GEM

Bharat Petroleum Corporation Ltd Rainwater Harvesting Feasibility Study Tender Telangana 2025

Bid Publish Date

20-Nov-2025, 9:17 am

Bid End Date

02-Dec-2025, 3:00 pm

Bid Opening Date

02-Dec-2025, 3:30 pm

Progress

Issue20-Nov-2025, 9:17 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Key Highlights

  • BPCL rainwater harvesting feasibility study for Malkapur POL, Telangana
  • Option Clause allows ±25% change in contract quantity or duration pre-issuance; same cap post-issuance
  • Excess Settlement enables additional invoice charges up to a defined percentage with documentation
  • Single tender process; submission restricted to approved vendors only
  • ATC clauses govern invoicing and potential scope expansions
  • No technical BOQ or specifications available in the provided data

Categories 31

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for a feasibility study on rainwater harvesting at the BPCL Malkapur POL installation, Telangana. The contract appears to focus on study services and assessment rather than construction. The buyer specifies a single tender process with vendor-only submissions from approved suppliers. Notably, an Option Clause allows a ±25% adjustment to quantity or duration before contract issuance and a similar cap post-issuance. The arrangement includes an Excess Settlement framework permitting additional charges up to a defined percentage with required documentation. The opportunity targets vendors capable of delivering technical feasibility analysis, water balance modeling, and retrofit/implementation guidance within BPCL infrastructure contexts. Location-based procurement signals the project aligns with Telangana state energy infrastructure optimization and BPCL’s sustainability initiatives.

Technical Specifications & Requirements

  • Scope: Feasibility study for rainwater harvesting at BPCL Malkapur POL, Telangana.
  • Delivery expectations: Not explicitly defined; contract design accommodates up to ±25% in quantity or duration prior to issuance, with same cap after issuance.
  • Pricing flexibility: Excess settlement permits additional charges up to a predefined percentage of item-level totals; bidders must declare applicability during invoicing and provide supporting documents.
  • Special clauses: The tender is a single-source process with rejection of non-approved vendors; ATC clauses apply to billing and scope expansion. No BOQ items or technical specs are provided in the data.
  • Assessment criteria: Technical feasibility methods, compliance with BPCL guidelines, and alignment with Telangana regulatory contexts will be implicit evaluation factors.

Terms, Conditions & Eligibility

  • Option Clause: Quantity/duration can be adjusted by up to 25% before contract issuance; post-issuance adjustments remain within that cap.
  • Excess Settlement: Additional charges up to a specified percentage permitted; mandatory supporting documents must accompany invoices.
  • Vendor eligibility: Only approved vendors may submit bids; bids from non-approved vendors will be rejected without evaluation.
  • Documentation requirements: ATC-driven invoicing and documentation; no BOQ or detailed specs provided in the data.
  • Earnings/EMD: Not disclosed in the provided tender data; no explicit payment terms stated here; bidders should confirm with BPCL for exact terms.

Key Specifications

  • Rainwater harvesting feasibility study

  • Location: BPCL Malkapur POL installation, Telangana

  • No BOQ items or explicit technical specifications provided

  • Option Clause: ±25% adjustment before/after contract issuance

  • Excess settlement allowed with documented support for invoices

Terms & Conditions

  • Option Clause allowing 25% quantity/duration adjustments

  • Excess settlement policy with required supporting documents

  • Single tender with bids from approved vendors only

  • ATC-driven invoicing and scope-change provisions

  • No explicit BOQ, value, or delivery timeline provided

Important Clauses

Payment Terms

Excess settlement allowed with invoicing documentation; exact timing not specified in data

Delivery Schedule

Feasibility study delivery window not specified; contractual flexibility via 25% option

Penalties/Liquidated Damages

No LD details provided in data; standard BPCL ATC penalties may apply upon contract terms

Bidder Eligibility

  • Approved vendor status for BPCL tender participation

  • Demonstrated experience in feasibility studies or water resources

  • Financial capability to undertake engineering/feasibility assignments

Past Similar Tenders (Historical Results)

5 found

Custom Bid for Services - REDEVELOPMENT OF NEW BOREWELL AREA AND RESTORATION OF RAIN WATER HARVESTI

Bharat Petroleum Corporation Ltd

BARDHAMAN, WEST BENGAL

Posted: 27 February 2025
Closed: 10 March 2025
GEM

Custom Bid for Services - OPERATION OF IN-HOUSE STATUTORY TESTING & PAINTING FACILITY AT LPG BOTTLI

Marketing Division

Posted: 8 August 2025
Closed: 29 August 2025
GEM

Custom Bid for Services - Installation of Solar plant at Takli village for Drinking water supply as

Western Coalfields Limited

CHANDRAPUR, MAHARASHTRA

Posted: 3 February 2025
Closed: 14 February 2025
GEM

Custom Bid for Services - Hiring Of Support Services For Hydrological Observation At 44 Old New Sit

Central Water Commission (cwc)

CHENNAI, TAMIL NADU

Posted: 23 January 2025
Closed: 13 February 2025
GEM

Custom Bid for Services - MONSOON SUPPORT FOR CHP AND MAIN PLANT OPERATION PP2PP3 NSPCL DURGAPUR FO

Ntpc Sail Power Company Ltd

BARDHAMAN, WEST BENGAL

Posted: 21 March 2025
Closed: 9 April 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates in feasibility studies or water resource projects

4

Financial statements or bank solvency proof

5

EMD/Security deposit documentation (if applicable, amount not disclosed)

6

Technical bid documents demonstrating methodology for rainwater harvesting feasibility

7

OEM authorizations or subcontractor approvals (if any)

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for BPCL rainwater harvesting feasibility study in Telangana 2025

Bidders must be an approved BPCL vendor and submit a feasibility study proposal for rainwater harvesting at Malkapur POL, Telangana. Include technical approach, project timeline, and any scope adjustments under the 25% option clause; ensure compliance with ATC invoicing requirements.

What documents are required for BPCL feasibility study tender in Telangana

Submit GST certificate, PAN, experience certificates for similar studies, financial statements, and any OEM authorizations. Include technical bid detailing methodology for rainwater harvesting feasibility, and EMD security documentation if applicable according to BPCL terms.

What is the scope of work for BPCL Malkapur POL rainwater project

Scope centers on feasibility analysis for rainwater harvesting improvements at BPCL Malkapur POL installation. It requires assessment of water balance, site conditions, potential retrofit options, and a recommended implementation roadmap aligned with BPCL sustainability goals in Telangana.

What are the payment terms and excess settlement for BPCL tender

The tender allows an excess settlement with additional charges up to a specified percentage; bidders must declare applicability during invoicing and provide supporting documents. Exact percentage and payment cadence will be confirmed in the contract terms.

When is the tender deadline for BPCL Telangana rainwater feasibility study

Dates are not provided in the data. Bidders should monitor BPCL tender portal for notification and ensure approval status as an eligible vendor prior to submission, along with ATC-compliant invoicing processes.

What standards or certifications are required for BPCL feasibility studies

No explicit technical standards are listed in the data. Bidders should demonstrate relevant feasibility study experience and may need to align with BPCL internal guidelines; ensure documentation demonstrates capability in water resources assessment and environmental considerations.

How to prepare for BPCL vendor eligibility for this Telangana tender

Register as an approved BPCL vendor, compile experience in similar feasibility studies, gather financial documents, and prepare a detailed methodology for rainwater harvesting feasibility. Confirm EMD requirements and ATC invoicing expectations with BPCL procurement team.

What is the role of option clause in BPCL tender for Telangana

The option clause allows either party to adjust contract quantity or duration by up to 25% before issuance, enabling flexibility for scope changes. Post-issuance adjustments remain bounded by the same cap, requiring bidder acceptance of revised terms.