MR Item Sr. No. 01.001[ DA-31801] : Supply Of Cartridge Trays,MR Item Sr. No. 02.001 & 02.002: Site
Engineers India Limited
DAKSHINA KANNADA, KARNATAKA
Bid Publish Date
23-Dec-2025, 12:07 pm
Bid End Date
13-Jan-2026, 10:00 am
Location
Progress
Quantity
108
Category
SOR532_Item1 POWER SUPPLY UNIT AC TO DC
Bid Type
Two Packet Bid
Indian Air Force has released a public tender for SOR532_Item1 POWER SUPPLY UNIT AC TO DC, SOR532_Item2 DIODE PIN CHIP, SOR532_Item3 CARTRIDGE ELEMENT, SOR532_Item4 IC EPM7128EL1 84 20, SOR532_Item5 IC MM58274CN Micropro Real Time Clock, SOR532_Item6 IC MAV-11SM Monolithic AMP 10 1000MZH, SOR532_Item7 IC 44 PIN PLCC SKT, SOR532_Item8 68 PIN SOCKET PLCC in PUNE, MAHARASHTRA. Quantity: 108. Submission Deadline: 13-01-2026 10: 00: 00. Download documents and apply online.
Engineers India Limited
DAKSHINA KANNADA, KARNATAKA
Indian Navy
MUMBAI, MAHARASHTRA
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Indian Navy
MUMBAI, MAHARASHTRA
Indian Navy
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SOR532_Item1 POWER SUPPLY UNIT AC TO DC | POWER SUPPLY UNIT (AC TO DC) | 10 | pieces | sloprov | 120 |
| 2 | SOR532_Item2 DIODE PIN CHIP | DIODE (PIN) CHIP | 3 | pieces | sloprov | 120 |
| 3 | SOR532_Item3 CARTRIDGE ELEMENT | CARTRIDGE ELEMENT | 17 | pieces | sloprov | 120 |
| 4 | SOR532_Item4 IC EPM7128EL1 84 20 | IC EPM7128EL1-84-20 | 3 | pieces | sloprov | 120 |
| 5 | SOR532_Item5 IC MM58274CN Micropro Real Time Clock | IC MM58274CN Micropro Real Time Clock | 10 | pieces | sloprov | 120 |
| 6 | SOR532_Item6 IC MAV-11SM Monolithic AMP 10 1000MZH | IC MAV-11SM Monolithic AMP 10-1000MZH | 25 | pieces | sloprov | 120 |
| 7 | SOR532_Item7 IC 44 PIN PLCC SKT | IC 44 PIN PLCC SKT | 20 | pieces | sloprov | 120 |
| 8 | SOR532_Item8 68 PIN SOCKET PLCC | 68 PIN SOCKET PLCC | 20 | pieces | sloprov | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS