TenderDekho Logo
Closed GEM

Bids are Invited For Teja TJ-1400P-M3-24HPD-E layer-3 switch 24 port,12 Core SM OFC cable armoured,24 Port LIU fully loa in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

18-Sep-2026, 12:37 pm

Bid End Date

03-Oct-2026, 1:00 pm

EMD

₹30,000

Progress

Issue18-Sep-2026, 12:37 pm
AwardPending

Indian Navy has released a public tender for Teja TJ-1400P-M3-24HPD-E layer-3 switch 24 port, 12 Core SM OFC cable armoured, 24 Port LIU fully loaded, SC-LC fiber patch cards-10 mtrs, LC-E2000 OFC path cards SM-50 mtrs, LC-E2000 OFC path cards SM-100 mtrs, LC-LC fiber patch cards SM-3 mtrs, 9U wall mount rack 600 x 600 depth, SM transceivers SFP 10 100 1000 MBPS, UTP patch panel, UTP cable CAT 6, UTP patch cards CAT-6-1 mtrs, UTP CAT 6 I and O boxes, Casing and Capping, 3 KVA UPS with 240 Min backup time, Laying of SM 12 core OFC cable, Laying of 2 inches casing and capping, Laying of UTP cable, Fixing of I O boxes, Fixing of 9U racks, Fixing jack panel, Fixing of LIU fully loaded, Connectorisation of CAT-6 UTP cable with ports, Connectorisation of CAT-6 UTP cable, Single mode OFC splicing in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 1300. Submission Deadline: 03-10-2026 13: 00: 00. Download documents and apply online.

Advertisement

Authority & Contact

Organization

Indian Navy

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1300

Category

Teja TJ-1400P-M3-24HPD-E layer-3 switch 24 port

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Teja TJ-1400P-M3-24HPD-E layer-3 switch 24 port , 12 Core SM OFC cable armoured , 24 Port LIU fully loaded , SC-LC fiber patch cards-10 mtrs , LC-E2000 OFC path cards SM-50 mtrs , LC-E2000 OFC path cards SM-100 mtrs , LC-LC fiber patch cards SM-3 mtrs , 9U wall mount rack 600 x 600 depth , SM transceivers SFP 10 100 1000 MBPS , UTP patch panel , UTP cable CAT 6 , UTP patch cards CAT-6-1 mtrs , UTP CAT 6 I and O boxes , Casing and Capping , 3 KVA UPS with 240 Min backup time , Laying of SM 12 core OFC cable , Laying of 2 inches casing and capping , Laying of UTP cable , Fixing of I O boxes , Fixing of 9U racks , Fixing jack panel , Fixing of LIU fully loaded , Connectorisation of CAT-6 UTP cable with ports , Connectorisation of CAT-6 UTP cable , Single mode OFC splicing

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Visakhapatnam

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VisakhapatnamVisakhapatnam--190-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9785991.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

Teja TJ-1400P-M3-24HPD-E layer-3 switch 24 port

Teja TJ-1400P-M3-24HPD-E layer-3 switch 24 port

1 nos Delivery: 90 days
#2

12 Core SM OFC cable armoured

12 Core SM OFC cable armoured

150 mtrs Delivery: 90 days
#3

24 Port LIU fully loaded

24 Port LIU fully loaded

1 nos Delivery: 90 days
#4

SC-LC fiber patch cards-10 mtrs

SC-LC fiber patch cards-10 mtrs

8 nos Delivery: 90 days
#5

LC-E2000 OFC path cards SM-50 mtrs

LC-E2000 OFC path cards SM-50 mtrs

8 nos Delivery: 90 days
#6

LC-E2000 OFC path cards SM-100 mtrs

LC-E2000 OFC path cards SM-100 mtrs

4 nos Delivery: 90 days
#7

LC-LC fiber patch cards SM-3 mtrs

LC-LC fiber patch cards SM-3 mtrs

4 nos Delivery: 90 days
#8

9U wall mount rack 600 x 600 depth

9U wall mount rack 600 x 600 depth

1 nos Delivery: 90 days
#9

SM transceivers SFP 10 100 1000 MBPS

SM transceivers SFP 10 100 1000 MBPS

2 nos Delivery: 90 days
#10

UTP patch panel

UTP patch panel

1 nos Delivery: 90 days
#11

UTP cable CAT 6

UTP cable CAT 6

305 mtrs Delivery: 90 days
#12

UTP patch cards CAT-6-1 mtrs

UTP patch cards CAT-6-1 mtrs

20 nos Delivery: 90 days
#13

UTP CAT 6 I and O boxes

UTP CAT 6 I and O boxes

4 nos Delivery: 90 days
#14

Casing and Capping

Casing and Capping

150 mtrs Delivery: 90 days
#15

3 KVA UPS with 240 Min backup time

3 KVA UPS with 240 Min backup time

1 nos Delivery: 90 days
#16

Laying of SM 12 core OFC cable

Laying of SM 12 core OFC cable

150 mtrs Delivery: 90 days
#17

Laying of 2 inches casing and capping

Laying of 2 inches casing and capping

150 mtrs Delivery: 90 days
#18

Laying of UTP cable

Laying of UTP cable

305 mtrs Delivery: 90 days
#19

Fixing of I O boxes

Fixing of I O boxes

4 nos Delivery: 90 days
#20

Fixing of 9U racks

Fixing of 9U racks

1 nos Delivery: 90 days
#21

Fixing jack panel

Fixing jack panel

1 nos Delivery: 90 days
#22

Fixing of LIU fully loaded

Fixing of LIU fully loaded

1 nos Delivery: 90 days
#23

Connectorisation of CAT-6 UTP cable with ports

Connectorisation of CAT-6 UTP cable with ports of jack panel

8 nos Delivery: 90 days
#24

Connectorisation of CAT-6 UTP cable

Connectorisation of CAT-6 UTP cable with 2 ports I/O boxes

4 nos Delivery: 90 days
#25

Single mode OFC splicing

Single mode OFC splicing/connectorisation

16 cores Delivery: 90 days

Categories 21

Advertisement