Milk Boiler
Indian Army
WEST DELHI, DELHI
Bid Publish Date
20-Jun-2026, 9:00 pm
Bid End Date
26-Jun-2026, 9:00 pm
Value
โน1,50,000
Progress
Quantity
5
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a Milk Boiler (Q3) under the General product category with an estimated value of โน150,000. The tender requires bidders to arrange a sample for the consignee location and upload a Bid Compliance Certificate. The contract contemplates a flexible quantity clause allowing up to 25% increase in order quantity either at initial award or during the currency of the contract. The procurement is location-agnostic in the data, with no start/end dates disclosed. A crucial differentiator is the explicit option clause and the mandatory sample submission, which may influence evaluation timelines and delivery sequencing. This tender focuses on a standard milk boiler with adjustable temperature settings and specific material/volume requirements, as described in the technical specifications. Bidders should plan for a streamlined delivery process aligned with the option clause and ensure readiness to demonstrate sample conformity at the consignee location.
Quantity variation up to 25% during/after contract with extended delivery implications
Sample must be presented at consignee location; bid compliance certificate required
Delivery period adjusts based on original/extended delivery times; minimum 30 days rule
Payment terms align with standard Army procurement; no explicit terms provided; verify in tender and ATCs
Delivery begins from the last date of original delivery order; option clause may extend timelines with proportional time calculation
Not explicitly stated; implied risk of LD if delivery deadlines are missed; confirm through ATC
Demonstrated capability to supply milk boiler equipment meeting general category expectations
Submission of Bid Compliance Certificate and product sample at consignee location
Compliance with 25% quantity variation clause and delivery extension rules
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Milk Boiler (Q3)
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
WEST DELHI, DELHI
Government Medical College And Hospital
Indian Army
Pauri Garhwal, UTTARAKHAND
Indian Army
JODHPUR, RAJASTHAN
Indian Army
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| General | Type of Milk Boiler | Electric |
| General | Temperature Setting | Auto Set Temperature, Manual Set Temperature |
| Material | Material of Milk Boiler Inner Body | Stainless Steel(304) |
| Material | Material of Milk Boiler Outer Body | Stainless Steel(304) |
| Material | Material of Lid | Stainless Steel(304) |
| Capacity | Capacity of Milk Boiler ( in Litre) | 500 |
| Warranty | Warranty of Milk Boiler (in Year) | 1 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar milk boiler supply
Financial statements (latest year)
EMD documents (as per Army standard, if applicable)
Technical bid documents confirming product specifications
OEM authorization or manufacturer authorization (if applicable)
Bid Compliance Certificate
Sample delivery plan for consignee location
Extended Deadline
26-Jun-2026, 9:00 pm
Opening Date
26-Jun-2026, 9:30 pm
Bidders must submit Bid Compliance Certificate, GSTIN, PAN, and financials, plus a milk boiler sample at the consignee location. Ensure sample matches the claimed specifications, with temperature settings and material details clearly stated. The option clause allows up to 25% quantity variations during contract.
Required documents include GST certificate, PAN card, experience certificates for similar supply, financial statements, EMD (if applicable), OEM authorization, technical bid, and Bid Compliance Certificate. Samples must be delivered to the consignee location for evaluation.
Delivery runs from the last date of the original order; quantity may be increased/decreased up to 25% at award or during contract. Additional time is calculated as (extra quantity/original quantity) ร original delivery period, with a minimum of 30 days.
Bidders should indicate IS/ISO alignment and provide material details for inner/outer body and lid, plus temperature adjustment range. While not explicit, standard procurement expects IS 550/ISI markings where applicable and vendor warranties consistent with government tenders.
Samples must be brought to the consignee location as part of bid compliance; exact deadline follows the bid schedule and ATCs. Ensure readiness for immediate testing and submission during evaluation.
Evaluation prioritizes sample conformance, material and temperature specifications, supplier capability, and compliance with the 25% quantity option. Ensure Bid Compliance Certificate is uploaded and all technical bids reflect exact product details.
Penalties or liquidated damages are implied by delivery terms, though explicit LD rates arenโt stated in data. Bidders should assume standard government LD implications and confirm exact rates in ATC during final submission.
Indian Army
๐ LEH, JAMMU & KASHMIR
Indian Air Force
๐ BANGALORE, KARNATAKA
Indian Army
๐ SONITPUR, ASSAM
Indian Army
๐ PUNE, MAHARASHTRA
Tamil Nadu Cooperative Milk Producers Federation L
๐ VILLUPURAM, TAMIL NADU
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS