Bid Publish Date
16-Nov-2026, 8:37 pm
Bid End Date
26-Nov-2026, 9:00 pm
EMD
₹2,00,000
Location
Progress
The procurement is issued by the Indian Army under the Department of Military Affairs for supply of heavy vehicle tyres, inner tubes and valves, including specific sizes such as TYRE PNEU 195 65 R15 91H TL, TYRE PNEU 235 65R17 104H TL, and TYRE PNEU 13.00R22 5.154K TL along with related tubes and valve TR components. Estimated value is not disclosed; the EMD is ₹200,000. The BOQ lists 5 items with unspecified quantities, indicating a multi-item tyre and tube package across potentially multiple vehicle platforms. The clause allows quantity variation up to 25% during contract execution. The project requires alignment with buyer-provided drawings post award and may extend delivery based on drawing approval timelines.
3 years of regular manufacturing/supply experience of the same or similar products to Central/State Govt or PSU
Not under liquidation, court receivership or bankruptcy; provide undertaking
Valid GST registration, PAN, and financial statements; ability to furnish evidence for contracts with government entities
Quantity
343
Category
TUBE 2 50 2 75 18 WITH VALVE TR 29
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
90
Past Performance
80 %
Warranty Period
5 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
TUBE 2 50 2 75 18 WITH VALVE TR 29 , TUBE INNER PNEU 12 00 20 VALVE TR 175A , TYRE PNEU 195 65 R15 91H T L , TYRE PNEU 235 65R17 104H T L , TYRE PNEU 13 00R22 5 154K TUBLESS
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
24
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
CACHAR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | CACHAR | CACHAR | - | - | 5 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
TUBE 2 50 2 75 18 WITH VALVE TR 29
LV6-MT14 2610-001531 TUBE 2.50/2.75-18 WITH VALVE TR-29
TUBE INNER PNEU 12 00 20 VALVE TR 175A
LV6-MT14 BBD-NIV-03/2015/TUBE TUBE INNER PNEU 12.00-20 VALVE TR-175A
TYRE PNEU 195 65 R15 91H T L
LV6-MT14 2610-001567 TYRE PNEU 195/65 R15 91H T/L
TYRE PNEU 235 65R17 104H T L
LV6-MT14 NIV-01/2018/TYRE TYRE PNEU 235/65R17 104H T/L
TYRE PNEU 13 00R22 5 154K TUBLESS
LV6-MT14 NIV-01/2015/YUKTIRATH TYRE TYRE PNEU 13.00R22.5/154K/TUBLESS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TUBE 2 50 2 75 18 WITH VALVE TR 29 | LV6-MT14 2610-001531 TUBE 2.50/2.75-18 WITH VALVE TR-29 | 5 | pieces | neena@kour | 60 | |
| 2 | TUBE INNER PNEU 12 00 20 VALVE TR 175A | LV6-MT14 BBD-NIV-03/2015/TUBE TUBE INNER PNEU 12.00-20 VALVE TR-175A | 170 | pieces | neena@kour | 60 | |
| 3 | TYRE PNEU 195 65 R15 91H T L | LV6-MT14 2610-001567 TYRE PNEU 195/65 R15 91H T/L | 6 | pieces | neena@kour | 60 | |
| 4 | TYRE PNEU 235 65R17 104H T L | LV6-MT14 NIV-01/2018/TYRE TYRE PNEU 235/65R17 104H T/L | 33 | pieces | neena@kour | 60 | |
| 5 | TYRE PNEU 13 00R22 5 154K TUBLESS | LV6-MT14 NIV-01/2015/YUKTIRATH TYRE TYRE PNEU 13.00R22.5/154K/TUBLESS | 129 | pieces | neena@kour | 60 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of supplying similar tyres/tubes to government bodies (minimum 3 years)
Financial statements demonstrating financial stability
EMD payment document (₹200,000)
Technical bid documents and compliance certificates
OEM authorization or dealership certificates (if bidding through resellers)
End User Certificate (if requested in Buyer format)
Bidders must submit GST, PAN, and EMD ₹200,000 along with 3 years of govt supply experience. Provide OEM authorizations if bidding via reseller and detailed design drawings within 5 days of award. Ensure compliance with GST rules and End User Certificate requirements if requested.
Required documents include GST certificate, PAN, 3-year government supply experience contracts, financial statements, EMD receipt, OEM authorization (if applicable), and technical bid documents detailing product compliance and safety handling measures for tyres, inner tubes, and valves.
Delivery period starts after final drawings are approved; if drawing approval is delayed, delivery may be rescheduled without LD. Quantity may be increased by up to 25% during contract, with delivery time adjusted using the specified formula and a minimum 30 days.
While no explicit standard is listed in the tender, bidders must demonstrate capability to supply ISI-marked or equivalent compliant tyres and tubes; ensure compliance with safety and transportation handling regulations for hazardous materials if applicable.
EMD is ₹200,000. GST is payable by the bidder as per actuals or the lower of actual rate and quoted rate, with no buyer responsibility for applying GST beyond the quoted terms; payment terms align with contract and drawing approvals.
Bidders or OEMs must have supplied the same or similar category products to government entities for at least 3 years, with annual contracts or evidence of quantity shipments in each year; provide relevant contract copies during bid submission.
If requested, End User Certificate will be provided in the buyer’s standard format. Ensure readiness of the certificate and include it with the bid submission if the tender requires it for final approval.
Yes. The purchaser may increase or decrease the quantity by up to 25% of bid/contract quantity at various stages, with delivery time adjusted accordingly; bidders should plan inventory and logistics to accommodate this flexibility.