TenderDekho Logo
Closed GEM

Open Tender for Tower 1,Tower 2,Tower 3,Tower 4,Tower 5,Tower 6 in DHANBAD, JHARKHAND

Bid Publish Date

07-Feb-2025, 6:56 pm

Bid End Date

01-Apr-2025, 12:00 pm

EMD

₹6,82,754

Generate Docs

Progress

Issue07-Feb-2025, 6:56 pm
Technical03-May-2025, 1:52 pm
Financial
Award04-Jul-2025, 12:36 am
Explore all 5 tabs to view complete tender details

Quantity

372

Category

Tower 1

Bid Type

Two Packet Bid

Categories 13

Public procurement opportunity for Damodar Valley Corporation Tower 1, Tower 2, Tower 3, Tower 4, Tower 5, Tower 6 in DHANBAD, JHARKHAND. Quantity: 372 issued by. Submission Deadline: 01-04-2025 12: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Tower 1 , Tower 2 , Tower 3 , Tower 4 , Tower 5 , Tower 6

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-7489010.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Tower 1

Supplying, Fabricating & Galvanising various tower members / structures / gantries / extensions etc. including supply of pack washers, Hangers, D-Shackles, Extension links, U-bolts etc. complete, at shop / site with contractors own tools & tackles, crane & labour complete bolted and / or welded connections with G.I. bolts, nuts, washers, etc. complete as per drgs specifications & directions. (Supply of G.I. bolts, nuts, step bolts & spring washers will be paid separately)- Mild Steel as per Grade Designation E250A ( Fe410W)

270 metric tonne Delivery: 180 days
#2

Tower 2

Supplying, Fabricating & Galvanising various tower members / structures / gantries / extensions etc. including supply of pack washers, Hangers, D-Shackles, Extension links, U-bolts etc. complete, at shop / site with contractors own tools & tackles, crane & labour complete bolted and / or welded connections with G.I. bolts, nuts, washers, etc. complete as per drgs specifications & directions. (Supply of G.I. bolts, nuts, step bolts & spring washers will be paid separately)- High Tensile Steel as per Grade Designation E350 ( Fe490)

65 metric tonne Delivery: 180 days
#3

Tower 3

Supplying, Fabricating & Galvanising stub & cleat members of various type of tower members / structures etc. including supply of pack washers etc. complete, at shop / site with contractors own tools & tackles, crane & labour complete as per drgs specifications & directions. (supply of G.I. bolts, nuts & spring washers will be paid separately)- Mild Steel as per Grade Designation E250A ( Fe410W)

13 metric tonne Delivery: 180 days
#4

Tower 4

Supplying, Fabricating & Galvanising stub & cleat members of various type of tower members / structures etc. including supply of pack washers etc. complete, at shop / site with contractors own tools & tackles, crane & labour complete as per drgs specifications & directions. (supply of G.I. bolts, nuts & spring washers will be paid separately)- High Tensile Steel as per Grade Designation E350 ( Fe490)

6 metric tonne Delivery: 180 days
#5

Tower 5

Supply of GI Bolts, Nuts (Grade-5.6) with spring washers of assorted sizes for towers including step bolts etc complete as per drgs., specifications and directions.

17 metric tonne Delivery: 180 days
#6

Tower 6

Supply of GI Bolts, Nuts (Grade-8.8) with spring washers of assorted sizes for towers including step bolts etc complete as per drgs., specifications and directions.

1 metric tonne Delivery: 180 days

Corrigendum Updates

4 Updates
#1

Update

25-Mar-2025

Extended Deadline

01-Apr-2025, 12:00 pm

Opening Date

01-Apr-2025, 12:30 pm

#2

Update

17-Mar-2025
#3

Update

17-Mar-2025

Extended Deadline

24-Mar-2025, 12:00 pm

Opening Date

24-Mar-2025, 12:30 pm

#4

Update

10-Mar-2025

Extended Deadline

17-Mar-2025, 12:00 pm

Opening Date

17-Mar-2025, 12:30 pm

Technical Results

S.No Seller Item Date Status
1
NAMDHARI INDUSTRIAL TRADERS PRIVATE LIMITED   Under PMA
-05-03-2025 13:52:12
2
RABI ENGINEERING WORKS PRIVATE LIMITED   Under PMA
-21-03-2025 19:22:54

Financial Results

Rank Seller Price Item
L1
NAMDHARI INDUSTRIAL TRADERS PRIVATE LIMITED(MII)   Under PMA
Item Categories : Tower 1,Tower 2,Tower 3,Tower 4,Tower 5,Tower 6

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about JHARKHAND tender market

What are the eligibility requirements for bidding on the procurement of spare towers?

The eligibility requirements include being a registered entity capable of providing the specified spare towers. Bidders must present valid GST registration and relevant compliance certifications. Previous experience with similar projects would also strengthen a bidder's proposal. Financial stability is essential, underscoring the importance of delivering consistent quality and adherence to safety standards in past commitments.

What technical specifications must be met for the towers?

Bidders must adhere to rigorous technical specifications found in the linked documents which detail the required standards for the tower designs. These specifications cover aspects relating to structural integrity, material standards, and other engineering norms essential for ensuring efficient performance within the delivery of 132 KV, 220 KV, and 400 KV lines.

What is the Earnest Money Deposit (EMD) requirement and performance security for this tender?

The Earnest Money Deposit (EMD) for this tender is set at ₹682,754. This financial security is crucial for bids to ensure seriousness and financial capability. Moreover, successful bidders will be required to provide a performance security as a form of guarantee for the execution of the contract in accordance with the agreed terms.

How should the bid documents be submitted, and what formats are accepted?

Bidders must submit their proposals electronically, including all requisite documents in PDF format. This includes the signed integrity pact and technical compliance documents. Adherence to submission guidelines outlined in the main tender document is essential to ensure a valid proposal.

What benefits do Micro, Small, and Medium Enterprises (MSEs) receive in this tender?

MSEs may benefit from special provisions that may include price advantages or relaxations during the evaluation process. This aligns with governmental policies to encourage the participation of smaller enterprises in larger procurement processes, fostering inclusive growth and competitive bidding.

By addressing these essential aspects in the FAQs, bidders can attain a clearer understanding of requirements and constraints associated with this procurement process.