Bid Publish Date
07-Aug-2026, 10:25 am
Bid End Date
20-Aug-2026, 11:00 am
Location
Progress
The procurement is led by the Indian Army under the Department Of Military Affairs for a multiple-item list including pressure plate, oil seal, fan belt, clutch sleeve cyl, seal plain, and brake shoe rear. The BOQ comprises 8 items but no itemized quantities are disclosed. The scope is explicitly defined as supply of goods only, with an inspection regime and an option to adjust quantity by up to 25% at contract award or during execution. Delivery timelines will adapt to changes based on the option clause, with a minimum extension of 30 days. This tender requires adherence to the Army’s internal bid terms and condition framework. The combination of broad product category and undefined itemization suggests a technical evaluation centered on supplier capability and compliance. The unique inspection framework references a nominated agency and a sample opening location in Kargil, signaling a structured quality assurance pathway. A single, uniform supply contract for 8 disparate items is anticipated, with post-receipt inspection to validate conformity at the consignee site. This tender in the context of the Indian Army procurement landscape emphasizes reliable supply chain readiness, standardization of components, and robust quality control.
Product categories: pressure plate, oil seal, fan belt, clutch sleeve cylinder, seal plain, brake shoe rear
BOQ: 8 items with no quantities disclosed
Inspection: Nominated Inspection Agency, pre-dispatch sample opening (OC 851FWC, Kargil) if ATC selected, post-receipt inspection by BD officer
Delivery: option-based timing with minimum 30 days extension, scope limited to goods supply
Option to adjust quantity up to 25% during contract period
Delivery extensions calculated by formula with minimum 30 days
Inspection regime via nominated agency and BD officer; pre/post inspection specifics
Not specified in data; bidders should assume standard Govt. terms and ensure clarity on payment milestones in final ATC
Delivery timeline governed by option clause and calculated extensions; minimum 30 days new delivery period if extended
Not specified in the available data; confirm LD terms in final contract
Experience in supplying mechanical components to defense or government bodies
Demonstrated financial stability with verifiable turnover
Ability to meet inspection and QA requirements of nominated agencies
Quantity
26
Category
fan belt
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
70 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
pressure plate , oil seal , fan belt , clutch sleeve cyl , seal plain , brake shoe rear
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kargil
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Kargil | Kargil | - | - | 5 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
pressure plate
pressure plate
oil seal
oil seal
fan belt
fan belt
clutch sleeve cyl
clutch sleeve cyl
seal plain
seal plain
oil seal
oil seal
oil seal
oil seal
brake shoe rear
brake shoe rear
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | pressure plate | pressure plate | 5 | pieces | [email protected] | 15 | |
| 2 | oil seal | oil seal | 4 | pieces | [email protected] | 15 | |
| 3 | fan belt | fan belt | 4 | pieces | [email protected] | 15 | |
| 4 | clutch sleeve cyl | clutch sleeve cyl | 3 | pieces | [email protected] | 15 | |
| 5 | seal plain | seal plain | 3 | pieces | [email protected] | 15 | |
| 6 | oil seal | oil seal | 3 | pieces | [email protected] | 15 | |
| 7 | oil seal | oil seal | 3 | pieces | [email protected] | 15 | |
| 8 | brake shoe rear | brake shoe rear | 1 | pieces | [email protected] | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of goods
Financial statements or turnover documentation
EMD/Security deposit documentation (if applicable per Army terms)
Technical bid documents and conformity certificates
OEM authorization letters (if required by item category)
Key insights about JAMMU AND KASHMIR tender market
Bidders should submit Proof of GST, PAN, experience certificates and financials, plus OEM authorizations if required. The scope is goods supply only, with an option to adjust quantity up to 25%. Ensure compliance with nominated inspection agency rules and post-receipt acceptance processes.
Submit GST certificate, PAN, experience certificates for similar supplies, financial statements, EMD/Security deposit documentation, technical compliance certificates, and OEM authorizations where applicable. Preparation should align with the buyer’s terms and ATC conditions.
Inspection is conducted by a nominated inspection agency; pre-dispatch sample opening may occur at seller premises if ATC triggers; post-receipt inspection is carried out by the BD officer at the consignee site. Ensure readiness for both phases.
Quantity may be increased up to 25% of the bid quantity at contract placement and during currency at contracted rates. Additional time is computed as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
The BOQ covers 8 items including pressure plate, oil seal, fan belt, clutch sleeve cylinder, seal plain, and brake shoe rear. Quantities are not disclosed; suppliers should prepare for multiple configurations within the 25% option window.
The scope is strictly supply of goods; no installation or services are described. Delivery timelines follow the option-based extension rules with a minimum of 30 days for additional time, and delivery begins after final order placement.
No explicit standards are listed in the data; bidders should be prepared to meet Army QA practices and provide conformity certificates, OEM authorizations, and inspection-ready packaging in alignment with the nominated agency's criteria.
Payment terms are not specified in the data; expect standard Govt. terms. Vendors should seek confirmation on milestone-based payments, guarantees, and any advance or security deposits within the ATC appendix.