TenderDekho Logo
Closed GEM

Hindustan Petroleum Corporation Ltd Procurement Tender 2026 for 131 Items - EMD ₹200000 GST Terms

Bid Publish Date

03-Mar-2026, 10:19 am

Bid End Date

13-Mar-2026, 3:00 pm

EMD

₹2,00,000

Progress

RA
Issue03-Mar-2026, 10:19 am
Reverse Auction31-Mar-2026, 2:00 pm
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

12522

Categories 76

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids under a generic procurement tender for the supply of multiple items (131 BOQ lines) with an EMD of ₹200,000. The scope lists 131 items but provides no explicit technical specifications in the data. The tender maintains flexibility on quantity through an Option Clause (±25% of bid quantity during/after award) and a delivery timeline aligned to the original schedule, computing extra time as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Bidders must ensure their financial viability and compliance with GST considerations.

Key Specifications

  • 131 items in BOQ; exact quantities not disclosed

  • EMD amount: ₹200,000

  • Option clause: ±25% quantity adjustment at contract; delivery time recalculated with minimum 30 days

  • GST treatment: bidder bears GST; reimbursement based on actuals or lower quoted rate

  • Vendor code prerequisites: PAN, GSTIN, cancelled cheque, EFT mandate

  • Liability terms: seller remains jointly and severally liable with subcontractors

  • Contract termination rights for non-compliance or delay

Terms & Conditions

  • EMD of ₹200,000 required with bid

  • Option Clause permits ±25% quantity changes

  • GST applicability determined by bidder; reimbursement as actuals or lower rate

  • Vendor code creation requires PAN, GSTIN, cancelled cheque, EFT mandate

  • Delivery schedule tied to original order; extensions follow calculated formula

Important Clauses

Payment Terms

GST and payment will align with actuals or the lower rate; bidder to bear GST impact; EMD retained as security.

Delivery Schedule

Delivery period starts from last date of original delivery order; option-based extended time uses (increased quantity ÷ original quantity) × Original delivery period with minimum 30 days.

Penalties/Liquidated Damages

Buyer may terminate for non-delivery or late delivery; liabilities apply to both seller and any sub-contractor.

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Demonstrate financial stability with vendor documentation

  • Provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9070668.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 131 Items Sign in for GEM prices

#1

P Locktite 243 Pack 250ml

Refer to the technical document

15 ea Delivery: 30 days
#2

SOLENOID VALVE,7010021100 KOSNCRIS

Refer to the technical document

35 eac Delivery: 30 days
#3

RAIL,257B865,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#4

VALVE,126100,KOSNCRIS CAROUSEL

Refer to the technical document

18 eac Delivery: 30 days
#5

FORK,140A073,CAROUSEL KOSNCRIS

Refer to the technical document

40 eac Delivery: 30 days
#6

P 141328Screw DIN912 M8 into 16-8.8

Refer to the technical document

50 eac Delivery: 30 days
#7

WHEEL,714903,KOSNCRIS CAROUSEL

Refer to the technical document

32 eac Delivery: 30 days
#8

LIGHT GUIDE,168A738,CAROUSEL KOSNCRIS,M4

Refer to the technical document

24 eac Delivery: 30 days
#9

ARM,KOSAN NYLON,300MM,EJECTION UNIT

Refer to the technical document

20 eac Delivery: 30 days
#10

FLEX COUPLING,138A801,KOSNCRIS CAROUSEL

Refer to the technical document

40 eac Delivery: 30 days
#11

FASTENER and FITTING,235B460 KOSNCRIS

Refer to the technical document

26 eac Delivery: 30 days
#12

HOOK,259B717,CAROUSEL KOSNCRIS

Refer to the technical document

26 eac Delivery: 30 days
#13

BRACKET,139A155,CAROUSEL KOSNCRIS

Refer to the technical document

45 eac Delivery: 30 days
#14

BRACKET,259B713,CAROUSEL KOSNCRIS

Refer to the technical document

12 eac Delivery: 30 days
#15

BRACKET,259B715,CAROUSEL KOSNCRIS

Refer to the technical document

12 eac Delivery: 30 days
#16

BRACKET,259B716,CAROUSEL KOSNCRIS

Refer to the technical document

12 eac Delivery: 30 days
#17

BALL GUIDE SHAFT,151A444.995 KOSNCRIS

Refer to the technical document

24 eac Delivery: 30 days
#18

BRACKET,131518,KOSNCRIS CAROUSEL

Refer to the technical document

25 eac Delivery: 30 days
#19

BALL BUSHING,151A354,CAROUSEL KOSNCRIS,D

Refer to the technical document

130 eac Delivery: 30 days
#20

P 252B002Ball Guide Housing -I

Refer to the technical document

11 eac Delivery: 30 days
#21

INTRODUCTION PLATE,KOSAN MS,INTRODUCTION

Refer to the technical document

6 eac Delivery: 30 days
#22

P 262B351Base fixing-with 262

Refer to the technical document

12 eac Delivery: 30 days
#23

BEARING,262B356,CAROUSEL KOSNCRIS

Refer to the technical document

11 eac Delivery: 30 days
#24

LIFTING RAIL,270B961,CAROUSEL KOSNCRIS

Refer to the technical document

35 eac Delivery: 30 days
#25

HOSE NOZZLE,134A494,CAROUSEL KOSNCRIS

Refer to the technical document

100 eac Delivery: 30 days
#26

VALVE SPINDLE,101062,CAROUSEL KOSNCRIS

Refer to the technical document

24 eac Delivery: 30 days
#27

CHAIN CONVEYOR SYS PUSHER ASSLY

Refer to the technical document

18 eac Delivery: 30 days
#28

STABILIZER,332B545,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#29

CONSOLE,103651,CAROUSEL KOSNCRIS

Refer to the technical document

10 eac Delivery: 30 days
#30

FILLING HEAD SC VALVE,224B760 KOSNCRIS

Refer to the technical document

18 eac Delivery: 30 days
#31

P 501320Console plate for Fill

Refer to the technical document

20 ea Delivery: 30 days
#32

PLATE,348B064,CAROUSEL KOSNCRIS

Refer to the technical document

10 eac Delivery: 30 days
#33

SWITCH,139A714,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#34

P Display for CUC MKIII

Refer to the technical document

35 eac Delivery: 30 days
#35

CYL FITTING,103653,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#36

FRONT PLATE,114143,CAROUSEL KOSNCRIS

Refer to the technical document

45 eac Delivery: 30 days
#37

CUC COVER,KOSNCRIS CAROUSEL

Refer to the technical document

150 eac Delivery: 30 days
#38

SINGLE UNION,140A291,CAROUSEL KOSNCRIS,L

Refer to the technical document

50 eac Delivery: 30 days
#39

REFLECTOR CAROUSEL

Refer to the technical document

200 eac Delivery: 30 days
#40

SCREW,111A352,CAROUSEL KOSNCRIS,M10X40MM

Refer to the technical document

10 eac Delivery: 30 days
#41

SLIDE,101060,CAROUSEL KOSNCRIS

Refer to the technical document

19 eac Delivery: 30 days
#42

CENTERING ARM,108680,CAROUSEL KOSNCRIS

Refer to the technical document

500 eac Delivery: 30 days
#43

SUSPENSION,106294,CAROUSEL KOSNCRIS

Refer to the technical document

800 eac Delivery: 30 days
#44

ARM COMPLETE LEFT,256B433.V KOSNCRIS

Refer to the technical document

140 eac Delivery: 30 days
#45

ARM COMPLETE RIGHT,256B433.H KOSNCRIS

Refer to the technical document

140 eac Delivery: 30 days
#46

LOWER BELL,125483.055,KOSAN ELD

Refer to the technical document

20 eac Delivery: 30 days
#47

P Aluminium Block for GD slash PT ce

Refer to the technical document

30 eac Delivery: 30 days
#48

VALVE,111228RES,KOSNCRIS SIZE 0.25 IN,CARO

Refer to the technical document

10 eac Delivery: 30 days
#49

P Clevis back mounting of GDPT

Refer to the technical document

25 eac Delivery: 30 days
#50

SHAFT,230B953,CAROUSEL KOSNCRIS

Refer to the technical document

30 eac Delivery: 30 days
#51

CENTER SECTION,230B896 KOSNCRIS

Refer to the technical document

30 eac Delivery: 30 days
#52

BASE,237B991,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#53

BLOCK,230B938,CAROUSEL KOSNCRIS

Refer to the technical document

36 eac Delivery: 30 days
#54

COUPLING,137A860,CAROUSEL KOSNCRIS,M12X1

Refer to the technical document

30 eac Delivery: 30 days
#55

GUIDE,105248300,CAROUSEL KOSNCRIS

Refer to the technical document

30 eac Delivery: 30 days
#56

BLOCK,230B955,CAROUSEL KOSNCRIS

Refer to the technical document

36 eac Delivery: 30 days
#57

LIFTING DISC,230B890,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#58

YOKE,230B956,CAROUSEL KOSNCRIS

Refer to the technical document

36 eac Delivery: 30 days
#59

GUIDE,105249,CAROUSEL KOSNCRIS,DIA 40MM

Refer to the technical document

30 eac Delivery: 30 days
#60

P Shaft SS Hex Piston Shaft

Refer to the technical document

100 eac Delivery: 30 days
#61

P Screw DIN 933 8.8 M8 into 70 GDPT

Refer to the technical document

100 eac Delivery: 30 days
#62

WHEEL,215B931,CAROUSEL KOSNCRIS

Refer to the technical document

500 eac Delivery: 30 days
#63

ANGLE JOINT,159A459,CAROUSEL KOSNCRIS,M1

Refer to the technical document

300 eac Delivery: 30 days
#64

P SS O-ring Inserter Spring

Refer to the technical document

20 eac Delivery: 30 days
#65

NEEDLE VALVE,136A408,CAROUSEL KOSNCRIS,6

Refer to the technical document

18 eac Delivery: 30 days
#66

V-BUFFER,241B108,CAROUSEL KOSNCRIS

Refer to the technical document

20 eac Delivery: 30 days
#67

GUIDE ROD,151A444.770,KOSNCRIS CAROUSEL

Refer to the technical document

24 eac Delivery: 30 days
#68

P 140A249Elbow Coupl Swivel

Refer to the technical document

10 eac Delivery: 30 days
#69

SINGLE UNION,140A291,CAROUSEL KOSNCRIS,L

Refer to the technical document

50 eac Delivery: 30 days
#70

P Elbow Coupl Swivel 1 by 4Mp 4 e

Refer to the technical document

50 eac Delivery: 30 days
#71

HOSE,134A466,CAROUSEL KOSNCRIS

Refer to the technical document

100 eac Delivery: 30 days
#72

SPRING,159A533,KOSNCRIS PT HEAD

Refer to the technical document

50 eac Delivery: 30 days
#73

BUFFER,216B068,CAROUSEL KOSNCRIS,M6X15MM

Refer to the technical document

20 eac Delivery: 30 days
#74

P 214B734.433Shaft SS GUIDE sh

Refer to the technical document

14 eac Delivery: 30 days
#75

REFLEX SWITCH,120901,CAROUSEL KOSNCRIS

Refer to the technical document

28 eac Delivery: 30 days
#76

SWITCH,120902,CAROUSEL KOSNCRIS

Refer to the technical document

10 eac Delivery: 30 days
#77

PROXIMITY SWITCH,120900 KOSNCRIS

Refer to the technical document

22 eac Delivery: 30 days
#78

SENSOR,168A093,CAROUSEL KOSNCRIS

Refer to the technical document

50 eac Delivery: 30 days
#79

SENSOR,DIFFUSIVE,SICK WT242X400

Refer to the technical document

10 eac Delivery: 30 days
#80

SENSOR,161A182,CAROUSEL KOSNCRIS

Refer to the technical document

10 eac Delivery: 30 days
#81

LOAD CELL,355B572,CAROUSEL KOSNCRIS,200K

Refer to the technical document

6 eac Delivery: 30 days
#82

VALVE,140A951,CAROUSEL KOSNCRIS

Refer to the technical document

14 eac Delivery: 30 days
#83

COIL,SXE9561A8600,NORGREN CYLINDER

Refer to the technical document

14 eac Delivery: 30 days
#84

SWIVEL ARM SET,CONVEYOR

Refer to the technical document

60 eac Delivery: 30 days
#85

SWIVEL ARM SET,CONVEYOR

Refer to the technical document

60 eac Delivery: 30 days
#86

ROLLER,203800,CAROUSEL KOSNCRIS

Refer to the technical document

300 eac Delivery: 30 days
#87

BRACKET,140A074,CAROUSEL KOSNCRIS

Refer to the technical document

60 eac Delivery: 30 days
#88

BUSHING,124A002,CAROUSEL KOSNCRIS,25 by 30X

Refer to the technical document

60 eac Delivery: 30 days
#89

SWIVEL JOINT,262B358,CAROUSEL KOSNCRIS

Refer to the technical document

12 eac Delivery: 30 days
#90

OUTER O-RING,277B485,KOSNCRIS CAROUSEL

Refer to the technical document

20 eac Delivery: 30 days
#91

CONICAL STRUCTURE,CAPPING UNIT NYLON,DIA

Refer to the technical document

12 eac Delivery: 30 days
#92

SEALING UNIT GUN,HOT AIR,MS

Refer to the technical document

15 eac Delivery: 30 days
#93

DUNCKEL GUN,EVACUATION UNIT

Refer to the technical document

5 eac Delivery: 30 days
#94

EJECTION FRAME KOSAN TYPE COMPLETE

Refer to the technical document

3 eac Delivery: 30 days
#95

CAROUSAL ATTENDANT FILLING GUNS

Refer to the technical document

10 mmn Delivery: 30 days
#96

O-RING SET FOR PNEUMATIC FILLING GUN

Refer to the technical document

280 eac Delivery: 30 days
#97

SEAL KIT FOR GAS STOP VALVE

Refer to the technical document

280 eac Delivery: 30 days
#98

SPRING,159A533,KOSNCRIS PT HEAD

Refer to the technical document

300 eac Delivery: 30 days
#99

BEARING,262B356,CAROUSEL KOSNCRIS

Refer to the technical document

200 eac Delivery: 30 days
#100

D AND L MOUNTING

Refer to the technical document

40 eac Delivery: 30 days
#101

16MM MOUNTING FOR STOPPER

Refer to the technical document

20 eac Delivery: 30 days
#102

12mm MOUNTING FOR STOPPER

Refer to the technical document

20 eac Delivery: 30 days
#103

FASTENER 16 into 150 FISHER

Refer to the technical document

320 eac Delivery: 30 days
#104

FASTENER 12 into 150 FISHER

Refer to the technical document

200 eac Delivery: 30 days
#105

Aluminium check scale lifting frame

Refer to the technical document

11 eac Delivery: 30 days
#106

single stopper set v type with norgren c

Refer to the technical document

25 eac Delivery: 30 days
#107

SS ARM JOINT CONNECTOR

Refer to the technical document

180 eac Delivery: 30 days
#108

1 by 2 FITTING SEALING UNIT HOSE L750

Refer to the technical document

20 eac Delivery: 30 days
#109

3 by inch FITTING SEALING PIPE L 750

Refer to the technical document

20 eac Delivery: 30 days
#110

Half inch FITTING SEALING UNIT HOSE L 3 METER

Refer to the technical document

20 eac Delivery: 30 days
#111

HEX NUT BOLT 10 into 25 WITH WASHER

Refer to the technical document

50 kg Delivery: 30 days
#112

HEX NUT BOLT 10 into 35 WITH WASHER

Refer to the technical document

20 kg Delivery: 30 days
#113

HEX NUT BOLT 8 into 50 WITH WASHER

Refer to the technical document

20 kg Delivery: 30 days
#114

HEX NUT BOLT 8 into 70 WITH WASHER

Refer to the technical document

30 kg Delivery: 30 days
#115

HEX NUT BOLT 12 into 35 WITH WASHER

Refer to the technical document

20 kg Delivery: 30 days
#116

HEX NUT BOLT 6 into 20 WITH WASHER

Refer to the technical document

20 kg Delivery: 30 days
#117

HEX NUT BOLT 16 into 30 WITH WASHER

Refer to the technical document

20 kg Delivery: 30 days
#118

HEX NUT BOLT 5 into 35 WITH WASHER

Refer to the technical document

20 kg Delivery: 30 days
#119

HEX NUT BOLT 4 into 10 WITH WASHER

Refer to the technical document

10 eac Delivery: 30 days
#120

HEX NUT BOLT 20 into 150

Refer to the technical document

50 eac Delivery: 30 days
#121

DOUBLETOPPER SET WITHNORGREAN RIGHT L

Refer to the technical document

25 eac Delivery: 30 days
#122

SINGLE STOPPER SET PT NORGREAN CYLINDER

Refer to the technical document

11 eac Delivery: 30 days
#123

ALLEN KEY BOLT 10 into 15

Refer to the technical document

220 eac Delivery: 30 days
#124

ALLEN KEY BOLT 10 into 35

Refer to the technical document

200 eac Delivery: 30 days
#125

ALLEN KEY BOLT 8 into 20 WITH NUT BOLT WASHER

Refer to the technical document

3,000 eac Delivery: 30 days
#126

ALLEN KEY BOLT 6 into 20

Refer to the technical document

400 eac Delivery: 30 days
#127

ALLEN KEY BOLT 4 into 10

Refer to the technical document

300 eac Delivery: 30 days
#128

ALLEN KEY BOLT 5 into 35

Refer to the technical document

300 eac Delivery: 30 days
#129

ALLEN KEY BOLT 12 into 15

Refer to the technical document

200 eac Delivery: 30 days
#130

NTN UCP 212

Refer to the technical document

50 eac Delivery: 30 days
#131

NTN UCP 213

Refer to the technical document

50 eac Delivery: 30 days

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Undertaking of non-liquidation/non-bankruptcy

6

GST and PAN details for vendor code creation

7

Any existing Experience certificates or references (if available)

8

Technical compliance certificates (as applicable to items)

Corrigendum Updates

1 Update
#1

Update

03-Mar-2026

Reverse Auction Schedule

Completed

Start

31-Mar-2026, 2:00 pm

End

01-Apr-2026, 2:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
A S MECHANICAL SYSTEMS PRIVATE LIMITED   Under PMA
-13-03-2026 13:44:50
2
ANAND FABS SYSTEM PRIVATE LIMITED   Under PMA
-12-03-2026 17:28:32
3
SUPERTECH ENGINEERS   Under PMA
-12-03-2026 15:00:00

Financial Results

Rank Seller Price Item
L1
SUPERTECH ENGINEERS( MSE Social Category:OBC )    Under PMA
Item Categories : P Locktite 243 Pack 250ml,SOLENOID VALVE,7010021100 KOSNCRIS,RAIL,257B865,CAROUSEL KOSNCRIS,VALVE,1
L2
A S MECHANICAL SYSTEMS PRIVATE LIMITED( MSE Social Category:General )    Under PMA
Item Categories : P Locktite 243 Pack 250ml,SOLENOID VALVE,7010021100 KOSNCRIS,RAIL,257B865,CAROUSEL KOSNCRIS,VALVE,1
L3
ANAND FABS SYSTEM PRIVATE LIMITED( MSE Social Category:General )    Under PMA
Item Categories : P Locktite 243 Pack 250ml,SOLENOID VALVE,7010021100 KOSNCRIS,RAIL,257B865,CAROUSEL KOSNCRIS,VALVE,1

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for HPCL procurement tender 2026?

Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate for vendor code creation; also include undertaking confirming no liquidation, and GST applicability notes. Ensure financial statements and any experience certificates align with bid requirements; confirm GST treatment per tender terms.

How does the option clause affect quantity in HPCL tender 2026?

The purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during the contract currency. Delivery time adjusts using the formula (increased quantity ÷ original quantity) × original delivery period with a minimum of 30 days.

What is the EMD amount for the HPCL procurement bid 2026?

The EMD is ₹200,000. It acts as security for bid submission and may be retained or forfeited under contract terms if the bidder fails to comply or withdraws post tender, per buyer terms.

What are the GST considerations for HPCL 2026 tender?

Bidders must assess applicable GST themselves; HPCL will reimburse GST as actuals or the lower applicable rate, capped at the quoted percentage. Ensure GSTIN validity and GST documentation accompanies bid.

What are the vendor code submission requirements for HPCL tender?

Submit PAN, GSTIN, Cancelled Cheque, and an EFT Mandate certified by the bank. These documents enable vendor code creation and ensure payment processing and tax compliance.

When can delivery be extended under HPCL procurement terms?

Delivery extensions follow the option clause. If quantity increases, additional time is computed by the specified formula, with a minimum of 30 days and possible extension to original delivery period.

What are the termination rights in HPCL 2026 tender terms?

Buyer may terminate for non-compliance, failure to deliver on time, or failure to replace/reject defective materials. Termination can be with notice, and the seller remains liable together with any subcontractor.

What is the scope of items in the HPCL 131-item BOQ tender?

BOQ contains 131 items; exact quantities and units are not disclosed in the data. Bidders should prepare generic capability to supply multiple items while awaiting itemized specifics.