TenderDekho Logo
Closed GEM

Bids are Invited For LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS in ALLAHABAD, UTTAR PRADESH

Bid Publish Date

24-Sep-2026, 4:07 pm

Bid End Date

08-Oct-2026, 4:00 pm

EMD

₹60,000

Generate Docs

Progress

Issue24-Sep-2026, 4:07 pm
Corrigendum05-Oct-2026
AwardPending

Indian Army announces a tender for LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2), Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2), XLPE Cable for Working Voltage up to and Including 1. 1 KV Marked To IS 7098 (Part 1) (Q2), Self Ballasted LED Lamps (LED Bulb) Conforming to IS 16102 (Part 2) (V3) (Q2), LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2), Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Flexible Conductor (V2) ISI Marked To IS 694 (Q2), Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2) in ALLAHABAD, UTTAR PRADESH. Quantity: 2252. Submission Deadline: 08-10-2026 16: 00: 00. Last date to apply is approaching fast!

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

2252

Category

Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854

Bid Type

Two Packet Bid

Bid Validity

150 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

10

OEM Avg. Turnover

60

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) , LED Batten Light (LED Tube Light) (V2) (Q2) , LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) , Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) , XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) , Self Ballasted LED Lamps (LED Bulb) Conforming to IS 16102 (Part 2) (V3) (Q2) , LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2) , Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) , PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Flexible Conductor (V2) ISI Marked To IS 694 (Q2) , Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2)

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

1

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

FAIZABAD

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-FAIZABADFAIZABAD--730-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9891378.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 33

Corrigendum Updates

1 Update
#1

Update

05-Oct-2026

Extended Deadline

08-Oct-2026, 10:30 am

Opening Date

09-Oct-2026, 10:30 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement