Bid Publish Date
14-Aug-2026, 8:30 pm
Bid End Date
24-Aug-2026, 9:00 pm
Location
Progress
The Indian Army, Department of Military Affairs, invites bids from qualified suppliers for a broad category of office and equipment items listed under the Lucknow, Uttar Pradesh procurement location. The BOQ comprises 21 items spanning printers (Epson ECO Tank L3210 sets), refrigerators, hand tools, cables, boards, steel pointers, digital weight machines, grass cutters, and PPE such as gloves and shoes. Estimated value and EMD are not disclosed; however, an option clause allows up to a 25% increase in contract quantity at contracted rates. A delivery period aligns with original timelines, with potential extensions, and bidders must meet turnover and service-capability prerequisites.
Option clause permits up to 25% quantity increase during contract and extended delivery period
Mandatory functional service centre within the state or establish within 30 days; payment upon documentary evidence
Demurrage 0.5% of total contract value per day for rejected items not lifted within 48 hours; destruction after 30 days
Payment to be released after submission of required documents; 30-day payment window subject to documentary evidence of service centre availability
Delivery period aligned with original order; option-based quantity expansion extends lead time; minimum extension 30 days
Demurrage charges at 0.5% per day for unlifted rejected items; destruction after 30 days if not lifted
Minimum turnover as per bid document for last 3 financial years
Functional service centre in the state of the consignee or ability to establish within 30 days
Compliance with EFT, GST, PAN, and bank-certified turnover documents
Quantity
172
Category
Printer Epson ECO Tank L3210
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Printer Epson ECO Tank L3210 , Printer Epson ECO Tank L3210 ink Set , Refrigerator , Wire Stripper , LAN Tester , Crimping Tool , Power Strip , DVD R , Heavy Duty Rubber Gloves , Heavy Duty Rubber Shoes , Transparent Tape , Insulation Tape , RJ11 Connector , RJ 11 Telephone Cord Cable , White Board 4x3ft , White Board Stand , Steel Pointer , Laser Pointer , PVC Pipe , Digital Weight Machine , Grass Cutting Machine
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Lucknow
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Lucknow | Lucknow | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Printer Epson ECO Tank L3210
Printer Epson ECO Tank L3210
Printer Epson ECO Tank L3210 ink Set
Printer Epson ECO Tank L3210 ink Set
Refrigerator
Refrigerator
Wire Stripper
Wire Stripper
LAN Tester
LAN Tester
Crimping Tool
Crimping Tool
Power Strip
Power Strip
DVD R
DVD R
Heavy Duty Rubber Gloves
Heavy Duty Rubber Gloves
Heavy Duty Rubber Shoes
Heavy Duty Rubber Shoes
Transparent Tape
Transparent Tape
Insulation Tape
Insulation Tape
RJ11 Connector
RJ11 Connector
RJ 11 Telephone Cord Cable
RJ 11 Telephone Cord Cable
White Board 4x3ft
White Board 4x3ft
White Board Stand
White Board Stand
Steel Pointer
Steel Pointer
Laser Pointer
Laser Pointer
PVC Pipe
PVC Pipe
Digital Weight Machine
Digital Weight Machine
Grass Cutting Machine
Grass Cutting Machine
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Printer Epson ECO Tank L3210 | Printer Epson ECO Tank L3210 | 1 | nos | [email protected] | 15 | |
| 2 | Printer Epson ECO Tank L3210 ink Set | Printer Epson ECO Tank L3210 ink Set | 1 | nos | [email protected] | 15 | |
| 3 | Refrigerator | Refrigerator | 1 | nos | [email protected] | 15 | |
| 4 | Wire Stripper | Wire Stripper | 1 | nos | [email protected] | 15 | |
| 5 | LAN Tester | LAN Tester | 6 | nos | [email protected] | 15 | |
| 6 | Crimping Tool | Crimping Tool | 6 | nos | [email protected] | 15 | |
| 7 | Power Strip | Power Strip | 6 | nos | [email protected] | 15 | |
| 8 | DVD R | DVD R | 50 | nos | [email protected] | 15 | |
| 9 | Heavy Duty Rubber Gloves | Heavy Duty Rubber Gloves | 5 | pair | [email protected] | 15 | |
| 10 | Heavy Duty Rubber Shoes | Heavy Duty Rubber Shoes | 5 | pair | [email protected] | 15 | |
| 11 | Transparent Tape | Transparent Tape | 18 | nos | [email protected] | 15 | |
| 12 | Insulation Tape | Insulation Tape | 19 | nos | [email protected] | 15 | |
| 13 | RJ11 Connector | RJ11 Connector | 1 | pkt | [email protected] | 15 | |
| 14 | RJ 11 Telephone Cord Cable | RJ 11 Telephone Cord Cable | 20 | mtr | [email protected] | 15 | |
| 15 | White Board 4x3ft | White Board 4x3ft | 4 | nos | [email protected] | 15 | |
| 16 | White Board Stand | White Board Stand | 5 | nos | [email protected] | 15 | |
| 17 | Steel Pointer | Steel Pointer | 6 | nos | [email protected] | 15 | |
| 18 | Laser Pointer | Laser Pointer | 8 | nos | [email protected] | 15 | |
| 19 | PVC Pipe | PVC Pipe | 6 | nos | [email protected] | 15 | |
| 20 | Digital Weight Machine | Digital Weight Machine | 2 | nos | [email protected] | 15 | |
| 21 | Grass Cutting Machine | Grass Cutting Machine | 1 | nos | [email protected] | 15 |
GST certificate
PAN card
Cancelled cheque
EFT Mandate certified by bank
Audited Balance Sheets or CA certificate indicating turnover for last 3 years
Proof of functional Service Centre or plan to establish within 30 days of award
OEM authorizations (if applicable)
Technical bid and compliance documents as per ATC
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, cancelled cheque, EFT mandate, and turnover certificates for last three years, plus technical compliance. Ensure service centre coverage in Uttar Pradesh or commitment to establish within 30 days. The tender allows up to 25% quantity variation and requires adherence to delivery timelines and demurrage terms.
Submit GSTIN, PAN, cancelled cheque, EFT mandate, turnover proof (audited balance sheets or CA certificate), proof of service capability in Uttar Pradesh, OEM authorizations if applicable, and all technical bid documents per ATC and corrigenda.
The option clause permits up to 25% additional quantity at contracted rates. Delivery timelines extend from the last date of the original order, with extension computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Demurrage is set at 0.5% of the total contract value per day for rejected items not lifted within 48 hours; if not lifted within one month, items are destroyed with no claim.
The BOQ includes 21 items: Printer Epson ECO Tank L3210 sets, Refrigerator, Wire Stripper, LAN Tester, Crimping Tool, Power Strip, DVD Recorder, Heavy Duty Gloves and Shoes, tapes, RJ connectors, White Boards and stands, Steel Pointer, Laser Pointer, PVC Pipe, Digital Weight Machine, Grass Cutting Machine, and related office/field equipment.
Bidder or OEM must have a functional service centre in the state of each consignee location for carry-in warranty; if not present, a centre must be established within 30 days of award, with documentary evidence required before payment release.
Turnover must be demonstrated for the last three financial years via audited balance sheets or CA-certified turnover; if the bidder is <3 years old, turnover is calculated from completed years post-incorporation, and must meet the minimum threshold stated in the bid document.
Expect payment after submission of GST, PAN, cancelled cheque, EFT mandate, and turnover evidence; terms align with standard government procurement cycles and may require documentary evidence of service capability before payment release.