TenderDekho Logo
Active GEM

State Bank Of India Air Conditioning System Supply and Installation Tender Jalandhar Punjab 2026

Bid Publish Date

10-Sep-2026, 1:26 pm

Bid End Date

21-Sep-2026, 2:00 pm

Progress

Issue10-Sep-2026, 1:26 pm
AwardPending

Tender Overview

The State Bank of India (SBI) invites bids for the supply and installation of an air conditioning system at SBI facilities in Jalandhar, Punjab. The procurement scope is described as a supply and installation project under the Department of Financial Services. Quantities and estimated contract value are not disclosed, but bidders should anticipate installation services alongside equipment supply. A key differentiator is a flexible option clause allowing up to 25% quantity adjustments during and after contract signing, with delivery timelines tied to the last delivery order date. Bidders must align with SBI procurement processes and comply with the option-based delivery extension mechanism.

Technical Specifications & Requirements

  • Category: Air conditioning system supply and installation for SBI facility in Jalandhar, Punjab.
  • No explicit technical specifications or BOQ items are provided in the tender data.
  • The contract includes installation services in addition to supply, implying coordination with on-site commissioning and possible testing.
  • The option clause enables a 25% increase/decrease in quantity at contracted rates, with delivery period adjustments calculated as (Increased quantity ÷ Original quantity) × Original delivery period, subject to a minimum of 30 days.
  • Bidders should prepare for integration with existing infrastructure and adherence to standard installation practices.

Terms, Conditions & Eligibility

  • The Purchaser reserves the right to modify quantity up to 25% of bid quantity at contract placement and during currency of contract.
  • Delivery period begins from the last date of the original delivery order; extended delivery time follows the same proportional formula with a minimum of 30 days.
  • Bidders must comply with option clause terms and SBI procurement procedures.
  • No specific EMD amount or payment terms are disclosed in the available data; bidders should anticipate standard government tender practice and verify during bid submission.
  • BOQ shows Total Items: 0, indicating missing itemized details in the provided data.

Key Specifications

  • Product/service names: air conditioning system supply and installation

  • Estimated value: not disclosed

  • Quantities: not disclosed (option clause allows ±25%)

  • Delivery-related terms: delivery period calculated per last delivery order date; minimum 30 days for extensions

  • Experience: prior air conditioning installation experience recommended

  • Standards/Certifications: not specified in data; bidders should confirm any standard compliance during bid

Terms & Conditions

  • Key Term 1: 25% quantity variation allowed during contract performance

  • Key Term 2: Delivery period extension formula based on increased/decreased quantity

  • Key Term 3: No BOQ items; check for site-specific installation requirements during bid

Important Clauses

Payment Terms

Not specified in data; bidders must verify SBI procurement terms during bid submission

Delivery Schedule

Delivery starts from last date of original delivery order; extended delivery time follows (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days

Penalties/Liquidated Damages

Not specified in data; bidders should obtain LD terms during bid clarification

Bidder Eligibility

  • Experience in supplying/installing air conditioning systems for financial institutions or similar facilities

  • Demonstrated financial capability (based on last 2-3 years statements)

  • GST registration and PAN compliance

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

15 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CUSTOM BID FOR SUPPLY AND INSTALLATION OF AIR CONDITIONING SYSTEM

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Jalandhar

Delivery Pincodes

144001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Santosh Kumar144001,State Bank of India, RBO 4, Jalandhar (61357), 2nd Floor, Civil Lines, Near Sky Lark Hotel, Jalandhar-144001, Contact: 0181-5165620JalandharPunjab144001115-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENTSTATE BANK OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9875363.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Local Head Office Sector 17a Chandigarh

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing prior air conditioning supply/install projects

4

Financial statements (last 2-3 years) or turnover proof

5

Earnest Money Deposit (EMD) receipt or exemption document (as applicable)

6

Technical bid documents and compliance statements

7

OEM authorization or authorized distributor certificate (if applicable)

8

Company profile and key personnel qualifications

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for SBI air conditioning tender in Jalandhar Punjab 2026

Bidders should submit the technical and financial bids as per SBI procurement guidelines, include GST and PAN, obtain OEM authorizations if required, and provide experience certificates for AC system supply/installation. Ensure EMD is prepared if mandated and confirm the 25% quantity variation clause is understood.

What documents are required for SBI AC tender submission in Punjab

Required documents typically include GST certificate, PAN card, experience certificates for AC installations, financial statements, EMD proof, technical bid compliance, OEM authorization, and company profile. Prepare step-by-step with clear evidence of prior AC projects and installation capabilities.

What are the delivery terms for SBI air conditioning installation tender

Delivery starts after the original delivery order date, with extension time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, and a minimum extension of 30 days. Ensure installation readiness aligns with on-site scheduling and commissioning requirements.

What are the eligibility criteria for SBI Punjab AC bid 2026

Eligibility includes demonstrated AC supply/installation experience, acceptable financial stability (annual turnover may be viewed in bid documents), GST and PAN compliance, and capability to supply/install at SBI facilities in Jalandhar. OEM authorizations strengthen eligibility if required by SBI.

How will quantity variation affect the SBI AC tender 2026

The purchaser may increase or decrease quantity up to 25% at contracted rates. Delivery time adjusts proportionally to the new quantity, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a 30-day minimum extension.

What standards or certifications are expected for SBI AC installation

Data does not specify exact standards; bidders should anticipate standard industry practices and confirm any required certifications (e.g., electrical safety, installation commissioning). Include compliance statements in the technical bid and obtain OEM or authorised supplier documentation if applicable.

When is the bid submission deadline for SBI Jalandhar AC tender

The tender data provided does not include a hard deadline. Bidders should monitor the official SBI procurement portal or GEM notices for the bid opening date and ensure timely submission of all required documents, including EMD if applicable.

What is the scope of work for SBI air conditioning installation in Punjab

Scope includes both supply of air conditioning units and installation at SBI facility in Jalandhar, Punjab. Since BOQ items are not listed, bidders should seek site-specific drawings and installation requirements during bid clarification and prepare for on-site commissioning.