Bid Publish Date
26-Sep-2026, 12:02 pm
Bid End Date
06-Oct-2026, 1:00 pm
Value
₹4,39,314
Location
Progress
Western Coalfields Limited (WCL), Coal India Limited subsidiary, invites bids for the fabrication of 3 pontoons with 72 drums for the Chhinda and New Sethia OCM, RWA-CDA Sub-Area, Pench Area, Chhindwara district, Madhya Pradesh. The procurement targets a total estimated value of ₹439,314 with no BOQ items published. The scope includes creating 3 pontoons and associated 72 drums, supporting operations at the Pench Area, with a focus on equipment readiness for OCM activities. Unique aspects include flexible contract quantity/duration up to 25% at tender/award, and multiple acceptable EMD/Performance Security formats through GeM terms.
Although explicit technical specs are not provided, the tender clearly targets fabrication of pontoon structures with drum assemblies for mining support vessels. Critical context includes: 3 pontoons, 72 drums, service location at Pench Area, Chhindwara district, Madhya Pradesh. Bidders should anticipate engineering compliance, on-site fabrication capabilities, and coordination with WCL Pench Area for alignment with OCM needs. In the absence of a published BOM, bidders may submit standard pontoon fabrication capabilities and describe drum attachment methods, load distribution considerations, and maintenance access provisions. Ensure readiness to map to GeM ATC clauses and potential scope amendments up to 25%.
Key dates/ID not disclosed in tender data; bidders should monitor GeM portal for award timelines.
Product/service names and categories: pontoon fabrication with 72 drums
Quantities/volumes: 3 pontoons; 72 drum assemblies
Estimated value: ₹439,314
Delivery/installation: location Pench Area, Chhindwara, MP
Experience: capability to fabricate pontoon structures for mining operations
Quality/standards: not explicitly specified; bidders should propose standard pontoon fabrication practices and discuss testing/commissioning
25% contract quantity/duration variation permitted at award or issue
EMD/PS options include DD, RTGS, or online payment; documentary proof required
FDR accepted as Performance Security; original document to be delivered within 15 days
GeM GTC-compliant payment and security mechanisms apply
Delivery timeline not explicitly stated; seek clarification during bid process
EMD/Performance Security may be submitted as DD, FDR, or online RTGS; payment transfer must specify contract number and seller name; scanned proof to be uploaded with bid; hard copies to be delivered within 15 days of award
No explicit deadline published; bidders should coordinate with Pench Area for manufacturing, testing, and handover timelines; potential scope adjustments up to 25% may influence delivery planning
Not specified in the provided data; bidders should anticipate standard GeM/Company penalties and seek clarity during bid submission
Demonstrated experience in pontoon fabrication or similar marine/mining support structures
Financial capacity to handle a ~₹4.39 lakh contract and related working capital
Ability to submit EMD via multiple approved modes (DD/RTGS/FDR) and provide compliance documents
Quantity
1
Similar Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant/ Systems/Equipments
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
7 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
7 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - Fabrication of 03 nos Pontoons with 72 drums/pontoons for Chhinda and New Sethia OCM, RWA-CDA Sub-Area, Pench Area, WCL
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Chhindwara
Delivery Pincodes
480447
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| MUNUSAMY ELUMALAI | 480447,Regional Stores, WCL Pench Area P.O CHANDAMETA Distt. Chhindwara, M.P 480447 GSTN: 23AAACW1578L1Z4 | Chhindwara | Madhya Pradesh | 480447 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar pontoon fabrication work
Financial statements (audited/unaudited) for the last 2 years
EMD submission proof (DD/RTGS/FDR/PBG) and online payment receipt
Technical bid documents and compliance certificates
OEM authorizations or endorsements (if applicable)
Proof of factory/manufacturing capability and past project references
Key insights about MADHYA PRADESH tender market
Bidders must submit GST, PAN, experience proofs, financial statements, and EMD via DD/RTGS/FDR; upload scanned proofs and deliver hard copies within 15 days of award; ensure compliance with GeM terms and 25% scope flexibility.
Required documents include GST certificate, PAN, 2+ years of financials, experience certificates for pontoon fabrication, EMD proof, OEM authorizations (if any), and technical compliance proofs; submit online with bid and deliver hard copies as instructed.
Expected to fabricate 3 pontoons with 72 drum assemblies for Chhinda & New Sethia OCM; bidders should describe load distribution, attachment methods, and maintenance access; explicit standards are not published, so provide standard pontoon fabrication methodology and testing approach.
EMD may be submitted via Account Payee DD in favor of WCL Pench Area or online RTGS; payment terms align with GeM GTC; ensure to provide contract number and seller name in transfer details; hard copies due within 15 days post-award.
ATC allows a 25% increase or decrease in contract quantity or duration at tender and after award; for lumpsum-based services, scope may increase with the service provider's consent and will be adjusted in contract value accordingly.
Eligibility includes demonstrated pontoon fabrication capability for mining support structures, financial capacity to manage ~₹439k scope, and submission of GST, PAN, experience certificates, EMD proof, and technical compliance documentation; OEM authorizations may enhance eligibility where applicable.
Submit EMD via DD/RTGS/FDR with scanned proof; if winning, provide original security within 15 days; PBG or alternative PS may be used per GeM GTC; ensure online payment details match contract information.
Coordinate with Pench Area for fabrication, testing, and handover; 25% scope flexibility may affect timelines; ensure alignment with OCM operations at Chhinda and New Sethia; prepare installation and commissioning plan with site readiness.