TenderDekho Logo
Active GEM

Tender Notice for High Strength Deformed Steel Bars and Wires for Concrete Reinforcement (V2) ISI marked to IS 1786,H in CACHAR, ASSAM

Bid Publish Date

14-Oct-2026, 12:38 pm

Bid End Date

26-Oct-2026, 10:00 am

EMD

₹8,00,000

Location

Progress

Issue14-Oct-2026, 12:38 pm
AwardPending

A tender has been published for Border Road Organisation High Strength Deformed Steel Bars and Wires for Concrete Reinforcement (V2) ISI marked to IS 1786 (Q2), Shuttering Plate Size 1 pt 0 X 0 pt 400 mtr, Shuttering Plate Size 1 pt 0 X 0 pt 212 mtr, Shuttering Plate Size 1 pt 0 X 1 pt 16 mtr, Shuttering Plate Size 0 pt 72 X 0 pt 82 mtr, Shuttering Plate Size 1 pt 0 X 1 pt 0 mtr, Shuttering Plate Size 1 pt 0 X 0 pt 35 mtr, Shuttering Plate Size 1 pt 0 X 0 pt 70 mtr, Shuttering Plate Size 0 pt 60 X 0 pt 35 mtr, Shuttering Plate Size 0 pt 30 X 1 pt 0 mtr, Shuttering Plate Size 0 pt 31 X 1 pt 0 mtr, Shuttering Plate Size 1 pt 0 X 0 pt 25 mtr, Shuttering Plate Size 0 pt 60 X 0 pt 25 mtr, Shuttering Plate Size 0 pt 60 X 0 pt 31 mtr, Shuttering Plate Size 0 pt 55 X 1 pt 0 mtr, Shuttering Plate Size 0 pt 60 X 0 pt 55 mtr, Shuttering Plate Size 0 pt 31 X 0 pt 90 mtr, Vertical pipe 48 pt 3 mm dia, Horizontal pipe 48 pt 3 mm dia, Shuttering nut and bolt, Right Angle Coupler for Jointer MS pipe 48 pt 3 mm dia, Swivel Coupler for Jointer MS pipe 48 pt 3 mm dia, Decorative Garden Lamp Post, Two Tier Decorative Plant Stand, LED Decorative Strip Light, Two Seater Waiting Chair, Double Bed Wooden Charpoy With Mattress, Metal Polish in CACHAR, ASSAM. Quantity: 8266 by. Submission Deadline: 26-10-2026 10: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

8266

Category

Shuttering nut and bolt

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

High Strength Deformed Steel Bars and Wires for Concrete Reinforcement (V2) ISI marked to IS 1786 (Q2) , Shuttering Plate Size 1 pt 0 X 0 pt 400 mtr , Shuttering Plate Size 1 pt 0 X 0 pt 212 mtr , Shuttering Plate Size 1 pt 0 X 1 pt 16 mtr , Shuttering Plate Size 0 pt 72 X 0 pt 82 mtr , Shuttering Plate Size 1 pt 0 X 1 pt 0 mtr , Shuttering Plate Size 1 pt 0 X 0 pt 35 mtr , Shuttering Plate Size 1 pt 0 X 0 pt 70 mtr , Shuttering Plate Size 0 pt 60 X 0 pt 35 mtr , Shuttering Plate Size 0 pt 30 X 1 pt 0 mtr , Shuttering Plate Size 0 pt 31 X 1 pt 0 mtr , Shuttering Plate Size 1 pt 0 X 0 pt 25 mtr , Shuttering Plate Size 0 pt 60 X 0 pt 25 mtr , Shuttering Plate Size 0 pt 60 X 0 pt 31 mtr , Shuttering Plate Size 0 pt 55 X 1 pt 0 mtr , Shuttering Plate Size 0 pt 60 X 0 pt 55 mtr , Shuttering Plate Size 0 pt 31 X 0 pt 90 mtr , Vertical pipe 48 pt 3 mm dia , Horizontal pipe 48 pt 3 mm dia , Shuttering nut and bolt , Right Angle Coupler for Jointer MS pipe 48 pt 3 mm dia , Swivel Coupler for Jointer MS pipe 48 pt 3 mm dia , Decorative Garden Lamp Post , Two Tier Decorative Plant Stand , LED Decorative Strip Light , Two Seater Waiting Chair , Double Bed Wooden Charpoy With Mattress , Metal Polish

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

6

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Cachar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-CacharCachar--3945-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9957059.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

Shuttering Plate Size 1 pt 0 X 0 pt 400 mtr

As per Specification

96 nos Delivery: 45 days
#2

Shuttering Plate Size 1 pt 0 X 0 pt 212 mtr

As per Specification

144 nos Delivery: 45 days
#3

Shuttering Plate Size 1 pt 0 X 1 pt 16 mtr

As per Specification

24 nos Delivery: 45 days
#4

Shuttering Plate Size 0 pt 72 X 0 pt 82 mtr

As per Specification

12 nos Delivery: 45 days
#5

Shuttering Plate Size 1 pt 0 X 1 pt 0 mtr

As per Specification

276 nos Delivery: 45 days
#6

Shuttering Plate Size 1 pt 0 X 0 pt 35 mtr

As per Specification

96 nos Delivery: 45 days
#7

Shuttering Plate Size 1 pt 0 X 0 pt 70 mtr

As per Specification

108 nos Delivery: 45 days
#8

Shuttering Plate Size 0 pt 60 X 0 pt 35 mtr

As per Specification

12 nos Delivery: 45 days
#9

Shuttering Plate Size 0 pt 30 X 1 pt 0 mtr

As per Specification

24 nos Delivery: 45 days
#10

Shuttering Plate Size 0 pt 31 X 1 pt 0 mtr

As per Specification

12 nos Delivery: 45 days
#11

Shuttering Plate Size 1 pt 0 X 0 pt 25 mtr

As per Specification

24 nos Delivery: 45 days
#12

Shuttering Plate Size 0 pt 60 X 0 pt 25 mtr

As per Specification

12 nos Delivery: 45 days
#13

Shuttering Plate Size 0 pt 60 X 0 pt 31 mtr

As per Specification

6 nos Delivery: 45 days
#14

Shuttering Plate Size 0 pt 55 X 1 pt 0 mtr

As per Specification

24 nos Delivery: 45 days
#15

Shuttering Plate Size 0 pt 60 X 0 pt 55 mtr

As per Specification

12 nos Delivery: 45 days
#16

Shuttering Plate Size 0 pt 31 X 0 pt 90 mtr

As per Specification

12 nos Delivery: 45 days
#17

Vertical pipe 48 pt 3 mm dia

As per Specification

180 nos Delivery: 45 days
#18

Horizontal pipe 48 pt 3 mm dia

As per Specification

48 nos Delivery: 45 days
#19

Shuttering nut and bolt

As per Specification

6,000 nos Delivery: 45 days
#20

Right Angle Coupler for Jointer MS pipe 48 pt 3 mm dia

As per Specification

450 nos Delivery: 45 days
#21

Swivel Coupler for Jointer MS pipe 48 pt 3 mm dia

As per Specification

450 nos Delivery: 45 days
#22

Decorative Garden Lamp Post

As per Specification

8 nos Delivery: 45 days
#23

Two Tier Decorative Plant Stand

As per Specification

4 nos Delivery: 45 days
#24

LED Decorative Strip Light

As per Specification

90 mtr Delivery: 45 days
#25

Two Seater Waiting Chair

As per Specification

6 nos Delivery: 45 days
#26

Double Bed Wooden Charpoy With Mattress

As per Specification

6 nos Delivery: 45 days
#27

Metal Polish

As per Specification

2 bottle Delivery: 45 days

Categories 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement