Progress
RAIndian Army announces a tender for Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3), Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2), Towel Rail (Q3), Tower Bolts (Non-Ferrous Metals) V2 as per IS 204 (Q2), Bathroom or Toilet Mirror (V3) (Q4), Plywood for General Purposes Marked to IS 303 (V3) (Q2), Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3) in JORHAT, ASSAM. Quantity: 668. Submission Deadline: 17-09-2026 13: 00: 00. Last date to apply is approaching fast!
Start
27-Sep-2026, 4:00 pm
End
28-Sep-2026, 4:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
668
Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
14
OEM Avg. Turnover
56
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) , Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2) , Towel Rail (Q3) , Tower Bolts (Non-Ferrous Metals) V2 as per IS 204 (Q2) , Bathroom or Toilet Mirror (V3) (Q4) , Plywood for General Purposes Marked to IS 303 (V3) (Q2) , Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3)
Advisory Bank
State Bank of India
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
JORHAT
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | JORHAT | JORHAT | - | - | 60 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer