORMER OIL W/O OXIDATION INHIBITOR

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Bokaro

Delivery Pincodes

827001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajkaran Singh827001,DGM(Stores), Stores Department, Steel Gate, Gate No.-9, Bokaro Steel Plant, Bokaro Steel City-827001, JharkhandBokaroJharkhand82700180000180-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9970828.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bokaro Steel Plant

Office Name

Bslp61

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for transformer oil supply

4

Financial statements / turnover proof

5

EMD documents (if applicable) and payment proof

6

Technical bid documents and Data Sheet

7

OEM authorization / Manufacturer Authorization for distributors

8

Insurance certificates (if requested in ATC)

9

Any prior inspection reports or quality certificates

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid in Bokaro transformer oil tender in Jharkhand 2026

Bidders should prepare a Data Sheet, obtain Manufacturer Authorization for distributors, and submit GST, PAN, and experience certificates. The contract requires 180 days delivery, 100% payment against GRN, and post-receipt inspection by BSL. Ensure data sheet aligns with offered product and include OEM details.

What documents are required for transformer oil tender submission in Bokaro

Required documents include GST certificate, PAN, experience certificates for transformer oil supply, financial statements, EMD proof if applicable, Data Sheet, OEM authorization, and proof of authorized distributor status. Also include post-dispatch inspection acceptance plan and FOR delivery confirmation.

What are the delivery terms for transformer oil supply to BSL Stores

Delivery must be completed within 180 days from PO date, FOR BSL Stores, unloading to be handled by BSL. If quantity varies up to 25%, delivery time adjusts proportionally with a minimum of 30 days.

What is the payment term for Bokaro transformer oil procurement

Payment is 100% against GRN after delivery and acceptance. GST will be reimbursed at actuals or the lower applicable rate, limited to quoted GST percentage, per ATC terms.

Which verification steps exist before acceptance of transformer oil at BSL

Post-receipt inspection by BSL is mandated before acceptance; pre-dispatch inspection is waived. Data Sheet will be cross-checked against delivered product to ensure parameter alignment.

What are the warranty terms for transformer oil supplied to Bokaro Steel Plant

Warranty covers 12 months from date of use or 18 months from delivery, whichever occurs earlier, ensuring product quality and performance during service life.

How does the 25% option clause affect transformer oil quantity

Contract allows +/-25% quantity variation during/after award. Any extension of delivery time will be calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.

What standards or authorizations are required for distributor bids

Distributors must submit OEM authorization/certificates, indicating manufacturer details (name, designation, address, contact). This ensures compliance with TS data sheet and product specifications for transformer oil.