TenderDekho Logo
Active GEM

Indian Army Buck Converter ESP32 SIM800L Battery Smoke Detector Tender 2026

Bid Publish Date

08-Oct-2026, 9:50 am

Bid End Date

19-Oct-2026, 10:00 am

Progress

Issue08-Oct-2026, 9:50 am
AwardPending

Tender Overview

The Indian Army (Department Of Military Affairs) invites bids for multiple electronic modules including Buck Converter, ESP32, SIM800L, Battery assemblies and Smoke Detectors. The BOQ lists 5 total items, with no explicit quantity or unit details published. Estimated value and EMD are not disclosed. The procurement aims to equip field electronics and safety devices, potentially involving integrated microcontroller and wireless SIM modules. A notable differentiator is the option clause allowing up to 25% quantity variation at contracted rates, impacting delivery planning and financial settlements. Bidders should prepare for flexible quantities and phased deliveries, aligned to the extended delivery window rules.

Technical Specifications & Requirements

  • Product/service categories: Buck Converter, ESP32 module, SIM800L GSM module, Battery packs, Smoke detectors
  • 5 total items in BOQ with unspecified quantities
  • Delivery terms: option clause allows 25% increase/decrease in order quantity; delivery period adjusts based on the formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Standards/compliance: not specified in tender data; bidders should infer general microelectronics and safety device standards as applicable
  • OEM/brand notes: no explicit brand requirements published; bidders may need to demonstrate capability across modular electronics integration and field deployment
  • Experience and capability: no explicit experience thresholds published; prepare to show system integration, testing, and quality controls for military electronics
  • Inspection/acceptance: not detailed; bidders should anticipate standard government inspection procedures for electronic assemblies

Terms, Conditions & Eligibility

  • EMD: not disclosed in tender data; bidders should anticipate standard security deposit requirements
  • Quantity variation: up to 25% during contract, with adjustment rules as described in the option clause
  • Delivery timeline: base delivery period not specified; additional time computed per option clause with minimum 30 days
  • Payment terms: not specified; bidders should plan for government procurement norms
  • Documents: GST, PAN, experience certificates, financial statements, technical bid documents, OEM authorizations are typical requirements; verify submission checklist in final tender
  • Penalties/warranty: not specified; bidders should seek clarity on LD and warranty terms during bid submission

Key Specifications

  • Product categories: Buck Converter, ESP32 module, SIM800L GSM module, Battery packs, Smoke detectors

  • BOQ: Total 5 items with unspecified quantities

  • Delivery clause: 25% quantity variation at contract; delivery period adjusts with formula; minimum 30 days

  • Standards: not specified; bidders should ensure general electronics safety and environmental compliance

  • Warranty/AMC: not specified; request explicit terms during bid submission

Terms & Conditions

  • Option Clause allows ±25% quantity adjustment at contracted rates

  • Delivery period recalculated based on (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

  • EMD and exact payment terms are not disclosed; bidders must seek clarification and prepare standard government documents

Important Clauses

Payment Terms

Not specified; bidders must obtain explicit terms during bid submission

Delivery Schedule

Delivery period adjusts with option clause; minimum 30 days; computation based on quantity change

Penalties/Liquidated Damages

Not specified; bidders should confirm LD terms and performance bonds in final tender

Bidder Eligibility

  • Demonstrated capability in supplying modular electronics and safety devices to defense/government buyers

  • GST registration and PAN; financial stability evidence

  • OEM authorizations for ESP32, SIM800L and Buck Converter components

Advertisement

Tender Data

Bid Details

Quantity

8

Category

Buck Convertor

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Buck Convertor , ESP32 , SIM800L , Battery , Smoke detector

Pre-Bid & Qualification

Pre-Bid Date

09-10-2026 09:00:00

Pre-Bid Venue

Pre-Bid venue held with 47 FWC with sample

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Ambala

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AmbalaAmbala--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9990360.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Buck Convertor

Buck Convertor

1 pieces Delivery: 15 days
#2

ESP32

ESP32

2 pieces Delivery: 15 days
#3

SIM800L

SIM800L

2 pieces Delivery: 15 days
#4

Battery

Battery

1 pieces Delivery: 15 days
#5

Smoke detector

Smoke detector

2 pieces Delivery: 15 days
Advertisement

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates for similar electronic module projects

4

Financial statements (balance sheet/PL for last 2-3 years)

5

EMD/Security deposit documents (as per purchaser norms)

6

Technical bid/quality compliance certificates

7

OEM authorizations or ISOs for ESP32/SIM800L/Buck Converter modules

8

Any project delivery or testing records relevant to military electronics

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for Indian Army electronics tender 2026 in India

Bidders must meet eligibility criteria including GST registration, PAN, and financial statements, plus OEM authorizations for ESP32/SIM800L. The tender involves five item categories: Buck Converter, ESP32, SIM800L, Battery packs, and Smoke detectors. Ensure compliance with option clause and confirm delivery terms and EMD requirements during bid submission.

What documents are required for Indian Army buck converter tender

Required documents typically include GST certificate, PAN, company financials, experience certificates for similar military electronics, OEM authorizations for components, and technical bid documents. Prepare evidence of capability to deliver integrated electronics and safety devices, and ensure all documents align with the tender’s terms.

What are the technical specifications for ESP32 and SIM800L in this tender

No explicit technical specs were published; bidders should demonstrate compatibility of ESP32 with GSM module SIM800L, including power management, firmware integration, and environmental tolerance. Provide BOM details, testing results, and adherence to standard microelectronics safety practices.

When is the delivery deadline under the Indian Army procurement

The tender provides an option-based delivery framework with a minimum 30-day delivery window for additional quantities. The exact base delivery period is not specified; bidders should request clarified delivery timelines and plan for phased deployment aligned to the option clause.

What are the EMD requirements for this government tender

The tender does not disclose the EMD amount. Bidders should confirm the EMD or security deposit value, acceptable payment method (DD/online), and submission deadlines in the final tender documents before bid submission.

How to ensure compliance with the 25% option clause in procurement

Prepare capacity and supply chain data to absorb up to 25% quantity change. Include delivery planning, updated costings at contracted rates, and scheduling buffers. Document how additional quantities will be integrated without disrupting military electronics deployment.

What brands or OEMs are preferred for Buck Converter and ESP32 modules

The tender does not specify brand preferences; bidders should provide credible OEM authorizations and demonstrate compatibility with ESP32 and Buck Converter components. Include certifications, warranty coverage, and supply history with defense or government organizations.

What inspection and acceptance criteria apply to Indian Army electronics

Not stated explicitly; bidders should prepare for standard government inspection and testing of electronic modules. Include conformity with electrical safety, EMI/EMC considerations, environmental testing, and documentation such as test reports and certificates to support acceptance.

Advertisement