1/2 HP SINGLE PHASE SQ CAGE AC MOTOR, SUPPLY VOLT: 220V AC, RPM: 1440, AMP: 4.2A, FRAME: B56(Code-2
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Bid Publish Date
19-Jan-2026, 1:22 pm
Bid End Date
29-Jan-2026, 6:00 pm
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
Organization: Alloy Steel Plant (Institute within Steel Authority of India Limited). Product: SQ. CAGE INDUCTION MOTOR(CI CONSTRUCTION) IE-2, DOL START, 55 KW, 2 POLE, 3 PHASE (MAT code-275683000). Estimated Value: not disclosed. Location: not specified in data. Scope centers on procurement of induction motors with specific motor construction and efficiency class, including post‑award risk provisions and bid security declarations. The ATC includes an option clause allowing quantity variation up to 25%, with delivery time recalculated per formula and minimum 30 days. A bid security declaration is required. Distinct terms emphasize risk purchase and supplier obligation to comply with contract extensions and altered delivery timelines.
Option clause enables ±25% quantity variation during and after contract at contracted rates
Bid Securing Declaration required; failure to sign/complete contract triggers risk‑purchase consequences
Post‑receipt inspection at ASP store; pre‑dispatch inspection not specified
Not specified in data; subject to contract terms post award
Delivery period starts from last date of original delivery order; extended period calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not specified; risk purchase rights exercisable for non‑delivery; price differential borne by defaulting supplier
Submit PAN and GSTIN; EFT mandate certified by bank
Provide Bid Securing Declaration; sign contract if awarded
Maintain compliance with risk purchase terms and delivery obligations
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Andrew Yule And Company Limited
NADIA, WEST BENGAL
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Directorate Of Purchase And Stores
KHAMMAM, TELANGANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate (certified by Bank)
Bid Securing Declaration (Annexure-1) with acceptance of risk and contract signing obligations
Any existing OEM authorization for 55 kW 2-pole induction motor (if applicable)
Key insights about WEST BENGAL tender market
Bidders should prepare PAN, GSTIN, Cancelled Cheque and EFT mandate, plus a Bid Securing Declaration. Ensure compliance with the option clause allowing up to 25% quantity variation and confirm post‑receipt inspection at ASP store. The contract may include risk‑purchase clauses; bidders must be prepared to deliver within extended timelines.
Required submissions include PAN, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and a Bid Securing Declaration. OEM authorizations are recommended if you supply the 55 kW 2‑pole induction motor; ensure manufacturer TC/GC are available for post‑receipt inspection.
The buyer may vary quantity up to 25% at contract; delivery period recalculation starts from the last date of original delivery order with a minimum 30 days extension; the supplier must adapt to extended timelines under the option clause.
Post receipt inspection will be conducted at the indentor ASP store against Manufacturer TC & GC. Pre‑dispatch inspection is not specified in ATC; ensure motor packaging and documentation align to TC/GC requirements.
The requirement specifies a 55 KW, 2 POLE, IE-2, DOL START, 3 PHASE cage induction motor with CI construction; MAT code is 275683000. There are no additional technical specs listed in the data.
Penalties are not explicitly defined; however, risk purchase rights allow sourcing from alternate suppliers at the defaulting party’s cost, and price differentials are charged to the supplier.
If delivery is delayed, the purchaser may procure from alternate sources at the supplier’s risk and cost. The defaulting supplier bears any price difference; cancellation protections apply to undelivered quantities as progress dictates.
OEM authorization is advisable to demonstrate supply capability; the data requires Bid Securing Declaration and post‑award TC/GC compliance, and OEM documents strengthen eligibility for the 55 kW IE‑2 motor with CI construction.
Madhya Pradesh Power Generating Company Limited
📍 ANUPPUR, MADHYA PRADESH
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS