Progress
N/a has released a public tender for Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) in JUNAGADH, GUJARAT. Quantity: 1. Submission Deadline: 03-09-2026 19: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
3
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Junagadh
Delivery Pincodes
362001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Bandhiya Bhikhubhai Khimabhai | 362001,Office of Deputy Conservator of Forests, Junagadh Forest Division, Sardarbaug, Junagadh 362001 | Junagadh | Gujarat | 362001 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Features and Performance | Type of Water Purification Technology | Generally Conformity to IS 14724 for Ultraviolet (UV)+Ultrafiltration (UF) |
| Features and Performance | Rate of Flow (In LPH) of purified water | upto 100 LPH |
| Features and Performance | Method of Mounting | Freestanding |
| Features and Performance | Input Water Source Connection | Plumber-In |
| Features and Performance | Additional Water Conditioning and Other Features | Sand Filter, Sediment Filter, Pre Carbon Filter, Post Carbon Filter, Mineral Filter, Micron Filter, Alkaline Filter, Flushing Mechanism, Reject Water Control Mechanism, Mineraliser/Taste Enhancer Media, Activated Carbon Media, Normal Water Dispensing, Cold Water Dispensing, Hot Water Dispensing |
| Features and Performance | Maximum Feed Water TDS (ppm) at which the machine LPH and Guaranteed output water quality is ensured | upto 500 |
| Features and Performance | Guaranteed output water quality | As per IS 10500 or better |
| Water Storage | Storage Tank (inclusive in the scope of supply) | Self Contained Water Cooler |
| Water Storage | Type of Water Tank / Location | Self Contained Water Cooler |
| Water Storage | Storage Tank Material | Self Contained Water Cooler |
| Water Storage | Storage Tank Capacity (in Ltr) | Self Contained Water Cooler |
| Water Storage | Self Contained Water Cooler | Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 60 LPH at Rated conditions and Storage Capacity 120 Liters (I,e 60/120 water cooler.) |
| Controller and Display | Type of Controller | Fully Automatic |
| Controller and Display | Controller and Display Features | Auto cut-off |
| Service, Warranty, Installation and Commissioning | Training and Demonstration | The installation and demonstration of the machine at the consignee place shall be carried out as part of installation and commissioning |
| Certification / Test Report | Availability of Test Report From Central Govt/Nabl/Ilac Accredited Lab to Prove Conformity to Specification | Yes |