Eastern Coalfields Limited Flange MS and Valve Procurement Tender Bardhaman West Bengal ISI/IS 550 Compliant 2026
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Bid Publish Date
14-Jul-2026, 8:38 am
Bid End Date
24-Jul-2026, 9:00 am
Location
Progress
Quantity
142
Security Printing And Minting Corporation Of India Limited (SPMCIL) invites bids for a range of metal piping components including MS short bend, MS flange, CI Y strainer, balancing valve, MS forged socket, SS thermowell, gasket ring, SS siphon tube with cock, and MS hex nut bolt. The BOQ lists 10 total items, with no explicit quantities provided. The contract envisions a 60-day delivery window from contract issue, and a 3-month warranty from last delivery. A delivery-time extension mechanism exists for up to 25% quantity variation at contracted rates. The buyer also requires compliance with PAN and GST, and supplier undertakings on blacklisting, deviations, and capability to supply. 100% payment is issued within 10 days after CRAC, bill submission, and acceptance. A 0.5% weekly LD up to a maximum of 10% contract value applies for delays.
Product names: MS short bend, MS flange, CI Y strainer, balancing valve, MS forged socket, SS thermowell, gasket ring, SS siphon tube with cock, MS hex nut bolt
Delivery: 60 days from contract issue; extended period as per option clause
Warranty: 3 months from date of last delivery
Payment: 100% within 10 days after acceptance and CRAC report
Compliance: PAN, GST; ABMS; non-blacklisting undertakings
Delivery period and option for 25% quantity increase/decrease at contracted rates
Mandatory PAN and GST registration with supporting proof
3-month post-delivery warranty and LD regime for delays
100% payment within 10 days after CRAC and acceptance by ISP/SPMCIL
100% payment within 10 days from CRAC report, bill submission, and acceptance of goods
60 days from contract issue; option to increase quantity up to 25% with extension rules
0.5% of contract value for each week of delay, up to a maximum of 10% of contract value
Must have PAN and GST registration with proof
Must provide undertakings on non-blacklisting and deviation withdrawal
Capability to supply the tendered MS/MS piping components within 60 days
Tender Category
Goods
Bid To RA
No
Item Category
MS short bend , MS Flange , CI Y Strainer , Balancing valve , MS Forged socket , SS Thermowell , Gasket Ring , SS Syphon tube with cock , MS Hex Nut Bolt
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Nashik
Delivery Pincodes
422101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vikas Kumar | 422101,India Security Press, Nashik Road Nashik , Maharashtra | Nashik | Maharashtra | 422101 | 30 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Indian Coast Guard
CHENNAI, TAMIL NADU
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
DHANBAD, JHARKHAND
Tender Results
Loading results...
MS short bend
MS short bend
MS Flange
MS Flange
CI Y Strainer
CI Y Strainer
Balancing valve
Balancing valve
MS Forged socket
MS Forged socket
MS Forged socket
MS Forged socket
SS Thermowell
SS Thermowell
Gasket Ring
Gasket Ring
SS Syphon tube with cock
SS Syphon tube with cock
MS Hex Nut Bolt
MS Hex Nut Bolt
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | MS short bend | MS short bend | 30 | ea | [email protected] | 60 | |
| 2 | MS Flange | MS Flange | 40 | ea | [email protected] | 60 | |
| 3 | CI Y Strainer | CI Y Strainer | 2 | ea | [email protected] | 60 | |
| 4 | Balancing valve | Balancing valve | 2 | ea | [email protected] | 60 | |
| 5 | MS Forged socket | MS Forged socket | 12 | ea | [email protected] | 60 | |
| 6 | MS Forged socket | MS Forged socket | 4 | ea | [email protected] | 60 | |
| 7 | SS Thermowell | SS Thermowell | 6 | ea | [email protected] | 60 | |
| 8 | Gasket Ring | Gasket Ring | 30 | ea | [email protected] | 60 | |
| 9 | SS Syphon tube with cock | SS Syphon tube with cock | 6 | ea | [email protected] | 60 | |
| 10 | MS Hex Nut Bolt | MS Hex Nut Bolt | 10 | kg | [email protected] | 60 |
Discover companies most likely to bid on this tender
PAN / Income Tax registration proof
GST registration certificate
Proof of blacklisting status (or not) and undertaking
Undertakings on deviation withdrawal and capability to supply
Delivery capability statement and past supply experience
Technical compliance documents (if any) and OEM authorizations (if applicable)
Bill of Materials alignment and supplier details
CRAC report submission plan (post-award) and warranty commitments
Bidders must register PAN and GST, submit non-blacklisting undertakings, and provide capability to supply. Include technical certificates, OEM authorizations if applicable, and ensure delivery within 60 days. The bid requires 100% payment terms within 10 days after CRAC and acceptance, plus ABMS compliance.
Submit PAN and GST evidence, a blacklisting undertaking, capability to supply statement, delivery schedule plan for 60 days, warranty commitment (3 months), and any OEM authorizations. Include CRAC-related documents to enable 100% payment within 10 days post-acceptance.
Delivery must occur within 60 days from contract issue, with possible extension up to a 25% quantity change. Warranty lasts 3 months from the date of last delivery; penalties apply as 0.5% of contract value per week for delays, up to 10%.
Once CRAC report is issued, bills submitted, and goods accepted, the purchaser releases 100% payment within 10 days. This facilitates cash flow for suppliers meeting compliance and delivery milestones.
The tender requires PAN and GST registration, anti-bribery ABMS compliance, and declarations of non-blacklisting. While specific material standards aren’t listed, suppliers must demonstrate capability to supply the listed components and comply with internal ABMS and statutory requirements.
Liquidated damages are calculated at 0.5% of the contract value per week (or part thereof) of delayed quantity, with a maximum cap of 10% of the contract value for delayed quantity, excluding force majeure scenarios.
BOQ lists 10 items including MS short bend, MS flange, CI Y strainer, balancing valve, MS forged socket, SS thermowell, gasket ring, SS siphon tube with cock, and MS hex nut bolt; exact quantities are not disclosed in the data, requiring bidder confirmation during final submission.
N/a
📍 LUCKNOW, UTTAR PRADESH
Indian Navy
📍 MUMBAI, MAHARASHTRA
N/a
📍 PILIBHIT, UTTAR PRADESH
Directorate Of Purchase And Stores
📍 MUMBAI, MAHARASHTRA
Indian Coast Guard
📍 PORBANDAR, GUJARAT
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS