NK HP PUMP,NK FUEL WATER SEPARATOR,321-265-1202 SHIFTING FORT FOR SECOND AND THIRD GEAR,27890511630
Controller General Of Defence Accounts
Progress
Quantity
26
Category
Shifting Fork for Second and Third Gear
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, solicits a procurement tender for a variety of automotive components including shifting fork for second and third gear, connecting hose dia 65 300mm, union, speedometer parts, pressure switch, fuel flexible pipe, cushion rubber, lock nut M 10, hose flexible, front hub nut, body assembly throttle, packing, crank kick starter, belt alternator, and clip. The location is Pathankot, Punjab (143534). The BOQ lists 15 items, but specific unit quantities are not disclosed. The contract includes an option clause allowing up to 25% quantity variation and extended delivery time calculations, with delivery periods linked to original milestones. Bidders must ensure products are market-stable with at least 1 year residual life, and must address GST as per applicable rates. A re-supply constraint may be introduced if samples differ from approved specifications. This tender emphasizes sample approvals prior to bulk manufacturing and non-obsolete inventory at bid time.
Key differentiators include: option-based quantity adjustments, advance sample approval process, and strict conformity to contract specifications, with potential verification delays impacting delivery timelines. The buyer expects alignment with government procurement norms and GST handling obligations. Unique terms include sample-based manufacturing approval and risk-sharing on delivery timing when approval lags occur.
Product scope includes: shifting fork for transmission, 65 mm dia hoses up to 300 mm length, various unions, speedometer components, pressure switch, fuel flexible pipe, cushion rubber, M10 lock nuts, flexible hoses, front hub lock nuts, throttle body assembly packing, crank starter, alternator belt, and related clips.
No explicit technical performance specs or material standards are stated in the tender data. The terms require that offered items are not end-of-life and maintain market life of at least 1 year post-bid. The advance sample process is mandatory: 2 samples due within 5 days of award; buyer provides modification list within 5 days. Quantity adjustment: +/−25% with calculated delivery time formula. Delivery commencement linked to last delivery order date. GST handling to bidder’s discretion with actual rates.
Compliance expectations emphasize avoiding obsolescence and ensuring post-award conformity to approved sample specifications. The bid must anticipate bulk production after sample approval and maintain supply consistency with the contract’s framework.
Shifting fork for transmission (second and third gear) and associated components
Connecting hose dia 65 with 300mm length variants
Unions, speedometer parts, pressure switch, fuel flexible pipe, cushion rubber, lock nut M 10
Front hub nut, body assembly throttle, packing, crank kick starter, belt alternator, clip
Must ensure products are not end-of-life with at least 1 year residual market life
Advance sample approval: 2 samples within 5 days; modification list within 5 days after sample submission
Delivery time calculated with option clause; minimum 30 days for any extended delivery period
Option to increase/decrease quantity by up to 25% during and after contract
Advance sample approval required before bulk manufacturing
GST responsibilities lie with bidder; rates based on actuals or applicable rates
Products must have at least 1 year residual market life and not be end-of-life
Delivery periods extend based on quantity changes with a minimum 30-day extension
GST handling is bidder's responsibility; payment terms aligned to government norms and actual GST applicable.
Delivery period calculated by (increased quantity/original quantity) × original delivery period, minimum 30 days; extension possible up to original delivery period.
Delays due to buyer approval of advance samples may reset delivery schedule; deviations may trigger termination or require new samples.
Not end-of-life products with at least 1 year residual market life
GST registered bidder with valid GSTIN and PAN
Ability to provide advance samples within 5 days of contract award
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Controller General Of Defence Accounts
Nlc India Limited
CUDDALORE, TAMIL NADU
Indian Army
RI BHOI, MEGHALAYA
Indian Army
KARGIL, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Shifting Fork for Second and Third Gear | Shifting Fork for Second and Third Gear | 1 | nos | hemant6002 | 15 |
| 2 | Connecting Hose Dia 65 300MM | Connecting Hose Dia 65 300MM | 1 | nos | hemant6002 | 15 |
| 3 | Union | Union | 5 | nos | hemant6002 | 15 |
| 4 | Speedometer | Speedometer | 1 | nos | hemant6002 | 15 |
| 5 | Pressure Switch | Pressure Switch | 1 | nos | hemant6002 | 15 |
| 6 | Fuel Flexible Pipe | Fuel Flexible Pipe | 1 | nos | hemant6002 | 15 |
| 7 | Cushion Rubber | Cushion Rubber | 4 | nos | hemant6002 | 15 |
| 8 | Lock Nut M 10 | Lock Nut M 10 | 1 | nos | hemant6002 | 15 |
| 9 | Hose Flexible | Hose Flexible | 1 | nos | hemant6002 | 15 |
| 10 | Front Hub Nut Lock | Front Hub Nut Lock | 1 | nos | hemant6002 | 15 |
| 11 | Body Assy Throttle | Body Assy Throttle | 1 | nos | hemant6002 | 15 |
| 12 | Packing | Packing | 1 | nos | hemant6002 | 15 |
| 13 | Crank Kick Stater | Crank Kick Stater | 1 | nos | hemant6002 | 15 |
| 14 | Belt Alternator | Belt Alternator | 2 | nos | hemant6002 | 15 |
| 15 | Clip | Clip | 4 | nos | hemant6002 | 15 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Any OEM authorizations or technical compliance certificates if applicable
Samples for advance approval (2 samples required within 5 days of award)
Key insights about PUNJAB tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and ensure non-obsolescence with at least 1 year residual market life. Advance two samples are required within 5 days of award; approval or modification takes up to 5 days. Deliveries use the 25% quantity variation clause and GST handled per actuals.
Submit PAN, GSTIN, cancelled cheque, EFT mandate; provide any OEM authorizations and technical compliance certificates if available. Ensure GST compliance and prepare to supply advance samples (2 units) within 5 days of award for bulk production approval.
Delivery can be increased or decreased by up to 25% of bid quantity. The delivery extension uses (increased quantity/original quantity) × original delivery period, with a minimum 30 days and possible extension to the original delivery period.
Items must not be end-of-life and should have at least 1 year of residual market life post-bid, ensuring market availability and supplier support during the contract.
Bidders must determine GST applicability; the purchaser reimburses GST as actuals or at the prevailing rate, whichever is lower, subject to quoted GST percentage and bidder responsibility.
Two samples must be submitted within 5 days of award; buyer approves or lists modifications within 5 days; bulk supply must follow approved sample. Delays in approval may reset delivery timelines without LD penalties.
Items include shifting fork for transmission, connecting hoses 65 mm dia 300 mm length, unions, speedometer parts, pressure switch, fuel pipe, cushion rubber, M10 lock nut, front hub nut, throttle body packing, crank starter, belt alternator, and related clips.
Bidders must avoid end-of-life products, ensure 1 year residual market life, provide GSTIN, PAN, and EFT mandate, and be prepared for advance sample submission and approvals before bulk manufacturing.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS