TenderDekho Logo
Active GEM

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Load Cell for Leotronics 60 Ton Weighbridge System Tender Sonbhadra 2026

Bid Publish Date

04-Aug-2026, 6:41 pm

Bid End Date

01-Sep-2026, 7:00 pm

Generate Docs

Progress

Issue04-Aug-2026, 6:41 pm
Corrigendum28-Aug-2026
AwardPending

Tender Overview

Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow. Product/Service: Load cell for Leotronics make 60 Ton weighbridge system and Junction Box for PVC casing and caping. Location: Sonbhadra, Uttar Pradesh – 231205. Estimated Value / EMD: Not specified in available data. Quantity Flexibility: Purchaser may increase/decrease quantity up to 25% of bid/contract quantity; extended delivery time rules apply. This tender focuses on critical weighbridge components and associated enclosure hardware, with ATC terms referenced in uploaded document. Unique clause: option to adjust quantity at contracted rates; delivery window adjusts from the last delivery order date. This procurement requires bidders to align with option-clauses and timeline logic while supplying specified components.

Technical Specifications & Requirements

  • Product names from BOQ item line: Load cell for Leotronics 60 Ton weighbridge system and PVC junction box with casing and caping.
  • Category / Scope: Replacement or supply of weighbridge sensing element and protective enclosure for heavy-duty weighing systems.
  • Delivery considerations: Delivery period calculated via option clause; minimum 30-day base period for extended quantities; schedule tied to original delivery date.
  • Quality/Compliance: No explicit standards listed in available data; ATC doc referenced suggests additional compliance checks in the viewable terms.
  • Experience hints: The scope implies familiarity with heavy-load weighbridge components and PVC conduit/casing assemblies; no explicit certification is stated in the data.

Terms, Conditions & Eligibility

  • EMD / Security: Not specified in the provided data; bidders should verify in ATC document.
  • Delivery terms: Delivery timeline linked to original delivery order date; expanded time proportional to (Additional quantity / Original quantity) × Original delivery period, minimum 30 days.
  • Payment terms: Not detailed in the available content; bidders must consult the ATC for specifics.
  • Documents: GST, PAN, experience certificates, financial statements, and OEM authorizations are typically required; exact list to be confirmed in the ATC.
  • Warranty / Penalties: Not specified in the data; check ATC for penalties or warranty expectations.
  • Eligibility: Experience in supplying weighbridge components and compatibility with Leotronics 60 Ton systems is implied by scope; verify requirements in ATC.

Tender Data

Bid Details

Quantity

7

Category

Load Cell for Leotronics make 60 Ton weighbridge System.

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Load Cell for Leotronics make 60 Ton weighbridge System. , Junction Box for PVC Casing and Caping

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shatrughan Singh231219,Obra Thermal Power PlantSonbhadraUttar Pradesh231219460-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9680465.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Corrigendum Updates

3 Updates
#1

Update

28-Aug-2026

Extended Deadline

01-Sep-2026, 1:30 pm

Opening Date

01-Sep-2026, 2:00 pm

#2

Update

23-Aug-2026

Extended Deadline

27-Aug-2026, 1:30 pm

Opening Date

27-Aug-2026, 2:00 pm

#3

Update

17-Aug-2026

Extended Deadline

22-Aug-2026, 1:30 pm

Opening Date

22-Aug-2026, 2:00 pm

Categories 22

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the Leotronics load cell tender in Sonbhadra UP

Bidders should submit the standard bid documents per ATC: GST, PAN, experience certificates, financial statements, EMD documents, and OEM authorizations. The tender involves supplying a Leotronics 60 Ton weighbridge load cell and PVC junction box; ensure compatibility with the weighbridge system and follow 25% quantity option terms.

What documents are required for UP energy department procurements in 2026

Required documents typically include GST certificate, PAN card, detailed experience certificates of similar weighbridge projects, financial statements for last 3 years, EMD submission proof, technical bid certificates, and OEM authorization letters. Verify exact ATC-listed items before submission.

What are the delivery terms for 60 Ton weighbridge components tender in UP

Delivery is governed by the option clause: delivery period begins from the last date of original delivery order, with extended time calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days. Payment terms are not specified here; refer to ATC for specifics.

What are the key eligibility criteria for UP Rajya Vidyut Utpadan Nigam tenders

Eligibility implies capacity to supply heavy-weight weighbridge components, prior experience in similar projects, and compliance with ATC terms. Ensure ability to scale up to 25% more quantity during contract; confirm OEM authorizations and warranty expectations in the ATC.

What specifications are required for Leotronics 60 Ton load cell tender

Specific standards are not listed in the available data; bidders should review the ATC document for any IS/ISO requirements, load capacity accuracy, mounting dimensions, and electrical interface compatibility with Leotronics weighbridge systems.

When is the delivery window and payment terms for UP weighbridge tender

Delivery window is tied to the last delivery order date with extension rules; exact payment terms are not disclosed in the current data and must be confirmed in the ATC. Ensure readiness to deliver within the extended window and align with contract rates.

What is the role of the PVC junction box in the weighbridge assembly tender

The PVC junction box with casing and caping protects electrical connections for the 60 Ton weighbridge system; ensure enclosure dimensions, IP rating, and wire termination standards comply with the Leotronics specification and site installation practices.

How to verify OEM authorization for Leotronics weighbridge components tender

Obtain OEM authorization or authorized distributor certificates validating supply rights for Leotronics 60 Ton weighbridge load cells and related enclosures; include these with the technical bid as per ATC guidance and ensure product authenticity.