Indian Army Leo jammer battery procurement DODA Jammu & Kashmir 2025
Indian Army
DODA, JAMMU & KASHMIR
Bid Publish Date
28-Oct-2025, 6:36 pm
Bid End Date
08-Nov-2025, 7:00 pm
Location
Progress
RAQuantity
28
Category
Battery for Leo Jammer
Bid Type
Two Packet Bid
The procurement is issued by the Indian Army (Department of Military Affairs) for critical electrical and electronic components associated with the Leo Jammer system. The scope includes Battery for Leo Jammer, Toggle Switch 3A, Battery Charger Leo Jx, and Resistors 10 Ohm and 20 Ohm. The tender references five total items within the BOQ, though exact quantities and estimated values are not disclosed in the available data. Delivery expectations are governed by option clauses enabling quantity adjustments up to 25% during and after the contract, with delivery time recalculated based on the original period and extended quantity. The location is not disclosed in the tender data, and no start/end dates are provided. This bid requires compliance with the purchaser’s ATC terms and standard Vendor Code creation prerequisites. Unique aspects include supplier eligibility checks, financial health undertakings, and mandatory certificate uploads. Bidders should be prepared to respond to quantity flexibilities and extended delivery time calculations, with clear adherence to the Indian Army’s procurement process and ATC documents.
Product: Battery for Leo Jammer
Product: Toggle Switch 3A
Product: Battery Charger Leo Jx
Product: Resistance 10 Ohm
Product: Resistance 20 Ohm
Total items in BOQ: 5 (N/A quantities in data)
Delivery: option clause allows up to 25% quantity variation
Delivery time: calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Inspection: SLBR52 reference in terms
Standards: not specified in data; ATC documents will define exact technical standards
Quantity variation up to 25% is permitted by the buyer during contract and currency
Mandatory submission of PAN, GSTIN, cancelled cheque, and EFT mandate
Compliance with ATC, Corrigendum, and Vendor Code creation requirements
Delivery schedule ties to original and extended periods with a 30-day minimum
Non-submission of required documents leads to bid rejection
Not disclosed in the available data; bidders must consult ATC for terms and milestones
Delivery can be increased up to 25% during contract; time extension calculated per formula with minimum 30 days
Not disclosed in the available data; refer to ATC for LD provisions
No current liquidation or insolvency proceedings; provide undertaking
Submit PAN and GSTIN; provide EFT Mandate
Meet ATC and Corrigendum requirements and upload all certificates
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
Indian Army
ANANTHNAG, JAMMU & KASHMIR
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Battery for Leo Jammer | Battery for Leo Jammer | 7 | pieces | fri2rr | 15 |
| 2 | Toggle Switch 3A | Toggle Switch 3A | 3 | pieces | fri2rr | 15 |
| 3 | Battery Charger Leo Jx | Battery Charger Leo Jx | 4 | pieces | fri2rr | 15 |
| 4 | Resistance 10 Ohm | Resistance 10 Ohm | 10 | pieces | fri2rr | 15 |
| 5 | Resistance 20 Ohm | Resistance 20 Ohm | 4 | pieces | fri2rr | 15 |
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by Bank
Vendor Code Creation documents
ATC and Corrigendum compliance certificates
Any other certificates requested in Bidding Document
Start
15-Nov-2025, 7:00 pm
End
17-Nov-2025, 7:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | EON INFOTECH LIMITED(MSE) Under PMA Winner | ₹1,72,595 | Item Categories : Battery for Leo Jammer,Toggle Switch 3A,Battery Charger Leo Jx,Resistance 10 Ohm,Resistance 20 Ohm |
| L2 | EDUREAL INC (MSE) Under PMA | ₹1,86,574 | Item Categories : Battery for Leo Jammer,Toggle Switch 3A,Battery Charger Leo Jx,Resistance 10 Ohm,Resistance 20 Ohm |
🎉 L1 Winner
EON INFOTECH LIMITED(MSE) Under PMA
Final Price: ₹1,72,595
Key insights about JAMMU AND KASHMIR tender market
Bidders should prepare to submit PAN, GSTIN, cancelled cheque, and EFT Mandate along with ATC-compliant certificates. Ensure vendor code creation is completed and all five BOQ items are addressed. The clause allows up to 25% quantity variation and requires adherence to delivery calculations with a minimum 30-day extension.
Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and any ATC/compliant certificates. Also provide vendor code creation documents and any certificates requested in the bidding document; non-submission leads to rejection per terms.
The Purchaser may increase quantity up to 25% during execution. Delivery time for additional quantity is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extension can occur within original delivery period limits.
The bundle includes Battery for Leo Jammer, Toggle Switch 3A, Battery Charger Leo Jx, and Resistors 10 Ohm and 20 Ohm as five total items; precise quantities are not disclosed in the data and will be specified in the ATC/BOQ.
Specific standards are not listed in the provided data; bidders must refer to ATC for exact technical standards and compliance requirements, including any IS/ISO certifications as applicable to defense electrical components.
Exact start and end dates are not provided in the available information. Bidders must consult the ATC and the bidding portal for the official bid submission window and any corrigenda affecting timelines.
Vendor code creation is a mandatory step in the registration process; bidders must upload related documents and obtain vendor code before bid submission to participate in the defense tender.
Payment terms are not specified in the available data; bidders should review the ATC for milestones, advance payments, and settlement timelines once the contract is awarded.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS