TenderDekho Logo
Closed GEM

HPCL Visakhapatnam Seamless and IBR Pipe Procurement Tender 2026 – 18 Pipe Sizes, 25% Quantity Option, Delivery Terms

Bid Publish Date

23-Oct-2026, 8:19 pm

Bid End Date

03-Nov-2026, 3:00 pm

Progress

Issue23-Oct-2026, 8:19 pm
AwardPending

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for a broad range of seamless and IBR pipes to support operations at its Visakhapatnam, Andhra Pradesh facility. The procurement covers 18 pipe sizes including 0.5 inch SMLS 160, 1.5 inch SMLS XS, up to 24 inch E.FS.W STD and several IBR variants, with no stated quantity or total estimated value in the data provided. The contract includes an option clause allowing a ±25% quantity adjustment at bid and during contract execution, with delivery timelines anchored to the last delivery order date. This tender requires bidders to align with the purchaser’s delivery extension rules and to adhere to the extended-period calculation method (minimum 30 days). Bidders must comply with the buyer’s ATC and submit all mandated declarations and certifications as part of the technical bid.

Technical Specifications & Requirements

  • No specific technical specifications are listed in the tender data.
  • 18 pipe items exist in the BOQ with N/A quantities; product category includes SMLS and IBR pipe types across multiple diameters (0.5 - 24 inches).
  • Required documentation includes Nil Deviation to tender terms, PQC-related documents, Land Border Declaration, Holiday listing/Banned declaration, and UDYAM/ISO certificates if applicable.
  • Delivery terms reference the original and extended delivery periods, with a quantitative adjustment rule of up to 25% during both placement and currency of contract.
  • Additional ATC documents are uploaded; bidders should view the ATC for specific instructions.

Terms & Eligibility

  • EMD amount not disclosed in the data provided.
  • Option clause permits a 25% quantity increase/decrease at contract placement and during the currency of the contract.
  • Delivery timelines start from the last date of the original delivery order; extension computations require minimum 30 days and may extend to the original delivery period.
  • Required documents for submission: Nil Deviation, PQC documents, Land Border Declaration, Holiday listing/Banned declaration, UDYAM certificate and ISO certificate if applicable.
  • Bidders must comply with all Buyer Added Terms and Conditions and view the uploaded ATC for additional requirements.

Key Specifications

    • Product/service: Pipe sizes in both Seamless (SMLS) and Isolated/IBR variants
    • Diameters covered: from 0.5 inch to 24 inch (specific items include 0.5, 1.5, 4, 6, 8, 14, 18, 20, 24 inches and more)
    • Categories: SMLS, IBR_PIPE SMLS, IBR pipe STD/XS, with multiple standard designations
    • Quantity: Not specified in provided data; BOQ shows 18 items with N/A quantities
    • Delivery: Based on original delivery order date with 25% quantity variation rights and minimum 30-day extended period

Terms & Conditions

  • Option clause allowing ±25% quantity variation during contract and at placement

  • Delivery period anchored to last delivery order date with extended-period rules

  • ATC documents required: Nil Deviation, PQC, Land Border Declaration, Holiday listing/Banned declaration, UDYAM/ISO certificates

Important Clauses

Payment Terms

Not detailed in provided data; payment terms to be clarified in the tender ATC and purchase order.

Delivery Schedule

Delivery begins after the last date of the original delivery order; quantity extensions use formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not specified in the supplied data; check ATC for LD/penalty structure.

Bidder Eligibility

  • Compliance with buyer-added terms and conditions

  • Submission of Nil Deviation and PQC documents with technical bid

  • Submission of Land Border Declaration and Holiday listing/Banned declaration

  • UDYAM certificate and ISO certificate, if applicable

Advertisement

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

2910

Category

24 inch PIPE E.FS.W STD

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1.5 inch PIPE SMLS XS , 10 inch PIPE SMLS STD , 14 inch PIPE SMLS STD , 18 inch PIPE E.FS.W STD , 20 inch PIPE E.FS.W STD , 24 inch PIPE E.FS.W STD , 0.75 inch PIPE SMLS 160 , 8 inch PIPE SMLS STD , 1 inch PIPE SMLS XS , 0.5 inch PIPE SMLS 160 , 1.5 inch IBR_PIPE SMLS XS , 1 inch IBR PIPE SMLS XS , 0.5 inch IBR_PIPE SMLS 160 , 2 inch IBR PIPE SMLS XS , 3 inch IBR PIPE SMLS STD , 4 inch IBR PIPE SMLS STD , 6 inch IBR PIPE SMLS STD

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

14

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

112

Delivery Locations

1

Delivery Cities

Visakhapatanam

Delivery Pincodes

530011

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pithani Sai Seshnag530011,HPCL, Visakh Refinery, PB No. 15, Malkapuram, Visakhapatnam-530011VisakhapatanamAndhra Pradesh5300116112-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-10075276.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

1.5 inch PIPE SMLS XS

Please refer detailed specification sheet

6 meter Delivery: 112 days
#2

10 inch PIPE SMLS STD

Please refer detailed specification sheet

42 meter Delivery: 112 days
#3

14 inch PIPE SMLS STD

Please refer detailed specification sheet

6 meter Delivery: 112 days
#4

18 inch PIPE E.FS.W STD

Please refer detailed specification sheet

6 meter Delivery: 112 days
#5

20 inch PIPE E.FS.W STD

Please refer detailed specification sheet

54 meter Delivery: 112 days
#6

24 inch PIPE E.FS.W STD

Please refer detailed specification sheet

84 meter Delivery: 112 days
#7

0.75 inch PIPE SMLS 160

Please refer detailed specification sheet

72 meter Delivery: 112 days
#8

8 inch PIPE SMLS STD

Please refer detailed specification sheet

18 meter Delivery: 112 days
#9

1 inch PIPE SMLS XS

Please refer detailed specification sheet

30 meter Delivery: 112 days
#10

0.5 inch PIPE SMLS 160

Please refer detailed specification sheet

192 meter Delivery: 112 days
#11

0.75 inch PIPE SMLS 160

Please refer detailed specification sheet

18 meter Delivery: 112 days
#12

1.5 inch IBR_PIPE SMLS XS

Please refer detailed specification sheet

132 meter Delivery: 112 days
#13

1 inch IBR PIPE SMLS XS

Please refer detailed specification sheet

90 meter Delivery: 112 days
#14

0.5 inch IBR_PIPE SMLS 160

Please refer detailed specification sheet

120 meter Delivery: 112 days
#15

2 inch IBR PIPE SMLS XS

Please refer detailed specification sheet

1,866 meter Delivery: 112 days
#16

3 inch IBR PIPE SMLS STD

Please refer detailed specification sheet

156 meter Delivery: 112 days
#17

4 inch IBR PIPE SMLS STD

Please refer detailed specification sheet

12 meter Delivery: 112 days
#18

6 inch IBR PIPE SMLS STD

Please refer detailed specification sheet

6 meter Delivery: 112 days

Required Documents

1

Nil Deviation to Tender terms and conditions

2

PQC related documents and other documents requested in ATC

3

Duly signed and filled Land Border Declaration

4

Holidaylisting/ Banned declaration on your letter head

5

UDYAM certificate and ISO certificate, if applicable

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for HPCL Visakhapatnam pipe tender 2026 in India

Bidders must submit Nil Deviation to tender terms, PQC documents, Land Border Declaration, Holiday listing declaration, and UDYAM/ISO certificates if applicable. Ensure compliance with the 25% quantity variation clause and the delivery-date extension rules in the ATC.

What documents are required for pipe tender submission in Visakhapatnam

Required documents include Nil Deviation to tender terms, PQC documents, Land Border Declaration, Holiday listing/Banned declaration on letterhead, and UDYAM/ISO certificates if applicable. Ensure these are uploaded with the technical bid as per ATC.

What are the pipe sizes covered in HPCL Visakhapatnam procurement

The tender covers 18 pipe items spanning sizes from 0.5 inch SMLS 160 up to 24 inch E.FS.W STD, including 1.5 inch SMLS XS and 1 inch IBR variants, with both SMLS and IBR classifications.

When is the delivery period for HPCL Visakhapatnam pipe contract

Delivery timelines commence from the last date of the original delivery order. The option clause allows up to 25% quantity variation, with extended time computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What are the eligibility requirements for pipe suppliers in this tender

Eligibility includes compliance with buyer terms, submission of required ATC documents, and possession of UDYAM and ISO certificates if applicable. Also comply with the 25% quantity option and ensure technical bid includes all PQC-related documents.

What standards or certifications are required for HPCL pipe supply

If applicable, bidders must provide UDYAM certificate and ISO certification as per ATC. Specific ISI/ISO or other standard references are not listed in the data; verify in the uploaded ATC for exact standards.

How to verify the 25% quantity option in this tender

The purchaser reserves the right to increase or decrease quantity up to 25% at contract placement and during the currency of the contract. This requires acceptance of contracted rates and adherence to delivery terms during execution.

What is the role of the Land Border Declaration in submission

The Land Border Declaration is a mandatory document to be uploaded with the technical bid, confirming compliance with border and trade requirements. It is part of the bidder’s compliance pack alongside PQC and safety declarations.

Advertisement