Progress
The State Bank of India (SBI) invites bids for the supply and installation of an air conditioning system at SBI facilities in Jalandhar, Punjab. The procurement scope is described as a supply and installation project under the Department of Financial Services. Quantities and estimated contract value are not disclosed, but bidders should anticipate installation services alongside equipment supply. A key differentiator is a flexible option clause allowing up to 25% quantity adjustments during and after contract signing, with delivery timelines tied to the last delivery order date. Bidders must align with SBI procurement processes and comply with the option-based delivery extension mechanism.
Product/service names: air conditioning system supply and installation
Estimated value: not disclosed
Quantities: not disclosed (option clause allows ±25%)
Delivery-related terms: delivery period calculated per last delivery order date; minimum 30 days for extensions
Experience: prior air conditioning installation experience recommended
Standards/Certifications: not specified in data; bidders should confirm any standard compliance during bid
Key Term 1: 25% quantity variation allowed during contract performance
Key Term 2: Delivery period extension formula based on increased/decreased quantity
Key Term 3: No BOQ items; check for site-specific installation requirements during bid
Not specified in data; bidders must verify SBI procurement terms during bid submission
Delivery starts from last date of original delivery order; extended delivery time follows (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Not specified in data; bidders should obtain LD terms during bid clarification
Experience in supplying/installing air conditioning systems for financial institutions or similar facilities
Demonstrated financial capability (based on last 2-3 years statements)
GST registration and PAN compliance
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
15 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CUSTOM BID FOR SUPPLY AND INSTALLATION OF AIR CONDITIONING SYSTEM
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Jalandhar
Delivery Pincodes
144001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Santosh Kumar | 144001,State Bank of India, RBO 4, Jalandhar (61357), 2nd Floor, Civil Lines, Near Sky Lark Hotel, Jalandhar-144001, Contact: 0181-5165620 | Jalandhar | Punjab | 144001 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing prior air conditioning supply/install projects
Financial statements (last 2-3 years) or turnover proof
Earnest Money Deposit (EMD) receipt or exemption document (as applicable)
Technical bid documents and compliance statements
OEM authorization or authorized distributor certificate (if applicable)
Company profile and key personnel qualifications
Key insights about PUNJAB tender market
Bidders should submit the technical and financial bids as per SBI procurement guidelines, include GST and PAN, obtain OEM authorizations if required, and provide experience certificates for AC system supply/installation. Ensure EMD is prepared if mandated and confirm the 25% quantity variation clause is understood.
Required documents typically include GST certificate, PAN card, experience certificates for AC installations, financial statements, EMD proof, technical bid compliance, OEM authorization, and company profile. Prepare step-by-step with clear evidence of prior AC projects and installation capabilities.
Delivery starts after the original delivery order date, with extension time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, and a minimum extension of 30 days. Ensure installation readiness aligns with on-site scheduling and commissioning requirements.
Eligibility includes demonstrated AC supply/installation experience, acceptable financial stability (annual turnover may be viewed in bid documents), GST and PAN compliance, and capability to supply/install at SBI facilities in Jalandhar. OEM authorizations strengthen eligibility if required by SBI.
The purchaser may increase or decrease quantity up to 25% at contracted rates. Delivery time adjusts proportionally to the new quantity, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a 30-day minimum extension.
Data does not specify exact standards; bidders should anticipate standard industry practices and confirm any required certifications (e.g., electrical safety, installation commissioning). Include compliance statements in the technical bid and obtain OEM or authorised supplier documentation if applicable.
The tender data provided does not include a hard deadline. Bidders should monitor the official SBI procurement portal or GEM notices for the bid opening date and ensure timely submission of all required documents, including EMD if applicable.
Scope includes both supply of air conditioning units and installation at SBI facility in Jalandhar, Punjab. Since BOQ items are not listed, bidders should seek site-specific drawings and installation requirements during bid clarification and prepare for on-site commissioning.