TenderDekho Logo
Closed GEM

Indian Army Procurement Pune Maharashtra Electrical & Hardware Goods ISI/BIS Compliant 2026

Bid Publish Date

19-Sep-2026, 7:02 pm

Bid End Date

29-Sep-2026, 8:00 pm

Progress

RA
Issue19-Sep-2026, 7:02 pm
Reverse AuctionCompleted
AwardCompleted

Tender Overview

The Indian Army, Department Of Military Affairs, inviting tenders for a broad range of electrical and hardware products in Pune, Maharashtra (410301). Items include copper alloy taps/valves (IS 8931 Q3), towel rails, PVC insulated copper cables (IS 694 Q2), ISI-marked PVC tapes (IS 7809 Part 3 Sec1 Q2), LED battens and luminaires (IS 10322 Part 5 Sec5, BIS Scheme II Q2), glass shelves, ply wood, CP health faucet, brass gate valves, GI and MS fittings, shower components, and various fasteners. Quantity and value not disclosed; emphasis on ISI/BIS conformity and category-specific quality. Bid terms allow quantity variations up to 25% with extended delivery windows. The bid requires vendor and OEM turnover demonstration and documentary evidence.

Key differentiators include ISI/BIS conformity across multiple product lines, a diverse “one-stop” supply scope, and a delivery-flexible framework to accommodate up to 25% quantity adjustments during and post-contract. This procurement supports wide-ranging maintenance, outfitting, and infrastructure needs across Army facilities in Pune and surrounding areas.

Technical Specifications & Requirements

  • Product categories drawn from ISI/BIS standards: IS 8931 (Taps/Stops), IS 694 (PVC insulated cables), IS 7809 (PVC tapes), IS 10322 (LED fixtures), BIS Scheme II (LED luminaires) and miscellaneous fittings (GP fittings, CP fittings, GI/MS hardware).
  • No explicit performance metrics or batch-level specifications provided; tender emphasizes conformance to listed IS/ISI/BIS standards and marked hardware.
  • Packaging and compatibility expectations inferred from typical Army store requirements: standard dimensions, corrosion resistance, and supply chain readiness across 69 line items.
  • Delivery scope limited to “supply of Goods” with option clause allowing 25% quantity variation; OEM turnover criteria apply for primary product category.
  • EMD and exact itemized quantities are not disclosed in the available data.

Terms, Conditions & Eligibility

  • EMD: Not specified in the data provided; bidders must comply with standard EMD requirements per tender rules.
  • Turnover: Minimum average annual financial turnover over last 3 years required; documented via audited balance sheets or CA certificate.
  • OEM Turnover: OEM of the offered product must meet turnover criteria; in case of bunch bids, the OEM of the highest bid value must meet criteria.
  • Delivery: Delivery period linked to original order; option clause allows up to 25% quantity variation with adjusted timelines, minimum 30 days extension.
  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate; various financial and technical documents must be uploaded.
  • Scope: Bid price to include all costs; scope is strictly supply of goods, not installation or commissioning.

Key Specifications

  • IS 8931 compliant copper alloy taps/valves

  • IS 694 standard PVC insulated copper cables (Single Core and Multi Core) circular sheathed

  • IS 7809 Part 3/Sec 1 (PVC tapes) ISI marked

  • LED Batten Light (LED Tube Light) with V2 grading

  • LED Luminaire for Floodlight conforming to IS 10322 Part 5 Section 5 (V3 BIS Scheme II)

  • Glass shelf assemblies and ply wood requirements (600x150 cm; 12mm BWR plywood 8x4 ft)

  • CP Health faucet, CP fittings, CP towel rails; various GI/MS fittings and pipe components

  • Floating valve PVC 25mm, 32mm, 15mm; brass gate valves 15-20mm; GI/MS tubing variants

Terms & Conditions

  • Option clause allows 25% quantity variation at contract award and during currency

  • Delivery period aligns with last delivery order date; minimum extension 30 days

  • Turnover criteria required for bidder and OEM; audited or CA-certified documentation

  • All items must be ISI/BIS marked where applicable; scope is supply-only

  • Documentation: PAN, GST, cancelled cheque, EFT mandate, and financials

Important Clauses

Payment Terms

Not explicitly stated; typical contracts require upfront or milestone payments per delivery and acceptance terms

Delivery Schedule

Delivery period extends from the last date of original delivery order; option clause allows time adjustments proportional to quantity changes

Penalties/Liquidated Damages

Penalties not specified in given data; standard practice applies LDs for late delivery or non-conforming goods per contract

Bidder Eligibility

  • Minimum average annual turnover as per bid document for last 3 financial years

  • OEM turnover compliance for the offered product category

  • Supply of goods only; no installation services included

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1JK Enterprises(MSE)   Under PMA Winner ₹10,17,584Item Categories : Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform
L2RAJINDER ENTERPRISES (MSE)   Under PMA₹10,48,111Item Categories : Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform
L3Preeti Enterprises (MSE)   Under PMA₹11,70,221Item Categories : Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform

🎉 L1 Winner

JK Enterprises(MSE)   Under PMA

Final Price: ₹10,17,584

Reverse Auction Schedule

Completed

Start

02-Oct-2026, 10:00 am

End

03-Oct-2026, 10:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

1503

Category

Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

8

OEM Avg. Turnover

5

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) , Towel Rail (Q3) , PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Rigid Conductor (V2) ISI Marked To IS 694 (Q2) , Plasticized PVC Tapes with Non-Thermosetting Adhesive for electrical purpose (V2) ISI marked to IS 7809 (Part 3/ Sec1) (Q2) , LED Batten Light (LED Tube Light) (V2) (Q2) , LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) , Glass shelf assembly 600 into 150 size , Ply wood commercial BWR 12mm thick 8 feet into 4 feet , Ply wood BWR one side T by F size 6mm thick 8 feet , Float valve PVC 25mm complete , Glass shelf assembly 600 into 150 cm , CP Health faucet , Gate Valve Brass 20mm , CP Pegset 5 hooks , PVC body cabinet Mirror , GI tubing meadium grade 20 mm , Gate Valve Brass 15mm , PVC seat cover for EWC White , GI tubing meadium grade 15 mm , PVC seat cover for EWC white , CP Jet Spray with flexible tube 900mm long , Screw wood Steel 45mm into 8 mm , Screw wood Steel 25 into 6mm , GI Union 20mm dia , PVC connection pipe 15 into 600mm long with che , Shower Rose CP 75mm , GI Union 15mm dia , Screw wood Steel 35 into 8mm , Screw wood Steel 30mm into 8mm , Waste coupling for steel sink , PVC shower Rose 15mm inlieu of PVC Requi , GI Elbow 20mm , Alrabolt aluminum 250mm , Gate Valve CI 20mm , Mixer Spindle with cap 15mm with handle , GI Bend 20mm , PVC waste pipe 32mm , GI Tank Nipple 15mm , Brush painting 50mm , Float valve PVC 15mm complete , GI Socket 25mm , CP Brass Towel ring , PVC connection pipe 15 into 450mm long with che , GI Elbow 25mm , GI Tee Reducings 25 into 15 into 25mm , PVC float valve 20mm with complete set , Stop cock PVC 15mm , CP grating 100mm with hole , Hydraulic Door Closure , GI Socket reducer 25 into 20mm , Hasp and Stapple aluminum 100mm , Pillar cock PVC 15mm complete Fancy Type , GI Socket reducer 20 into 15mm , Cupboard Knob 40mm , PVC Bib tap 15 mm inlieu of PVC Required C , Alrabolt aluminum 200mm , GI Bend 15mm , Tower bolt aluminum 150mm , Butt Hinges MS 75mm , GI Elbow 15mm , PVC Towel rail 600mm , GI Tank Nipple 20mm , GI Socket reducer 25 into 15mm , GI Socket 15mm , Tower bolt aluminum 100mm , GI Socket 20mm , Tower bolt aluminum 200mm , GI Tee Equal 15mm , PVC waste coupling 32mm , GI Tee Equal 20mm , PVC waste coupling 40mm , Butt Hinges MS 100mm

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Pune

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PunePune--1315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9919589.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 69 Items Sign in for GEM prices

#1

Glass shelf assembly 600 into 150 size

As per uploaded specification documents

8 nos Delivery: 15 days
#2

Ply wood commercial BWR 12mm thick 8 feet into 4 feet

As per uploaded specification documents

1 sqft Delivery: 15 days
#3

Ply wood BWR one side T by F size 6mm thick 8 feet

As per uploaded specification documents

1 sqft Delivery: 15 days
#4

Float valve PVC 25mm complete

As per uploaded specification documents

7 nos Delivery: 15 days
#5

Glass shelf assembly 600 into 150 cm

As per uploaded specification documents

3 nos Delivery: 15 days
#6

CP Health faucet

As per uploaded specification documents

30 nos Delivery: 15 days
#7

Gate Valve Brass 20mm

As per uploaded specification documents

3 nos Delivery: 15 days
#8

CP Pegset 5 hooks

As per uploaded specification documents

4 nos Delivery: 15 days
#9

PVC body cabinet Mirror

As per uploaded specification documents

10 nos Delivery: 15 days
#10

GI tubing meadium grade 20 mm

As per uploaded specification documents

7 rm Delivery: 15 days
#11

Gate Valve Brass 15mm

As per uploaded specification documents

3 nos Delivery: 15 days
#12

PVC seat cover for EWC White

As per uploaded specification documents

55 nos Delivery: 15 days
#13

GI tubing meadium grade 15 mm

As per uploaded specification documents

7 rm Delivery: 15 days
#14

PVC seat cover for EWC white

As per uploaded specification documents

5 nos Delivery: 15 days
#15

CP Jet Spray with flexible tube 900mm long

As per uploaded specification documents

5 nos Delivery: 15 days
#16

Screw wood Steel 45mm into 8 mm

As per uploaded specification documents

2 pkt Delivery: 15 days
#17

Screw wood Steel 25 into 6mm

As per uploaded specification documents

3 pkt Delivery: 15 days
#18

GI Union 20mm dia

As per uploaded specification documents

9 nos Delivery: 15 days
#19

PVC connection pipe 15 into 600mm long with che

As per uploaded specification documents

20 nos Delivery: 15 days
#20

Shower Rose CP 75mm

As per uploaded specification documents

2 nos Delivery: 15 days
#21

GI Union 15mm dia

As per uploaded specification documents

15 nos Delivery: 15 days
#22

Screw wood Steel 35 into 8mm

As per uploaded specification documents

3 pkt Delivery: 15 days
#23

Screw wood Steel 30mm into 8mm

As per uploaded specification documents

3 pkt Delivery: 15 days
#24

Waste coupling for steel sink

As per uploaded specification documents

4 nos Delivery: 15 days
#25

PVC shower Rose 15mm inlieu of PVC Requi

As per uploaded specification documents

5 nos Delivery: 15 days
#26

GI Elbow 20mm

As per uploaded specification documents

27 nos Delivery: 15 days
#27

Alrabolt aluminum 250mm

As per uploaded specification documents

7 nos Delivery: 15 days
#28

Gate Valve CI 20mm

As per uploaded specification documents

1 nos Delivery: 15 days
#29

Mixer Spindle with cap 15mm with handle

As per uploaded specification documents

9 nos Delivery: 15 days
#30

GI Bend 20mm

As per uploaded specification documents

9 nos Delivery: 15 days
#31

PVC waste pipe 32mm

As per uploaded specification documents

68 nos Delivery: 15 days
#32

GI Tank Nipple 15mm

As per uploaded specification documents

20 nos Delivery: 15 days
#33

Brush painting 50mm

As per uploaded specification documents

2 nos Delivery: 15 days
#34

Float valve PVC 15mm complete

As per uploaded specification documents

7 nos Delivery: 15 days
#35

GI Socket 25mm

As per uploaded specification documents

20 nos Delivery: 15 days
#36

CP Brass Towel ring

As per uploaded specification documents

13 nos Delivery: 15 days
#37

PVC connection pipe 15 into 450mm long with che

As per uploaded specification documents

50 nos Delivery: 15 days
#38

GI Elbow 25mm

As per uploaded specification documents

15 nos Delivery: 15 days
#39

GI Tee Reducings 25 into 15 into 25mm

As per uploaded specification documents

12 nos Delivery: 15 days
#40

PVC float valve 20mm with complete set

As per uploaded specification documents

3 nos Delivery: 15 days
#41

Stop cock PVC 15mm

As per uploaded specification documents

9 nos Delivery: 15 days
#42

PVC connection pipe 15 into 450mm long with che

As per uploaded specification documents

18 nos Delivery: 15 days
#43

CP grating 100mm with hole

As per uploaded specification documents

11 nos Delivery: 15 days
#44

Hydraulic Door Closure

As per uploaded specification documents

1 nos Delivery: 15 days
#45

GI Socket reducer 25 into 20mm

As per uploaded specification documents

15 nos Delivery: 15 days
#46

Hasp and Stapple aluminum 100mm

As per uploaded specification documents

12 nos Delivery: 15 days
#47

Pillar cock PVC 15mm complete Fancy Type

As per uploaded specification documents

5 nos Delivery: 15 days
#48

GI Socket reducer 20 into 15mm

As per uploaded specification documents

20 nos Delivery: 15 days
#49

Cupboard Knob 40mm

As per uploaded specification documents

10 nos Delivery: 15 days
#50

PVC Bib tap 15 mm inlieu of PVC Required C

As per uploaded specification documents

8 nos Delivery: 15 days
#51

Alrabolt aluminum 200mm

As per uploaded specification documents

4 nos Delivery: 15 days
#52

GI Bend 15mm

As per uploaded specification documents

8 nos Delivery: 15 days
#53

Tower bolt aluminum 150mm

As per uploaded specification documents

8 nos Delivery: 15 days
#54

Butt Hinges MS 75mm

As per uploaded specification documents

20 nos Delivery: 15 days
#55

GI Elbow 15mm

As per uploaded specification documents

60 nos Delivery: 15 days
#56

PVC Towel rail 600mm

As per uploaded specification documents

25 nos Delivery: 15 days
#57

GI Tank Nipple 20mm

As per uploaded specification documents

20 nos Delivery: 15 days
#58

GI Socket reducer 25 into 15mm

As per uploaded specification documents

49 nos Delivery: 15 days
#59

GI Socket 15mm

As per uploaded specification documents

100 nos Delivery: 15 days
#60

Tower bolt aluminum 100mm

As per uploaded specification documents

40 nos Delivery: 15 days
#61

GI Socket 20mm

As per uploaded specification documents

55 nos Delivery: 15 days
#62

Tower bolt aluminum 200mm

As per uploaded specification documents

20 nos Delivery: 15 days
#63

Tower bolt aluminum 150mm

As per uploaded specification documents

25 nos Delivery: 15 days
#64

GI Tee Equal 15mm

As per uploaded specification documents

60 nos Delivery: 15 days
#65

PVC connection pipe 15 into 600mm long with che

As per uploaded specification documents

35 nos Delivery: 15 days
#66

PVC waste coupling 32mm

As per uploaded specification documents

35 nos Delivery: 15 days
#67

GI Tee Equal 20mm

As per uploaded specification documents

32 nos Delivery: 15 days
#68

PVC waste coupling 40mm

As per uploaded specification documents

8 nos Delivery: 15 days
#69

Butt Hinges MS 100mm

As per uploaded specification documents

28 nos Delivery: 15 days

Categories 70

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

Audited balance sheets for last 3 years or CA certificate showing turnover

6

OEM authorization (where applicable)

7

Technical compliance certificates for ISI/BIS standards

8

Proof of OEM turnover (if bidder is not OEM)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for ISI/BIS compliant electrical goods tender in Pune?

Bidders must meet turnover criteria for last 3 years, provide PAN, GST, EFT mandate, and audited financials. Submit OEM authorizations for ISI/BIS marked items and ensure conformity to IS 8931, IS 694, IS 7809, and IS 10322 standards. Delivery is supply-only with optional quantity adjustments up to 25%.

What documents are required for Pune Army electrical tender submission?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, audited balance sheets or CA certificate for turnover, OEM authorization (if applicable), ISI/BIS compliance certificates, and proof of turnover for OEM. Ensure all documents correspond to the last 3 financial years and are uploaded with bid.

What are the key standards for LED fixtures in this tender?

LED Batten and Floodlight luminaires must comply with IS 10322 Part 5 Sec 5 under BIS Scheme II and be marked V2/V3 per item. Provide BIS/ISI certification documents and product datasheets showing ISI/BIS conformity for all LED items.

What is the delivery scope and extension policy for this Army tender?

Scope covers supply of goods only. Delivery timeline begins from the last date of the original delivery order. An option to increase quantity by up to 25% may extend delivery time; minimum extension is 30 days and scales with quantity change.

What is the role of OEM turnover in bidding this procurement?

OEM turnover must meet the minimum average annual turnover requirement for the offered product category over the last 3 years. For bunch bids, the OEM with the highest bid value must satisfy turnover criteria and provide supporting audited or CA-certified documents.

How to verify ISI/BIS conformity for copper taps and cables in this tender?

Verify marks on product packaging and obtain ISI/BIS conformity certificates from the manufacturer. Ensure the copper taps conform to IS 8931 and cables to IS 694 specifications; cross-check BIS Scheme II and ISI marks for LED items and Taps against tender requirements.

When is the supply contract for Pune Army electrical items expected?

Delivery terms rely on the last delivery order date; the option clause permits a 25% quantity variation with extended timelines. Specific delivery deadlines are not disclosed in the available data; bidders should prepare for flexible scheduling and staged deliveries.

What are the key penalties or LD terms for late delivery in this tender?

Penalties and LD terms are not detailed in the provided data. Typical government contracts impose LDs per day for delayed deliveries; bidders should review the final contract for LD rates, grace periods, and cap limits, and ensure robust logistics planning to avoid penalties.

Advertisement